Bat DWG DD PR 01 WW 2201 r1 WWTP Piping Layout
Bat DWG DD PR 01 WW 2201 r1 WWTP Piping Layout
NORTH
NOR
17900
10420
24000
15000
TH
440
440
GIANT
56000
8400
71449
VIDEO CONFERENCE
D MANUFACTURING ROOM
L& ROOM
FIN. OPS ROOM
FIN. OPS ROOM
OPS FIN. OPS ROOM
FIN.
SMOKING ROOM
PANTRY ROOM
ROOM MANUFACTURING
ROOM
AHU
MUSHOLLA
MANUFACTURING
MEETING ROOM
ROOM
SMOKING
ROOM
C L&C BREAKOUT
C L& ROOM
L& PROC. ROOM MANUFACTURING
PROC. ROOM ROOM
SPARE WH ROOM
PANEL ROOM
ROOM
WOMAN'S
MAN'S OFFICE
ROOM JAN. WUDHU WUDHU OPEN
SPARE
WOMAN'S OF THE LOBBY)
TOILET AREA (RIGHT
PROJECT
ROOM
SERVER
ROOM
STORAGE SUPPLY
DOCUMENT
PLANNING
ROOM
MAN'S
OPEN OFFICE LOBBY) TOILET
OF THE
AREA (LEFT
OF
HEAD
CHAIN
SUPPLY
QUALITY ROOM
STORAGE
DOCUMENT VISITOR TECH QUALITY & PA
VISITOR ROOM & PA ROOM
MEETING TECH SERVICE ROOM
ROOM TS SERVICE ROOM
ROOM HEAD OF
PM ROOM ROOM
ROOM
LOBBY
WOMAN'S
TOILET PROCUREMENT
PROCUREMENT ROOM
PAYROLL ROOM
HR HR ROOM
HEAD OF HR ROOM
MEETING
ROOM ROOM ROOM
MEETING
ROOM
MAN'S
TOILET
52
51 50 49
55 54 53
59
58 57 56
63
62 61 60
66 65 64
69
68 68 67
72 71 70
28 27 26
32
31 30 29
35 34 33
37 36
41
40 39 38
44 43 42
48
47 46 45
2 1
6
5 5 4 3
9 8 7
13
12 11 10
16 15 14
20 19 18 17
24
23 22 21
Karangplos
25
Batu via
arah Kota
Jalan ke
HST R-M8/10
HST R-M8/10
HST R-M8/10
SAMPLE
BLEND
HST R-M8/10 HST R-M8/10
ATION
HST R-M8/10
HST R-M8/10
WMS
HST R-M8/10
ROOM
HST R-M8/10 HST R-M8/10
IP DRY CHEMICAL
ROOM ROOM
HST R-M8/10
HST R-M8/10
HST R-M8/10
HST R-M8/10
WASHING ROOM
HST R-M8/10
HST R-M8/10
HST R-M8/10
HST R-M8/10
HST R-M8/10
4
mx
3
m
DDS ROOM
CHEMICAL
STORAGE
SPAREPART
STORAGE
HD1
HD1
HD1
3000
2000
LOBBY LOKER
AHU.2 AHU.4
AHU.1 AHU.3
80 TR 120 TR 80 TR 120 TR PBCK7
GUTTER SLOOPE GUTTER SLOOPE GUTTER SLOOPE GUTTER SLOOPE GUTTER SLOOPE GUTTER SLOOPE
ROOM
AHUTR
120 UNIT
(EKSISTING PUNYA PT BENTOEL) AHUTR
120 UNIT
(EKSISTING PUNYA PT BENTOEL)
GUTTER SLOOPE
GUTTER SLOOPE
GUTTER SLOOPE
GUTTER SLOOPE
GUTTER SLOOPE GUTTER SLOOPE
GUTTER SLOOPE
GUTTER SLOOPE
GUTTER SLOOPE
GUTTER SLOOPE
SLOPE
RAMP
8%
RAMP
GUTTER SLOOPE GUTTER SLOOPE SLOPE 8%
TOW
STORAGE
1500
1700
AHU
ROOM
1700
1700
1700
1700
2611
8000
2962
1000
WC
PANTRY
WC KM/WCKM/WC
GUDANG
16700
LOBBY
1229
STAR MILD
ROOM
KP
OPENING
KP
100 TR
UP
FILTER GEDUNG
14
WAREHOUSE
wc wc
GEDUNG
14B
AHU FINISH
GOOD
300
590
5875 4916 4901 4916 4901 5076 4726 4886
300
590
300
590
2131
300
590
300
F1 CE
2000
DISPLAY
KP
OPENING
7644
LOBBY AREA
KP
CE
LOBBY AREA
KP
LOCATION
OPENING
eta Ap
C1
FFL.+1.125
EL.- 0.325
C1
KIRANI
OFFICE
OPENING
TOILET
C1
MUSHOLLAH
ARSIP ROOM
C1
WUDHU
OPENING
CONTROL ROOM
C1
LOCKET
Rel Ker
GLUE INTERFACE
WASH OFFICE
BARTHA
TOILET SMD
DDS
ROOM
RAMP
PAVEMENT ROAD
EL. ±0.000 PAVEMENT ROAD
EL. -0.300
STP
CV. USTEGRA
foam MENTHOL
collection pit
MIXER
9
PSA KRETEK BUFFER MENTHOL
KRETEK ROOM QC LAB
4260
EL. ±0.000 MATERIAL
mixer 3 30 M2
+ Load Scale MATERIAL STORAGE PAVEMENT ROAD
STORAGE
ROOM
WASHING
EL. -0.300
800
8 (COLD ROOM) (AMBIENCE)
KRETEK 3000 3000
mixer 4 EL. ±0.000
+ Load Scale AREA
61 M2
4280
OFFICE MATERIAL STORAGE 2500 2500 2500
canopy line
LOAD EL. ±0.000
3000 (COOL ROOM)
WASH
EYE
MEJA
SCALE
30 M2
7 EL. ±0.000
canopy line
TANGKI 123 M2 LOADING
JACKETED
DAILY CAMPUR
AREA
TANK
TANK 2
hydrant
4260
TANGKI EL. -0.300
DAILY
TANK CAMPUR
1
6
table
DRUM STORAGE
30000
s/s bench
s/s bench
s/s bench
4400
mixer 5 GRASS
+ Load Scale WHITE KITCHEN LIQUID
canopy line PG & VG DAILY TANK EL. -0.300
EL. ±0.000 FINISHED GOOD
2549
canopy line
FILLING MACHINE
5 co co co
EL. ±0.000 LIQUID
mixer 6 collecting
+ Load Scale PROCESS NICOTINE pit
4260
ROOM
DRUM AREA
LIQUID
EMPTY DRUM
PSA WHITE
4
cap. 156 pallets DISPENSING
2500
2500
2500
2 storey co EL. ±0.000 co EL. ±0.000 co
FINISHED GOOD
4280
2500
EL. -0.300
EL. ±0.000 TOILET
canopy line
canopy line
3 TOILET
normal hot product 2500
cap. 147 pallets
2500
water water
WATER
2500
3 storey MUSHOLA
TACO
4260
co co co
SUPPLY AREA
CIP water
2 PANTRY
elect.
panel EL. -0.050 SKID
DIRTY TOTE
CIP
WASHING
elect.
CLEAN DRUM EL. ±0.000 TOTE
4143
panel
DRUM DRUM STORAGE
EL. -0.050 WTP TOTE AFTER WASHING
EL. -0.050 EL. -0.400
canopy line WASHING ROOM EL. -0.050
1
EL. ±0.000 AHU ROOM
EL. -0.050 HOT WATER CHILLER
EL. -0.050 TANK CLEAN TOTE
BATTERY AREA
EL. - 0.050
TOTE HAZARDOUS TOTE WASH CHARGING
WASTE RINSE AREA STATION
EL. - 0.050
6000 6000 6000 6000 6000 6000 6000 6000 6000 6000
60000
A B C D E F G H I J K
1939
1843
168
450 200 450 EL. +000 17182 (H-200x150x10x7) 200 - ALL LEVELS ARE IN METERS UNLESS NOTED OTHERWISE
200
A
BAT-DWG-BD-AR-01-WW-0002
PLATFORM
TOS. EL +3400 C
B BAT-DWG-BD-AR-01-WW-0004
STAIRWAY BAT-DWG-BD-AR-01-WW-0003
2000
PAVING (EXISTING)
2118
CONCRETE ACCESS WAY (NEW) EL. +000
EL. +200 CHEMICAL
3000
PLATFORM TREATMENT
TOS. EL +3400
PH
ADJUSTER
BRC FENCE
1
BRC FENCE (EXISTING)
1000
882
1 1
COARSE BUBBLE DIFFUSER
AEROCORE R-120 TYPE
(TYPICAL.7)
1000
1200
3
1"x34" 4"
(TYP.7) 1"-PIPE HEADER
8000
8000
COARSE BUBBLE DIFFUSER
1"x1"
3 AEROCORE R-120 TYPE 3
4" 1"x34" 4"
BRC FENCE
(TYPICAL.8)
(TYP.8)
1000
1"-PIPE HEADER
AGITATOR
800
MEMBRANE
MODUL 3 1"x1" 3
4" 4"
3
4"
(TYPICAL) 3
4"
1500
1"-PIPE HEADER
1"-PIPE HEADER
1 = REVISION MARK
PAVING (EXISTING)
5000
TOS. EL +3400 TOS. EL +3400
EL. +000
3000
1"-PIPE HEADER -
3 3
- - - - - -
4" 4"
D - - - - - -
1"-PIPE HEADER BAT-DWG-BD-AR-01-WW-0005
- - - - - -
3 3
4" 4"
- - - - - -
1 REVISION AT ST ST 03-01-2023
0 ISUUED FOR CONSTRUCTION AT ST ST 20-12-2022
1 1 NO. DESCRIPTION BY CHKD APVD DATE
400
200 450
200
392 200 650 2000 5000 BRC FENCE 6500 1200 1000 1482 169 213 250
200
PAVING (EXISTING) 1 APPROVED BY CLIENT
EL. +000
EXISTING DRAINAGE
2461
PIPING
WASTE WATER TREATMENT PLANT PIPING LAYOUT
WWTP_LAYOUT
SCALE 1 : 40 SCALE : 1:40 FORMAT SIZE : A1
PROJECT DRAWING NO. REV
P-21-018 BAT-DWG-DD-PR-01-WW-2201 1 -