Hassyan Clean Coal Power Plant

Checklist for Onshore Equipment

Date :-09-02-2023 Time:-15:00

SL.
Parameter Status Remark
No.
OK NOT OK
Discharge chute area ( Skirt rubber and
1 OK
Sealing belt)

2 Diverter Gate Position and limits status OK

3 Transfer Gate Condition OK

4 Feed belt condition OK

5 Hopper vibrator and gate condition. OK

6 Grab Condition OK

7 Grab Open/Close rope condition. OK

8 Hoist wire rope condition OK

Grab Luffing rope condition. /Luffing


9 OK
mechanism condition.

10 Switchgear room Condition OK

11 Electrical room Condition OK

12 Drive House room Condition OK

13 CCRD Cable condition OK

Shop Unloader#1 Bogy Wheel and Long travel drive


14 OK
conditions.

15 LT lubrication status OK

16 Structure Status OK

17 Cabin travel mechanism condition OK

18 Any Third party certification due or not OK All thirdparty certification are available

Check for any previous observation of coal PAC point attend by EPC. It will check during coal discharge
19
Leakage operation.

20 Check the all limit switches healthiness OK

21 Check the Lighting in your location good OK

For Conveyor Dust collector PAC point attend by EPC. It will


check during coal discharge operation.
Check the availability of Dust collector
22 PAC point still pending to provide approch platform For Hopper
system Dust collector. The performance of this Dust collector to be
check during Operation.
EPC attended all the PLC issue in the month of NOV 2022. No
23 Check for PLC any software issue load check performed and found ok. Checks With load condition
to be verified during next coal unloading operation.
EPC team commissioned Fire alarm system on both SUL. The
system was found working. One smoke detector
Check the Fire fighting equipment condition (90SGY91DU001) was not working On SUL1 Drive room.
24
if any This need to be rectified by EPC. cable laying between CJB to
control room yet to be done by EPC to integrate SUL fire alarm
system with CCR system.
Discharge Shute area ( Skirt rubber and
25 OK
Sealing belt)

26 Diverter Gate Position and limits status OK

27 Transfer Gate Condition OK

28 Feed belt condition OK

29 Hopper vibrator and gate condition. OK


SL.
Parameter Status Remark
No.
OK NOT OK

30 Grab Condition OK

31 Grab Open/Close rope condition. OK

Rope on Drum2 found damaged. The same will be replaced on


32 Hoist Wire Rope condition
14-02-2022
Grab Luffing rope condition./Luffing
33 OK
mechanism condition.

34 Switchgear room Condition OK

35 Electrical room Condition OK

36 Drive House room Condition OK

37 CCRD Cable condition OK


Shop Unloader#2
Bogy Wheel and Long travel drive
38 OK
conditions.

39 LT lubrication status OK

40 Structure Status OK

41 Cabin travel mechanism condition OK

42 Any Third party certification due or not OK All thirdparty certification are available

Check for any previous observation of coal PAC point attend by EPC. It will check during coal discharge
43
Leakage operation.
During trail run we noticed limitswitch for Discharge chute
44 Check the all-limit switches healthiness OK divertor gate found faulty. The same was rectified on 10-02-
2023 & found ok.

45 Check the Lighting in your location good OK

PAC point still pending to provide approch platform For Hopper


Check the availability of Dust collector
46 Dust collector. The performance of this Dust collector to be
system check during Operation.
EPC attended all the PLC issue in the month of NOV 2022. No
47 Check for PLC any software issue load check performed and found ok. Checks With load condition
to be verified during next coal unloading operation.
EPC team commissioned Fire alarm system on both SUL. The
Check the Firefighting equipment condition system was found working. cable laying between CJB to control
48
if any room yet to be done by EPC to integrate SUL fire alarm system
with CCR system.
Other Onshore Observations/ Findings:
* All the Interlocks interfacing between yard conveyor C0A/0B with shipunloader & DCS system at jetty CCR are verified & found Ok.

Mechanical Engineer Electrical Engineer


SHAIJU NARAYANAN PRAVEEN NEKURI

Sign Sign