Word Doc Estimate Sheet.
Total job time cannot exceed 5 days without, contacting homeowner Manuel. ( Special needs
for the job are as follows.
42” rail must be added to the bottom of the cabinets above the sink area. 42” in the face area,
add 2 shelves to create another cabinet box to continue with the cabinet line.
The first set of cabinets extreme right side must be replaced, suggestion of owner. *INSTALL
PRIOR TO PAINTING AFTER THE SHELVES ARE INSTALLED, LOCKING THE SHELVES IN WITH THE
FACE FRAME STILE*
EURO STYLE HINGES WILL REPLACE EXISTING HINGES. $60.00 AT LOWES 10PK.
MAPLE HARDWOOD PLYWOOD MATERIEL. $90.00 A 4X8’ SHEET. *ONE OR MORE DRAWER MAY
NEED REPAIR. INSTALL NEW GUIDES TO ENSURE LONG LASTING EASY SLIDE DRAWERS.
ON FINAL CONTRACT ADD. $25.00 PER FIX. IF IT IS NOT A SIMPLE FIX. BUILD NEW DRAWER.
$2500.00 quote, 25% down, 25% when boxes are painted. 25% due on door delivery25% due
upon installation of the last door and after job site is cleaned up .
1 gallon of primer
1 tube of fill
Nailbags, compressor, finish spray guns, hose and 10g cord .cordless saw, screw gun and Greco
sprayer/hose and 511sprsy tip.