EARNED VALUE ANALYSIS
Cost Variance
SPI=EV/AC
SV=EV-PV
• If SV is + ve the project ahead the Schedule
• If SV is 0 the project is on Schedule
• If SV is - ve the project Behind the Schedule
SPI=EV/PV
• If SPI is > 1 the project ahead the Schedule
• If SPI is = 1 the project is on Schedule
• If SPI is < 1 the project Behind the Schedule
CV=EV-AC
• If CV is + ve the project cost underrun ( spend less
than we have )
• If CV is 0 the project cost on budget
• If CV is - ve the project cost overrun ( spend more
than we have)
CPI=EV/AC
• If SV is > 1 the project cost underrun
• If SV is = 1 the project cost on budget
• If SV is < 1 the project cost overrun
As per our plan after 5 days the mason completing 5 concrete block and which
cost 500/-
In actual practice completed blocks 3 and the cost for the concrete blocks will
increases to 200/- per block due to the high cost of raw material.
• Go to the status tab and set the labour units (completed items)