DS1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE NO. IV-A
Canlubang Interchange Road Brgy. Mayapa, Calamba City, Laguna

Distance (m) Elevation (m) Remarks Station: 00+(-070) meters (Downstream 1)


0.0 44.92
0.5 44.41 LWE
Elevation of BM: 50.00 m.
3.5 44.19 Elevation of Zero Gage: 43.19 m.
6.5 44.06 Gage Height: 1.37 m.
9.5 43.91
11.5 43.81
14.5 43.79
17.5 43.70
20.5 43.76
23.5 43.21
26.5 43.41
29.5 43.29
32.5 43.29
35.5 44.41 RWE
36.0 45.31

Road Retaining Wall


48
Retaining Wall
47
ELEVATION (m)

46

45 LWE RWE
44

43

42

41
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

DISTANCE (m)

QUALITY ASSURANCE AND HYDROLOGIC RIVER DS1


RIVER NAME: CONDUCTED BY: DATE:
HYDROLOGY SECTION SURVEY Pansipit River Hydrology Section April 14, 2023

You might also like