SITE REPORT
DATE: (30 - 4) - (1 - 5) - 2023
CODE MASR-KAS-PA-DCR-CIV-(30 - 4) - (1 - 5) - 2023
2.2-Staff
2.2-STAFF DAY Shift NIGHT Shift TOTAL REMARKS
Project Manager 1 0 1
Site Engineer 2 0 2
Site Supervisor 1 0 1
Project Forman 1 0 1
Safety Officer 2 0 2
Safety supervisor 3 0 3
Surveyor Engineer 1 0 1
Surveyor helpers 3 0 3
Technical Engineer 1 0 1
Electrician Engineer 2 0 2
Electrician supervisor 1 0 1
Mechanical supervisor 1 0 1
Site logistic Manager 1 0 1
Purchases official 1 0 1
Store keeper 1 0 1
TOTAL 22 0 22
2.3-Main Equipments
Main Equipments DAY Shift NIGHT Shift TOTAL REMARKS
Mobile Crane 2 0 2
Welding Machine 9 0 9
Cutting Machine 10 0 10
Generator 2 0 2
Compressor 2 0 2
Cars 4 0 4
Fork lift 1 0 1
Boom Truck 1 0 1
TOTAL 31 0 31
3-Description of The Main Activities BY QTYS
SER LOCATION Excavation -MTR WELDED Pipes-MTR Installed Pipes-MTR No.WELDED of joints-ONE No. of tested joints (approved) -ONE Installed Conduit -MTR Installed Detectable - Warning TapeInstalled Litter Bin Backfill By-MTR
1 ZONE 02 664 661 661 180 180 1879 502 12 502
2 ZONE 03 314 312.24 300 64 64 925
3 ZONE 04 1025 1396.7 748 284 278 2083 981 981
4 ZONE 05 545 545 545 147 147 1208 266 3 266
BOULEVARD
5 ZONE 06 314.1503 314.1503 314.1503 77 77 1215 100 7 100
6 ZONE 07 567.3574 567.3574 567.3574 156 156 1487 300 15 300
7 ST05-BOULEVARD 282.6432 208 208 91 86 773 7
8 ST04-BOULEVARD 140.8 140.8 135 40 40 17 17 17
1 ST03-NORTH AREA 190 190 190 44 44 310 37 37
2 ST03-SOUTH AREA 143 12 12
3 STO4-NORTH AREA 113.3657 112 113.3657 25 25 250
INTERFACES AREAS
4 STO4-SOUTH AREA 112 112 112 48 48 308 34 34
5 ST05-NORTH AREA 236 236 236 58 58 472
6 ST-05-SOUTH AREA 198 198 198 66 66 208 92 92
1 Z1 130 130 130 42 42 227
2 Z2
3 Z3 - TERMINAL STATION 578 578 578 46 46
South and North Roads-
4 Z4
DIRECT BURRIED
5 Z5-SOUTH ROAD 341 341 298 70 70 699 192 192
6 Z6
7 Z7
TOTAL 5751.3166 6185.2477 5333.8734 1450 1439 12061 2521 44 2521
11-MAIN ISSUES
1 ST05 NORTH NORTH WEST NEED CORE
2 UGLS LITTER BINS EXCAVATION STILL NO ACTION
3
12-PHOTOS OF ACTIVITIES