2PCS - 20mmØ x 7.

5m TB
0.8m
0.8m 0.8m 2PCS - 20mmØ x 5.4m TB 0.8m 2PCS - 20mmØ x 2.5m TB
2PCS - 20mmØ x 5.4m TB 2PCS - 20mmØ x 5.4m TB

0.15m 0.15m
2PCS - 12mmØ x 4.42m WB 2PCS - 12mmØ x 4.5m WB 2PCS - 12mmØ x 4.5m WB 2PCS - 12mmØ x 4.5m WB 2PCS - 12mmØ x 4.25m WB

0.15m 0.15m 0.15m 0.15m 0.15m


6PCS - 20mmØ x 4.42m BB 6PCS - 20mmØ x 4.5m BB 6PCS - 20mmØ x 4.5m BB 6PCS - 20mmØ x 4.5m BB 6PCS - 20mmØ x 4.25m BB

75 75

0.075m 0.075m

400 0.365m

0.32m

400 154pcs - 10mmØ x 1.20m


BEAM RETROFFIT CROSS SECTION

RETROFFIT BEAM REBAR CUTTING LIST (GL. 5/B-G & GL. 4/B-G)
LOCATION PLAN DETAILS (BEAM RETROFFIT)
REBAR TOTAL COM QTY/COM GROSS
FLOOR STRUCTURE TYPE LENGTH QUANTITY SET SUM QTY COM QTY
DIAMETER LENGTH LENGTH LENGTH WEIGHT
4F BEAM TOP BARS 20 7.500 2 2 4 30.00 7.5 1.00 4.0000 73.9372
4F BEAM TOP BARS 20 5.400 6 2 12 64.80 6 1.00 12.0000 177.4492
4F BEAM TOP BARS 20 2.500 2 2 4 10.00 6 2.00 2.0000 29.5749
0
4F BEAM BOTTOM BARS 20 4.420 6 2 12 53.04 9 2.00 6.0000 133.0869
4F BEAM BOTTOM BARS 20 4.500 6 2 12 54.00 9 2.00 6.0000 133.0869
4F BEAM BOTTOM BARS 20 4.500 6 2 12 54.00 9 2.00 6.0000 133.0869
4F BEAM BOTTOM BARS 20 4.500 6 2 12 54.00 9 2.00 6.0000 133.0869
4F BEAM BOTTOM BARS 20 4.250 6 2 12 51.00 9 2.00 6.0000 133.0869

4F BEAM STIRRUPS 10 1.510 154 2 308 465.08 6 3.00 103.0000 380.7763


0
4F BEAM WEB BARS 12 4.420 2 2 4 17.68 9 2.00 2.0000 15.9704
4F BEAM WEB BARS 12 4.500 2 2 4 18.00 9 2.00 2.0000 15.9704
4F BEAM WEB BARS 12 4.500 2 2 4 18.00 9 2.00 2.0000 15.9704
4F BEAM WEB BARS 12 4.500 2 2 4 18.00 9 2.00 2.0000 15.9704
4F BEAM WEB BARS 12 4.250 2 2 4 17.00 9 2.00 2.0000 15.9704

1,407.02

25.4
4.233333333
PROJECT TITLE : REPAINTING OF FAÇADE FOR 4-STOREY BUILDING WITH BASEMENT
LOCATION : 1680 E.RODRIGUEZ AVE COR LOS ANGELES STREET, QUEZON CITY
DATE : January 24, 2023

SUBJECT : RETROFFIT BEAM (4TH FLOOR)

- - -
Quantity Unit Length Bar diameter Kilogram
14 Pcs- 6.00 m Dia 20 207.02
4 Pcs- 7.50 m Dia 20 73.94
30 Pcs- 9.00 m Dia 20 665.43
- Pcs- 10.50 m Dia 20 -
- Pcs- 12.00 m Dia 20 -
R60 = 946.40
- Pcs- 6.00 m Dia 16 -
- Pcs- 7.50 m Dia 16 -
- Pcs- 9.00 m Dia 16 -
- Pcs- 10.50 m Dia 16 -
- Pcs- 12.00 m Dia 16 -
R60 = -

- Pcs- 6.00 m Dia 12 -


- Pcs- 7.50 m Dia 12 -
10 Pcs- 9.00 m Dia 12 79.85
- Pcs- 10.50 m Dia 12 -
- Pcs- 12.00 m Dia 12 -
R40 = 79.85
103 Pcs- 6.00 m Dia 10 380.78
- Pcs- 7.50 m Dia 10 -
- Pcs- 9.00 m Dia 10 -
- Pcs- 10.50 m Dia 10 -
- Pcs- 12.00 m Dia 10 -
R40 = 380.78

R60 = 946.40
R40 = 460.63
TOTAL KG = 1,407.02