Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

1 2 3 4 5 6 7 8 9 10 11 12

TRUE
PLANT
NORTH
NORTH

A
A

B
B

KEY PLAN

C C

D PIPING AND EQUIPMENT ARRANGEMENT D

CHEMICAL AREA 1
E E

F F

. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .

0 2022/06/22 ISSUED FOR CONSTRUCTION C.G. I.B. D.C. I.A.


REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH

OFFTAKER:

G G
OWNER: OWNER ENGINEER:

Jubail 3B Project Company


PROJECT TITLE:

JUBAIL 3B IWP
EPC CONTRACTOR SUBCONTRACTOR:
Cod.: SA07C2- 02 -42 - A000 - 00001- R0

TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
CHEMICAL AREA 1
COVER
SCALE: DRAWING SHEET NO. REV.:
NUMBER:

- J3B-AM-16-D-00001 01 A

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
NORTH

A
A

B
B

KEY PLAN

C C

SHEET DESCRIPTION REVISION


01 COVER 0
D
02 INDEX 0 D
03 GENERAL PLAN VIEW 0
04 CHEMICALS ARRANGEMENT 0
05 COAGULANT (FeCl3) 0
06 SULPHURIC ACID (H2SO4) 0
07 SODIUM HYPOCHLORITE (NaClO) 0
08 FLOCCULANT 0

E E

F F

. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .

0 2022/06/23 ISSUED FOR CONSTRUCTION C.G. I.B. D.C. I.A.


REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH

OFFTAKER:

G G
OWNER: OWNER ENGINEER:

Jubail 3B Project Company


PROJECT TITLE:

JUBAIL 3B IWP
EPC CONTRACTOR SUBCONTRACTOR:
Cod.: SA07C2- 02 -42 - A000 - 00001- R0

TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
CHEMICAL AREA 1
INDEX
SCALE: DRAWING SHEET NO. REV.:
NUMBER:

- J3B-AM-16-D-00001 02 0

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
NORTH

PLANT
NORTH5
5.1
8° TRUE
NORTH
A
A + 3.500 FOR Flocculant
(FGL) SEE DRAWING: 01- INTAKE
J3B-AM-16-D-00051_08 CHAMBER
FOR Sulphuric Acid H2SO4
SEE DRAWING: 3BGDN31
J3B-AM-16-D-00051_06 BB001/002/003/004
FOR Coagulant FeCl3 IBC TANKS
SEE DRAWING: &
02- ULTRADAF J3B-AM-16-D-00051_05 BB005/006/007/008
3BGDN22
BB001 PORTABLE
SULPHURIC ACID CONTAINMENT
DOSING TANK BUNDS
33400 B
B 12100 3800 6875 6088

3BGDN11 + 3.650
3BGDN13 KEY PLAN
ON HOLD AZ001 NOTES:

2458
BB002 (TOC) ON HOLD
COAGULANT STORAGE SKID
1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
TANK + 3.650 2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO
(TOC) E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
3BGDN11 3BGDN23 + 3.650 4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
BB003 (TOC) ACCESS 5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.

3500
AZ001 6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
COAGULANT STORAGE SKID INSPECTION.
TANK ON HOLD 3BGDN02 7.- CHEMICAL TRAYS SHALL BE PROVIDED FOR THOSE OVERHEAD RUNNING
C PIPELINES. C
3BGDN32 AP001
8.- PROTECTIVE COATING TO BE APPLIED. DETAILS OF THIS WILL BE INCLUDED
AZ001 DOSING PUMP IN THE ARCHITECTURAL DRAWING.
SKID 3BGDN02
AP002 REFERENCES DRAWINGS & DOCUMENTS:
DOSING PUMP

4500
16800

1.-FOR GENERAL LAYOUT SEE DWG´s: J3B-AZ-00-D-00001, J3B-AZ-00-D-00002


2.-FOR P&ID SEE DWG´s: J3B-AP-16-D-00001.
3.-FOR CIVIL DESIGN CRITERIA SEE: J3B-AZ-00-R-00001.
19450

4.-FOR ARCHITECTURAL DESIGN CRITERIA SEE: J3B-IA-00-R-00001.


5.-FOR PAINTING & COATING SPECIFICATION SEE: J3B-AM-00-T-00419.
6.-FOR INSTRUMENT REFER TO DWG´s: J3B-AI-00-D-00001.
7.-FOR OVERALL SYSTEM DESCRIPTION: J3B-AP-00-R-00002.
+ 3.650
3BGDN11
(TOC) ACCESS COAGULANT 40%
BB001

3500
8900
D COAGULANT STORAGE 3BGDN14
VAPOR PRESSURE Negligible 20ºC
D
TANK AZ002 BOILING POINT Approximately 101ºC

SKID pH <2

Specific gravity 2.90 g/cm3 at 20ºC

SLOPE
SLOPE

SLOPE
Tanks capacity 149 m3
3BGDN12
BB001 3BGDN03 Bund capacity 159 m3

5450
COAGULANT DOSING AZ004 SULPHURIC ACID 98%
TANK SKID VAPOR PRESSURE <0.00120 mmHg at 20ºC

BOILING POINT 340ºC


+ 3.650 + 3.650 ON HOLD pH 0.3 (1N Solution)
N=50.670
2650

(TOC) (TOC)
SLOPE SLOPE SLOPE Specific gravity 1.841 g/cm3 at 20ºC
E=356.900
Freezing point -1 to 3ºC

E Tanks capacity 44 m3 E
6800 Bund capacity 69 m3

ON HOLD SODIUM HYPOCHLORITE 12,5%


FOR Sodium Hypochlorite NaClO VAPOR PRESSURE 12.1 mmHg at 20ºC
SEE DRAWING:
BOILING POINT Approximately 230ºC
3BGDN01 J3B-AM-16-D-00051_07
3BGDN11
ACCESS & 3BGDN21 BB001
pH 11-14

3BGDN11 3BGDN01 Specific gravity 1.11 g/cm3 at 20ºC


3BGDN12 AP003
AP001
LOADING ZONE AP001
AP001
SODIUM
AZ001 TRANSFER PUMP LOADING PUMP HYPOCHLORITE Tanks capacity 44 m3
LOADING PUMP 3BGDN21 LOADING PUMP
SAFETY SHOWER AND BB001 STORAGE TANK Bund capacity 44 m3

EYEWASH SULPHURIC ACID FLOCCULANT 100%


STORAGE TANK 3BGDN22 VAPOR PRESSURE Negligible 20ºC
3BGDN01
AZ001
AZ001 BOILING POINT Approximately 100ºC
F 3BGDN21 SAFETY SHOWER AND
SAFETY SHOWER AND pH 5-8
F
AP002 EYEWASH
EYEWASH Specific gravity 1.06 g/cm3 at 25ºC
TRANSFER PUMP
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .

0 2022/06/23 ISSUED FOR CONSTRUCTION C.G. I.B. D.C. I.A.


REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH

OFFTAKER:

G G
21- INTAKE OWNER: OWNER ENGINEER:

ELECTRICAL Jubail 3B Project Company


BUILDING PROJECT TITLE:

JUBAIL 3B IWP
EPC CONTRACTOR SUBCONTRACTOR:
Cod.: SA07C2- 02 -42 - A000 - 00001- R0

08- SLUDGE
H TREATMENT TITLE:
H
PIPING AND EQUIPMENT ARRANGEMENT
BUILDING CHEMICAL AREA 1
GENERAL PLAN VIEW
SCALE: DRAWING SHEET NO. REV.:
NUMBER:

1:100 J3B-AM-16-D-00001 03 0

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
3BGDN01 PLANT
TRUE
NORTH
NORTH

3BGDN11 3BGDN21 BB001 3BGDN22


3BGDN01
BB001 3BGDN11 BB001 BB001 SODIUM BB001
3BGDN21 HYPOCHLORITE
COAGULANT STORAGE BB002 3BGDN12 SODIUM SULPHURIC ACID SULPHURIC ACID
BB001 STORAGE TANK
TANK COAGULANT STORAGE BB001 HYPOCHLORITE STORAGE TANK DOSING TANK
SULPHURIC ACID
TANK COAGULANT DOSING STORAGE TANK STORAGE TANK A
A TANK

3BGDN14 3BGDN11
AZ002 BB002
SKID COAGULANT STORAGE
TANK

3BGDN13
AZ001
SKID B
B

3BGDN03
KEY PLAN

6965
6100
AZ004

6000

6000
5900

5900
NOTES:
5100

5100
SKID

4665
+4.85 +4.85 +4.85 1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO
+3.90 E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3.65 3.65 3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.

1200

1200
+3.50
4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
+2.85
6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
420

420

420

150
INSPECTION.
7.- CHEMICAL TRAYS SHALL BE PROVIDED FOR THOSE OVERHEAD RUNNING
C PIPELINES. C
3BGDN22 3BGDN01 8.- PROTECTIVE COATING TO BE APPLIED. DETAILS OF THIS WILL BE INCLUDED
AZ001 3BGDN32 IN THE ARCHITECTURAL DRAWING.
AZ001
3BGDN11
3BGDN11 VIEW A SAFETY SHOWER AND SAFETY SHOWER AND 3BGDN01 VIEW B AZ001 3BGDN31
3BGDN12 AP001 3BGDN03 SKID BB001/002/003/004
AP003
Scale 1:100
EYEWASH EYEWASH AZ001 Scale 1:100
AZ001 LOADING PUMP AZ004 IBC TANKS
TRANSFER PUMP SAFETY SHOWER AND
SAFETY SHOWER AND SKID 3BGDN02 &
3BGDN21 3BGDN21 3BGDN01 EYEWASH
EYEWASH 3BGDN14 AP001 BB005/006/007/008
AP001 AP002 AP001 3BGDN01
AZ002 DOSING PUMP PORTABLE
LOADING PUMP TRANSFER PUMP LOADING PUMP AP001 REFERENCES DRAWINGS & DOCUMENTS:
SKID CONTAINMENT
LOADING PUMP BUNDS 1.-FOR GENERAL LAYOUT SEE DWG´s: J3B-AZ-00-D-00001, J3B-AZ-00-D-00002
2.-FOR P&ID SEE DWG´s: J3B-AP-16-D-00001.
3BGDN31 3.-FOR CIVIL DESIGN CRITERIA SEE: J3B-AZ-00-R-00001.
BB001/002/003/004 4.-FOR ARCHITECTURAL DESIGN CRITERIA SEE: J3B-IA-00-R-00001.
3BGDN22 IBC TANKS 5.-FOR PAINTING & COATING SPECIFICATION SEE: J3B-AM-00-T-00419.
D FOR Sulphuric Acid H2SO4 & 6.-FOR INSTRUMENT REFER TO DWG´s: J3B-AI-00-D-00001. D
BB001 7.-FOR OVERALL SYSTEM DESCRIPTION: J3B-AP-00-R-00002.
ON HOLD SEE DRAWING: BB005/006/007/008 FOR Flocculant
FOR Coagulant FeCl3 SULPHURIC ACID
3BGDN11 J3B-AM-16-D-00051_06 PORTABLE SEE DRAWING:
SEE DRAWING: 3BGDN13 DOSING TANK
BB002 CONTAINMENT J3B-AM-16-D-00051_08
J3B-AM-16-D-00051_05 AZ001
COAGULANT STORAGE BUNDS COAGULANT 40%
SKID
TANK
VAPOR PRESSURE Negligible 20ºC
2950 5100 3050 4700 2950 3300 3415 BOILING POINT Approximately 101ºC
EQUIVALENCE TABLE
pH <2 NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL
Specific gravity 2.90 g/cm3 at 20ºC PIPE SIZE DIAMETER PIPE SIZE DIAMETER PIPE SIZE DIAMETER
NPS DN NPS DN NPS DN
Tanks capacity 149 m3
+ 3.650 INCHES mm INCHES mm INCHES mm
(TOC)

2500
ON HOLD Bund capacity 159 m3
1/2" DN15 14" DN350 56" DN1400
SULPHURIC ACID 98% 3/4" DN20 16" DN400 60" DN1500
E 3BGDN11 E
VAPOR PRESSURE <0.00120 mmHg at 20ºC 1" DN25 18" DN450 64" DN1600
BB003 + 3.650
1415

BOILING POINT 340ºC


5350

COAGULANT STORAGE 1 1/4" DN32 20" DN500 68" DN1700


(TOC)
TANK 3BGDN23 pH 0.3 (1N Solution) 1 1/2" DN40 22" DN550 72" DN1800
2550 AZ001 ACCESS

3500
Specific gravity 1.841 g/cm3 at 20ºC 2" DN50 24" DN600 80" DN2000
SKID ON HOLD Freezing point -1 to 3ºC 2 1/2" DN65 26" DN650 88" DN 2200
3BGDN32 Tanks capacity 44 m3 3" DN80 28" DN700 96" DN2400
AZ001
Bund capacity 69 m3 4" DN100 32" DN800 104" DN2600
PLANT
NORTH
SKID
55 SODIUM HYPOCHLORITE 12,5% 5" DN125 36" DN900 112" DN 2800
.18 3BGDN02
° TRUE
VAPOR PRESSURE 12.1 mmHg at 20ºC
1350

NORTH AP001 6" DN150 40" DN1000 120" DN 3000


DOSING PUMP BOILING POINT Approximately 230ºC 8" DN200 44" DN1100 128" DN3200

4500
5100

pH 11-14 10" DN250 48" DN1200 134" DN3400

3300
2950 3BGDN02
Specific gravity 1.11 g/cm3 at 20ºC 12" DN300 52" DN1300 142" DN3600
F AP002
B F
2600
19450

DOSING PUMP Tanks capacity 44 m3

Bund capacity 44 m3

500
+ 3.650 FLOCCULANT 100%
1300

. . . . . . .
(TOC) VAPOR PRESSURE Negligible 20ºC
ACCESS BOILING POINT Approximately 100ºC
. . . . . . .

3500
3BGDN14 . . . . . . .
pH 5-8
AZ002 . . . . . .
.
SKID Specific gravity 1.06 g/cm3 at 25ºC
3200
5350

ON HOLD 0 2022/06/22 ISSUED FOR CONSTRUCTION C.G. I.B. D.C. I.A.

4700
SLOPE

REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH


SLOPE

SLOPE

3BGDN11

2450
2900
750

OFFTAKER:
BB001
COAGULANT STORAGE
G TANK
G
950

900
900

950
900
600

OWNER: OWNER ENGINEER:


+ 3.650

3000
3BGDN12 (TOC) + 3.650
SLOPE SLOPE SLOPE Jubail 3B Project Company
BB001 (TOC)
COAGULANT DOSING PROJECT TITLE:
TANK
FOR Sodium Hypochlorite NaClO JUBAIL 3B IWP
SEE DRAWING:
1150 2175 2175 3275 800 2915 800 J3B-AM-16-D-00051_07 EPC CONTRACTOR SUBCONTRACTOR:

33400
Cod.: SA07C2- 02 -42 - A000 - 00001- R0

3BGDN01
3BGDN11
BB001
AP003
ON HOLD
ACCESS 3BGDN01
SODIUM
3BGDN12 TRANSFER PUMP AP001 TITLE:
H AZ001
3BGDN21 LOADING PUMP HYPOCHLORITE PIPING AND EQUIPMENT ARRANGEMENT H
3BGDN11 NEUTRALIZATION AP002 STORAGE TANK
SAFETY SHOWER AND
EYEWASH AP001 PIT
3BGDN21
A TRANSFER PUMP 3BGDN22
NEUTRALIZATION
PIT
3BGDN01
AZ001
CHEMICAL AREA 1
CHEMICALS ARRANGEMENT
LOADING PUMP AZ001
BB001 3BGDN21 SAFETY SHOWER AND SCALE: DRAWING SHEET NO. REV.:
NEUTRALIZATION PIT SAFETY SHOWER AND NUMBER:
SULPHURIC ACID PLAN VIEW AP001 EYEWASH
EYEWASH 1:100 J3B-AM-16-D-00001 04 0
STORAGE TANK LOADING PUMP
Scale 1:100
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
NORTH

A
A

PLANT
NORTH5
5.1
8° TRUE
NORTH

3BGDN11
BB002
3BGDN11 COAGULANT STORAGE
BB001 TANK B
COAGULANT STORAGE
B TANK

3BGDN11
BB003
ACCESS TO
KEY PLAN
COAGULANT STORAGE
CHEMICAL BUND NOTES:
TANK
1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.

C 2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO


E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3BGDN11 3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
AP003 5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
TRANSFER PUMP 6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
12100 INSPECTION.
3BGDN12 7.- CHEMICAL TRAYS SHALL BE PROVIDED FOR THOSE OVERHEAD RUNNING
C 1300 3800 1300 3800 1300 C
2200

6100
AZ001 PIPELINES.

5600
SAFETY SHOWER AND 8.- PROTECTIVE COATING TO BE APPLIED. DETAILS OF THIS WILL BE INCLUDED

5100
+ 4.850

4600
EYEWASH IN THE ARCHITECTURAL DRAWING.
(TOC) + 3.650 3BGDN11
(TOC) BB002 +4.85
COAGULANT STORAGE
TANK

550
+4.05

1370
+3.90
+ 3.650 +3.65
2695

+3.50

420
(TOC)
REFERENCES DRAWINGS & DOCUMENTS:
3BGDN13 +2.85
1.-FOR GENERAL LAYOUT SEE DWG´s: J3B-AZ-00-D-00001, J3B-AZ-00-D-00002
AZ001 2.-FOR P&ID SEE DWG´s: J3B-AP-16-D-00001.
SKID 3.-FOR CIVIL DESIGN CRITERIA SEE: J3B-AZ-00-R-00001.
4.-FOR ARCHITECTURAL DESIGN CRITERIA SEE: J3B-IA-00-R-00001.
5.-FOR PAINTING & COATING SPECIFICATION SEE: J3B-AM-00-T-00419.
D 3BGDN11 2505 3800 1300 3800 2695 6.-FOR INSTRUMENT REFER TO DWG´s: J3B-AI-00-D-00001. D
AP001 7.-FOR OVERALL SYSTEM DESCRIPTION: J3B-AP-00-R-00002.
DRAIN PIT
3800

LOADING PUMP
3BGDN12
BB001
COAGULANT DOSING SECTION C-C
TANK Scale 1:75

EQUIVALENCE TABLE
NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL
19450

1300

3BGDN12 PIPE SIZE DIAMETER PIPE SIZE DIAMETER PIPE SIZE DIAMETER
BB001 NPS DN NPS DN NPS DN
INCHES mm INCHES mm INCHES mm
COAGULANT DOSING
TANK 1/2" DN15 14" DN350 56" DN1400
3/4" DN20 16" DN400 60" DN1500
3520

E 1" DN25 18" DN450 64" DN1600 E


3800

1 1/4" DN32 20" DN500 68" DN1700


1 1/2" DN40 22" DN550 72" DN1800
3BGDN11 3BGDN11 2" DN50 24" DN600 80" DN2000
D BB001 BB002
2 1/2" DN65 26" DN650 88" DN 2200
COAGULANT STORAGE COAGULANT STORAGE
TANK 3" DN80 28" DN700 96" DN2400
TANK
SLOPE

4" DN100 32" DN800 104" DN2600


5" DN125 36" DN900 112" DN 2800
D
2405

2425 6" DN150 40" DN1000 120" DN 3000


50

600 8" DN200 44" DN1100 128" DN3200


3BGDN13
600

10" DN250 48" DN1200 134" DN3400


3BGDN14 AZ001 12" DN300 52" DN1300 142" DN3600
F SKID F
250

AZ002
600

700 SKID
+ 3.650
2650

700

SLOPE . . . . . .
(TOC) .
. . . . . . .
1775 DRAIN PIT . . . . . . .
. . . . . . .
3900

4950 0 2022/06/22 ISSUED FOR CONSTRUCTION C.G. I.B. D.C. I.A.

5100
REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH

4600
NEUTRALIZATION PIT
+4.85
3BGDN12 C OFFTAKER:

G AZ001 3BGDN11 +4.05 +4.05


G
1100

1100
3BGDN11 SAFETY SHOWER AND AP003 +3.65
550

550
BB001 EYEWASH TRANSFER PUMP 3BGDN11 OWNER: OWNER ENGINEER:
COAGULANT STORAGE AP001
TANK LOADING PUMP Jubail 3B Project Company
PARTIAL PLAN VIEW 1300 3800 1300 3750 1350 PROJECT TITLE:
Scale 1:75
ACCESS TO 11500 JUBAIL 3B IWP
CHEMICAL BUND
EPC CONTRACTOR SUBCONTRACTOR:
3BGDN11
Cod.: SA07C2- 02 -42 - A000 - 00001- RA.0

BB002
COAGULANT STORAGE
TANK
SECTION D-D TITLE:
H Scale 1:75 PIPING AND EQUIPMENT ARRANGEMENT H
CHEMICAL AREA 1
COAGULANT (FeCl3)
SCALE: DRAWING SHEET NO. REV.:
NUMBER:

1:75 J3B-AM-16-D-00001 05 0

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
NORTH

A
A

PLANT
NORTH5
5.1
8° TRUE
NORTH 3BGDN21
B
B E BB001
SULPHURIC ACID
3BGDN22
3BGDN21 STORAGE TANK
BB001
AP002 SULPHURIC ACID
TRANSFER PUMP 3BGDN23
DOSING TANK
AZ001 KEY PLAN
ACCESS TO SKID NOTES:
CHEMICAL BUND NOTES:
1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO
E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3BGDN22
3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
AZ001 4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
SAFETY SHOWER AND 5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
+ 3.650

6780
EYEWASH 6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
(TOC) INSPECTION.

5900
7.- CHEMICAL TRAYS SHALL BE PROVIDED FOR THOSE OVERHEAD RUNNING
C 3BGDN21 PIPELINES. C

4665
6700

AP001 8.- PROTECTIVE COATING TO BE APPLIED. DETAILS OF THIS WILL BE INCLUDED

3900
LOADING PUMP +4.85
IN THE ARCHITECTURAL DRAWING.
6200
1950 2600 1650
3BGDN23 +4.05 +4.05

1370
+3.90 +3.80
AZ001 +3.65
+3.50

420
SKID
+ 4.850 +2.85
(TOC) REFERENCES DRAWINGS & DOCUMENTS:
3BGDN22
BB001 1.-FOR GENERAL LAYOUT SEE DWG´s: J3B-AZ-00-D-00001, J3B-AZ-00-D-00002
2.-FOR P&ID SEE DWG´s: J3B-AP-16-D-00001.
+ 3.650 SULPHURIC ACID
1350

3.-FOR CIVIL DESIGN CRITERIA SEE: J3B-AZ-00-R-00001.


(TOC) DOSING TANK 600 4.-FOR ARCHITECTURAL DESIGN CRITERIA SEE: J3B-IA-00-R-00001.
900
5.-FOR PAINTING & COATING SPECIFICATION SEE: J3B-AM-00-T-00419.
D 1350 3200 1300 2600 1350 2095 2300 D
NEUTRALIZATION PIT 6.-FOR INSTRUMENT REFER TO DWG´s: J3B-AI-00-D-00001.
3BGDN22 7.-FOR OVERALL SYSTEM DESCRIPTION: J3B-AP-00-R-00002.
AT001
DRAIN PIT
SILICAGEL FILTER SECTION E-E 3BGDN22
2600

3BGDN21
AT001
19465

Scale 1:75
AT001
SILICAGEL FILTER
SILICAGEL FILTER
605

3BGDN21
BB001 EQUIVALENCE TABLE
1300

1650 3200 1350 SULPHURIC ACID NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL
STORAGE TANK PIPE SIZE DIAMETER PIPE SIZE DIAMETER PIPE SIZE DIAMETER
NPS DN NPS DN NPS DN
DRAIN PIT
INCHES mm INCHES mm INCHES mm
1/2" DN15 14" DN350 56" DN1400
3BGDN21
3/4" DN20 16" DN400 60" DN1500
AT001
E SILICAGEL FILTER 1" DN25 18" DN450 64" DN1600 E
2875 1 1/4" DN32 20" DN500 68" DN1700
SLOPE
4550

3BGDN21 1 1/2" DN40 22" DN550 72" DN1800


905

AP002 3BGDN21 2" DN50 24" DN600 80" DN2000


TRANSFER PUMP BB001
2 1/2" DN65 26" DN650 88" DN 2200
600 SULPHURIC ACID
50

STORAGE TANK 3" DN80 28" DN700 96" DN2400


600

4" DN100 32" DN800 104" DN2600


5" DN125 36" DN900 112" DN 2800
F F
600

6" DN150 40" DN1000 120" DN 3000


700
245

8" DN200 44" DN1100 128" DN3200


SLOPE
700

10" DN250 48" DN1200 134" DN3400

+ 3.650 12" DN300 52" DN1300 142" DN3600


F (TOC) 3BGDN22 F
2225 1200
AZ001
SAFETY SHOWER AND
EYEWASH . . . . . .
.
. . . . . .

5900
.
. . . . . . .

E 0
. . .
2022/06/22 ISSUED FOR CONSTRUCTION
.

C.G.
.

I.B. D.C.
. .

I.A.
3BGDN21 +4.85
AP001 ACCESS TO REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH
NEUTRALIZATION PIT
LOADING PUMP CHEMICAL BUND +4.05
1200

1100

3.65
+3.50 OFFTAKER:

G G
PARTIAL PLAN VIEW OWNER: OWNER ENGINEER:
Scale 1:75
3BGDN21 Jubail 3B Project Company
1650 3200 1100 AT001 PROJECT TITLE:
SILICAGEL FILTER
JUBAIL 3B IWP
SECTION F-F EPC CONTRACTOR SUBCONTRACTOR:

Scale 1:75
Cod.: SA07C2- 02 -42 - A000 - 00001- R0

TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
CHEMICAL AREA 1
SULPHURIC ACID (H2SO4)
SCALE: DRAWING SHEET NO. REV.:
NUMBER:

1:75 J3B-AM-16-D-00001 06 0

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
NORTH

3BGDN01
BB001
SODIUM
HYPOCHLORITE
STORAGE TANK A
A

PLANT
NORTH5
5.1
8° TRUE
NORTH
3BGDN01
BB001
SODIUM
HYPOCHLORITE
STORAGE TANK DRAIN PIT

ACCESS TO B
CHEMICAL BUND
B
3BGDN02
6810 4200 AP001
DOSING PUMP 3BGDN02
1850
3BGDN01
3BGDN03
AZ004 AP001 KEY PLAN

6000
+ 3.650 AZ001 SKID DOSING PUMP NOTES:
700 (TOC)

5375
SAFETY SHOWER AND 1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
EYEWASH 2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO

4700
E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
3BGDN01

600

650
4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
AP001 5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
+ 3.650 +4.85
LOADING PUMP

2200
6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR

450 500
(TOC) 600 INSPECTION.
2350

7.- CHEMICAL TRAYS SHALL BE PROVIDED FOR THOSE OVERHEAD RUNNING


C +4.050 PIPELINES. C
+3.90 8.- PROTECTIVE COATING TO BE APPLIED. DETAILS OF THIS WILL BE INCLUDED
+3.80 +3.80
+3.65 IN THE ARCHITECTURAL DRAWING.
1000 3800 1400 +3.50
3BGDN02

465
AP002
DOSING PUMP +2.85
3BGDN32
AZ001
SKID REFERENCES DRAWINGS & DOCUMENTS:
3BGDN03
AZ004 1.-FOR GENERAL LAYOUT SEE DWG´s: J3B-AZ-00-D-00001, J3B-AZ-00-D-00002
SKID 2.-FOR P&ID SEE DWG´s: J3B-AP-16-D-00001.
H
8900

3800

3.-FOR CIVIL DESIGN CRITERIA SEE: J3B-AZ-00-R-00001.


+ 3.650 DRAIN PIT 4.-FOR ARCHITECTURAL DESIGN CRITERIA SEE: J3B-IA-00-R-00001.
(TOC) NEUTRALIZATION PIT DRAIN PIT VIEW G 5.-FOR PAINTING & COATING SPECIFICATION SEE: J3B-AM-00-T-00419.
D Scale 1:50 6.-FOR INSTRUMENT REFER TO DWG´s: J3B-AI-00-D-00001. D
G 7.-FOR OVERALL SYSTEM DESCRIPTION: J3B-AP-00-R-00002.
SLOPE

EQUIVALENCE TABLE
NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL
H PIPE SIZE DIAMETER PIPE SIZE DIAMETER PIPE SIZE DIAMETER
2150

2735

600 DRAIN PIT + 4.850 NPS DN NPS DN NPS DN


(TOC) INCHES mm INCHES mm INCHES mm
1/2" DN15 14" DN350 56" DN1400
600

3BGDN01 3/4" DN20 16" DN400 60" DN1500


E BB001 1" DN25 18" DN450 64" DN1600 E
SODIUM 1 1/4" DN32 20" DN500 68" DN1700
550
600

HYPOCHLORITE 1 1/2" DN40 22" DN550 72" DN1800


700 STORAGE TANK
2" DN50 24" DN600 80" DN2000
2 1/2" DN65 26" DN650 88" DN 2200
2750
2650

700

SLOPE 3" DN80 28" DN700 96" DN2400


4" DN100 32" DN800 104" DN2600
2175 800 5" DN125 36" DN900 112" DN 2800
6" DN150 40" DN1000 120" DN 3000
8" DN200 44" DN1100 128" DN3200
10" DN250 48" DN1200 134" DN3400
12" DN300 52" DN1300 142" DN3600
F F
3BGDN01
NEUTRALIZATION PIT AZ001
ACCESS TO SAFETY SHOWER AND . . . . . . .
CHEMICAL BUND EYEWASH . . . . . .
.
3BGDN01 . . . . . . .
AP001 3BGDN03 . . . . . .
.
LOADING PUMP AZ004
0 2022/06/22 ISSUED FOR CONSTRUCTION C.G. I.B. D.C. I.A.
SKID
6000

REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH

PARTIAL PLAN VIEW OFFTAKER:

Scale 1:50
G G
+4.85
OWNER: OWNER ENGINEER:
+4.450
Jubail 3B Project Company
1500

+4.050
PROJECT TITLE:
+3.65
+3.50
JUBAIL 3B IWP
EPC CONTRACTOR SUBCONTRACTOR:
Cod.: SA07C2- 02 -42 - A000 - 00001- R0

TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
1005 3800 1400 1450
CHEMICAL AREA 1
DRAIN PIT SODIUM HYPOCHLORITE (NaClO)
SECTION H-H SCALE: DRAWING SHEET NO. REV.:
NUMBER:
Scale 1:50
1:50 J3B-AM-16-D-00001 07 0

1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
TRUE
PLANT
NORTH
NORTH

PLANT A
NORTH5
A 5.1
8° TRUE
NORTH
I J

3BGDN31 3BGDN31
BB006 BB007
PORTABLE 3BGDN31
PORTABLE
CONTAINMENT BUND BB004
CONTAINMENT BUND
IBC TANK
3BGDN31
3BGDN31 B
B BB002
BB003 3BGDN31
IBC TANK
IBC TANK BB008
PORTABLE
3BGDN31 CONTAINMENT BUND
BB001
IBC TANK
KEY PLAN
+ 3.650 NOTES:
(TOC) 1.- PLANT LEVEL ±0.000 m CORRESPONS TO ABSOLUTE LEVEL OF +0.0000 m DMD.
3BGDN31 2.- E=0.000 m N=0.000 m LOCAL COORDINATES CENTER CORRESPOND TO
E=381771.584 m N=2973976.379 m IN UTM/WGS 84 - ZONE 39.
BB005 3.- DIMENSIONS ARE IN MILIMETERS, UNLESS OTHERWISE NOTES.
PORTABLE 4.- LEVELS AND COORDINATES ARE IN METERS. UNLESS OTHERWISE NOTED.
CONTAINMENT BUND 5.- VALVES ON THE UNDERGROUND MAIN SHALL BE LOCATED IN VALVE PITS.
6.- VALVE PITS SHALL BE OF ADEQUATE SIZE AND READILY ACCESSIBLE FOR
INSPECTION.
7.- CHEMICAL TRAYS SHALL BE PROVIDED FOR THOSE OVERHEAD RUNNING
C PIPELINES. C
8.- PROTECTIVE COATING TO BE APPLIED. DETAILS OF THIS WILL BE INCLUDED
1430 1430 1430 2790 IN THE ARCHITECTURAL DRAWING.

2615
1580

REFERENCES DRAWINGS & DOCUMENTS:


1.-FOR GENERAL LAYOUT SEE DWG´s: J3B-AZ-00-D-00001, J3B-AZ-00-D-00002
2.-FOR P&ID SEE DWG´s: J3B-AP-16-D-00001.
3.-FOR CIVIL DESIGN CRITERIA SEE: J3B-AZ-00-R-00001.
4.-FOR ARCHITECTURAL DESIGN CRITERIA SEE: J3B-IA-00-R-00001.

D J 5.-FOR PAINTING & COATING SPECIFICATION SEE: J3B-AM-00-T-00419.


6.-FOR INSTRUMENT REFER TO DWG´s: J3B-AI-00-D-00001. D
3BGDN32 7.-FOR OVERALL SYSTEM DESCRIPTION: J3B-AP-00-R-00002.
AZ001
SKID

PARTIAL PLAN VIEW


Scale 1:50

EQUIVALENCE TABLE
NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL NOMINAL
PIPE SIZE DIAMETER PIPE SIZE DIAMETER PIPE SIZE DIAMETER
NPS DN NPS DN NPS DN
INCHES mm INCHES mm INCHES mm
1/2" DN15 14" DN350 56" DN1400
3/4" DN20 16" DN400 60" DN1500
E 1" DN25 18" DN450 64" DN1600 E
3BGDN31 1 1/4" DN32 20" DN500 68" DN1700
BB002 1 1/2" DN40 22" DN550 72" DN1800
3BGDN31 IBC TANK 2" DN50 24" DN600 80" DN2000
BB003 2 1/2" DN65 26" DN650 88" DN 2200
IBC TANK 3BGDN31 3" DN80 28" DN700 96" DN2400
3BGDN31 BB001
4" DN100 32" DN800 104" DN2600
BB004 IBC TANK
5" DN125 36" DN900 112" DN 2800
IBC TANK
3BGDN31 6" DN150 40" DN1000 120" DN 3000
BB004 8" DN200 44" DN1100 128" DN3200
IBC TANK 10" DN250 48" DN1200 134" DN3400
3BGDN32
AZ001 12" DN300 52" DN1300 142" DN3600
F SKID
F

+4.85 . . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .

+3.65 0 2022/06/22 ISSUED FOR CONSTRUCTION C.G. I.B. D.C. I.A.


REV DATE REVISIONS DESCRIPTIONS DWN CHKD APVD AUTH
+3.80
3.65
+3.50
OFFTAKER:

G G
OWNER: OWNER ENGINEER:

1200 1415 755 2300 Jubail 3B Project Company


3BGDN31 3BGDN31
BB008 BB005
PORTABLE
VIEW I-I PORTABLE
PROJECT TITLE:

CONTAINMENT BUND
Scale 1:50
CONTAINMENT BUND
3BGDN31 JUBAIL 3B IWP
BB008
3BGDN31 PORTABLE
BB006 CONTAINMENT BUND
SECTION J-J EPC CONTRACTOR SUBCONTRACTOR:

3BGDN31 Scale 1:50


Cod.: SA07C2- 02 -42 - A000 - 00001- R0

PORTABLE
BB007
CONTAINMENT BUND
PORTABLE
CONTAINMENT BUND TITLE:
H PIPING AND EQUIPMENT ARRANGEMENT H
CHEMICAL AREA 1
FLOCCULANT
SCALE: DRAWING SHEET NO. REV.:
NUMBER:

1:50 J3B-AM-16-D-00001 08 0

1 2 3 4 5 6 7 8 9 10 11 12