Name of the Work:-Construction of Low Level Causeway at 0+900 to 1+100

Chainage 0+870 0+900 1+000 1+100 1+130


FRL 201.835 201.945 204.468 207.212 207.635
GL 200.974 200.025 199.008 206.888 207.152
PBL--- 198.067
HFL--- 199.367
RTL--- 204.468

Sand filling
LBL--- 197.71

0.3m PCC M-15 Ref. Box GAD for Details


30.0m 200.0m 30.0m
BFL--- 196.21

LONGITUDINAL SECTION OF THE CAUSEWAY

NOTE:- 74 Nos of 1200mm dia NP4 pipes & 1 No of 5 span 2.0m vent continuous RCC box culvert are proposed.But all the details could not be shown due to limitation of space

U/S D/S
7.32m
5.50m
Guide posts '0.45 0.91m

PQC 0.300
DLC 0.150
GSB 0.150 1200mm dia NP4 Pipe
3.5m Sand
Filling
(0.30m thick) Granular filling Toe wall (PCC M-15)
Protection work 0.45
as per details on G.L 2.0m 2.0m
other side
0.6m
PCC M-15 1m
0.6 0.15m
2.00m
0.15m Apron 600mm to 300mm thick

Apron--900mm thick
2.15m 2.15

CROSS SECTION OF PROPOSED CAUSEWAY


\

Jr. Engineer Sub. Dvsnl. Engineer Executive Engineer


PWD B&R PWD B&R Narnaul PWD B&R Narnaul
LONGITUDINAL SECTION OF THE BOX CULVERT

RCL-------- 204.468
Intermediate wall-0.35m thick Top slab 0.35m thick in M-25
in M-25

2.3m

Bottom of Raft--------- 197.817


Abutment---0.35m thick Raft of 0.35m thick in M-25
in M-25 over 0.15m thick PCC M-15
CROSS SECTION OF THE BOX CULVERT

7.32m

Wearing coat
Hand rails

Road
Crust

Sand Fill

Top slab

U/S D/S Toe wall


PCC--150mm thick (1:4:8) Raft slab 0.45
2.0m 2.0m

0.6m
Granular filling ----600mm thick

1.5m
Apron 600mm to
Cut-off walls 300mm thick
Apron--900mm thick

Jr. Engineer Sub. Dvsnl. Engineer Executive Engineer


PWD B&R PWD B&R Narnaul PWD B&R Narnaul