EARNED

VALUE
ANALYSIS
CADPOINT Engineering Solutions PVT.LTD 1
EARNED VALUE ANALYSIS

CADPOINT Engineering Solutions PVT.LTD 2


EARNED VALUE ANALSYS
TRACKING FORCASTING
STAGE STAGE
Present Future
performance performance
about cost & time about cost & time

CADPOINT Engineering Solutions PVT.LTD 3


TARCKING FORCASTING
STAGE STAGE
CADPOINT Engineering Solutions PVT.LTD 4
Planed Value Cost (PV) Scheduled Variance
Planed Value Cost is the authorized budget assigned to
scheduled work. SV=EV-PV

Cost Variance

Actual Cost(AC) CV=EV-AC


Actual Cost is the realized cost incurred for the work.

Scheduled Performance Index

Earned Value Cost (PV) SPI=EV/PV


Earned Value Cost is measured of work performed
expressed in terms of the budget authorized.
Cost Performance Index

SPI=EV/AC

CADPOINT Engineering Solutions PVT.LTD 5


Scheduled Variance

SV=EV-PV
• If SV is + ve the project ahead the Schedule
• If SV is 0 the project is on Schedule
• If SV is - ve the project Behind the Schedule

CADPOINT Engineering Solutions PVT.LTD 6


Scheduled Performance Index

SPI=EV/PV
• If SPI is > 1 the project ahead the Schedule
• If SPI is = 1 the project is on Schedule
• If SPI is < 1 the project Behind the Schedule

CADPOINT Engineering Solutions PVT.LTD 7


Cost Variance

CV=EV-AC
• If CV is + ve the project cost underrun ( spend less
than we have )
• If CV is 0 the project cost on budget
• If CV is - ve the project cost overrun ( spend more
than we have)

CADPOINT Engineering Solutions PVT.LTD 8


Cost Performance Index

CPI=EV/AC
• If SV is > 1 the project cost underrun
• If SV is = 1 the project cost on budget
• If SV is < 1 the project cost overrun

CADPOINT Engineering Solutions PVT.LTD 9


Example No : 1
For example one mason making 10
concreate block for our project in 10 days
with a cost of 100/- per day.

CADPOINT Engineering Solutions PVT.LTD 10


Example No : 1

Each day we spend 100/- and the % of


complete is 10%.
So the total budgeted cost was 1000/-

CADPOINT Engineering Solutions PVT.LTD 11


Review Day of Our Project
After 5 Days

As per our plan after 5 days the mason completing 5 concrete block and which
cost 500/-

CADPOINT Engineering Solutions PVT.LTD 12


Review Day of Our Project
After 5 Days

In actual practice completed blocks 3 and the cost for the concrete blocks will
increases to 200/- per block due to the high cost of raw material.

CADPOINT Engineering Solutions PVT.LTD 13


TARCKINGSTAGE

CADPOINT Engineering Solutions PVT.LTD 14


FORCASTING STAGE

CADPOINT Engineering Solutions PVT.LTD 15


Steps for Calculating EVA

• We just create our activity and assign resource to the activity

• The create a baseline for the project

• After creating baseline change the price of resource (override option)

• Go to the status tab and set the labour units (completed items)

• The schedule the project based on review date

• Then change the duration in status tab

• Add the required columns

CADPOINT Engineering Solutions PVT.LTD 16


CADPOINT Engineering Solutions PVT.LTD 17
CADPOINT Engineering Solutions PVT.LTD 18