METHOD STATEMENT
PROJECT:
PROPOSSED MODIFICATION WORKS AT MAPEI AT
DIP 1, DUBAI – UAE.
METHOD STATEMENT
SIGN-OFF
Project Manager
Name: Date:
Signature:
Signature
LOYAL BUILDING CONTRACTING L.L.C.
CONTENTS
1. PRELIMINARY NOTE
2. PURPOSE OF WORK
3. RESPONSIBILITIES
4. SAFETY REQUIREMENTS
5. PERSONAL PROTECTIVE APPAREL AND SAFETY EQUIPMENT
(PPE)METHODOLOGY
6. EQUIPMENT & MANPOWER
6.1 EQUIPMENT
6.2 MANPOWER
6.3 MATERIAL
7. SCOPE OF WORK
8. Methodology
8.1 PREPARATION WORK
8.2 EXCAVATION FOR TANK INSTALLATION
8.3 EXTENSION OF EXISTING OVERHEAD COLUMN
8.4 CONCRETE CASTING ON THE EXTENDED COLUN
8.5 WATER TANK PLACING ON THE OVERHEAD FOUNDATION
8.6 CONNECTING THE WASTERTANK TO THE EXISTING SERVICE
LINE.
9. Clear work area
10. Dismantle Aluminium scaffold
11. Rubbish arising
12. Health and Safety Management Provisions
LOYAL BUILDING CONTRACTING L.L.C.
1. PRELIMINARY NOTE:
LOYAL BIUILDING CONTRACTING LLC reserves the right to adapt the
methods used according to site needs and configuration. In the case of major
changes to the methods intended to be used, this method statement will be
resubmitted for approval. The Work shall be commenced upon approval of the
MS and RS by Client.
2. PURPOSE OF WORK:
This document defines the procedures to be used during the initial stage starting
from making for fixing the gypsum wall cladding, filling and sanding and
fixing of the 30X30 MDF on the wall.
3. SCOPE OF WORK:
The scope of work includes as follows,
4. Responsibilities:
Project Mr.Senthil – 0526404814
Manager Leads and execute timely completion of work and oversee
the safety of the site.
4. Safety Requirements:
Worker involved must be inducted by Safety officer.
Worker involved must wear complete and proper PPE requirements at all
times.
Worker involved must be MS/RA briefed and recorded.
All workers must be briefed with emergency procedure, Evacuation drill
procedure and general site rules that are followed at Mapei Site.
Material Handling.
Induction and training shall be based on this safety program and shall
include but shall not be limited to:
LOYAL BUILDING CONTRACTING L.L.C.
Persons working at height (i.e on the scaffold) shall be provided with Full
body harness system. Prior to use, make sure that the harness and the
Lanyards are Safe for use.
All persons exposed to operations which subject the eye (OR) face to dust
or flying particles shall use Safety Goggles and Face shield.
6.1EQUIPMENT:
Gypsum Filler
Stainless Steel joint knife
Kraft Tools
6.2 MANPOWER:
Engineer 1 Nos
Workers 3 Nos
6.3 MATERIALS:
7. SCOPE OF WORK:
The scope work involved in fixing of the Gypsum wall joints, Fixing on the
wall MDF access door, double skin plywood fixing on the wooden structure,
and wooden capping fixing.
LOYAL BUILDING CONTRACTING L.L.C.
As an initial step, provide safe access for the site operatives to reach to the work
area.
Obtaining the work permit from the Mapei Client representative and
ensure the work area is safe.
Tool box talk training must be given to the workers about the scope of
work and the risk that are associated with the work must be
communicated.
Job specific instruction must be given by the onsite supervisor.
Providing proper access to the work execution area.
Listed modification works shall be done by complying with the on site
safety rules..
All site rubbish that arises during the modification work shall be stored in
the black cover and at the end of each shift, the waste debris shall be
disposed in the designated area.
8 Methodology:
8.1 Preparation Work:
PPE must be worn at all times.
Aluminium Scaffold shall be provided for all the height work activities.
Ensure that the existing underground services drawing shall be
identified before the commencement of the excavation work.
All equipment shall be inspected, and all personnel shall be inducted
and trained before the commencement of work on site.
Loyal Engineer shall ensure that prior to commencing work the position
of services obstructing the work area are established, marked, agreed, and
LOYAL BUILDING CONTRACTING L.L.C.
This method of statements details the procedure for the extension of the
RCC Column as proposed by client and then Form and reinforcement
works shall take place.
When dismantling the forms works after being used all nails will
be removed.
All construction wastes will be cleared and all the materials must
be stacked orderly.
All formwork of concrete work shall be made with 18mm marine ply
wood and as per the given sizes in the drawing.
Steel reinforcement will be cut and bent as per the required diameter and
shape and it will be fixed with interconnect.
LOYAL BUILDING CONTRACTING L.L.C.
Proper cover space. Shop drawings and bar bending schedule shall be
prepared and to be approved by the consultant.
All the concrete shall be vibrated properly and finished nicely and it will
be cured by application of concrete curing compound.
Lifting plan shall be prepared and it must be available during the time of
lifting activity.
All the lifting activity shall be done under the supervision of the foreman
Barricade must be provided on the lifting activity area and signage’s must
be placed to prevent unauthorized entry.
All the lifting appliance must be certified by DDA approved certificate.
DDA approved rigger must be available during the lifting activity.
Experienced personnel will carry out all the installation work. UPVC pipe
will be installed in accordance with the client and manufacturers
instruction.
All the access to the work at height will be carried with the help of the
aluminium scaffold.
LOYAL BUILDING CONTRACTING L.L.C.
The Team will undertake safety induction /Pre job safety briefings.