Project Name:

Solaire North
Location:

EDSA, Vertis North, Quezon City Philippines


Title:
METHOD STATEMENT (MS) Revision No. 0
METHOD STATEMENT FOR CABLE PULLING

METHOD STATEMENT

FOR CABLE PULLING


Project Name:
Solaire North

Location:

EDSA, Vertis North, Quezon City Philippines


Title:

METHOD STATEMENT (MS) METHOD STATEMENT FOR CABLE PULLING Revision No. 0

List of Contents

Section Title Page

1.0 PURPOSE 3 of 5

2.0 SCOPE 3 of 5

3.0 PROCEDURE 3 of 5

4.0 TOOLS/MATERIAL 4 of 5

5.0 SAFETY 4 of 5
Project Name:
Solaire North

Location:

EDSA, Vertis North, Quezon City Philippines


Title:

METHOD STATEMENT (MS) METHOD STATEMENT FOR CABLE PULLING Revision No. 0
Project Name:
Solaire North

Location:

EDSA, Vertis North, Quezon City Philippines


Title:

METHOD STATEMENT (MS) METHOD STATEMENT FOR CABLE PULLING Revision No. 0

1.0 PURPOSE

To provide guidelines for proper pulling of cable in conduits

2.0 SCOPE

 Cable pulling and installation


 Insulation resistance testing

3.0 PROCEDURES
3.1 Preparation:
 Check that all containment are completely installed from
designated equipment locations to work area and
make sure that the above containment are free from sharp

 Clean and barricade the area where the boxes of cable to


be
positioned and remove any barriers/obstruction that may
damage the cable.

3.2 Cable Pulling:


.
 Position all boxes of cable on a secured or barricaded area.
 Measure the cable according to the length needed in every
devices point.
 Put a temporary label on both ends using permanent
marker or
masking tape to identify the cable easily.
 Pull the cable according to the pulling tension standard of
25
lbs.
Project Name:
Solaire North
Location:

EDSA, Vertis North, Quezon City Philippines


Title:

METHOD STATEMENT (MS) METHOD STATEMENT FOR CABLE PULLING Revision No. 0

4.0 TOOLS/MATERIALS

Pliers

G.I. wire

Steel tape meter

Ladder
Project Name:
Solaire North
Location:

EDSA, Vertis North, Quezon City Philippines


Title:

METHOD STATEMENT (MS) METHOD STATEMENT FOR CABLE PULLING Revision No. 0

5.0 SAFETY

 Barricade the area

Wear PPE

Wear gloves

Wear safety boots

You might also like