Eqpt no. B10-E-5003
Title Pass Partition Thickness Calculation
t0 = t1 x [1 + ( d0 / 4R) ]
Sleeve 185
PP plate 594
PP Cover 249
Fasteners 1120
Total 9090
Page No: 166
W.O.
Eqpt no.
Title Slot Hole Length Calculation
OK
Page No. 272
W.O. 21-005
Eqpt no. 411-E-102
Shell Side
1 Dish end 138 138 1.00
2 Main Shell/Barrel shell 138 138 1.00
3 Shell flange 138 138 1.00
2.6 2.70
4 Nozzle neck 118 118 1.00
Tube Side
1 Channel cover 138 138 1.00
2 Channel shell 138 138 1.00
3 Channel flange 138 138 1.00
2.65 2.88
4 Nozzle Neck 138 138 1.00
5 Tubes 92.4 92.4 1.00
6 Tubesheet 138 138 1.00
Lowest Stress Ratio (LSR) 1.00
Field Hydro test pressure(MPa) = 1.3 x MAWP x LSR 3.445
Shop Hydro test pressure(MPa) = 1.3 x MAP - Static head 3.738
Hydrostatic head (MPa) = ρ x g x h = 0.0059
Shop Hydro test pressure( in Kgf/cm2) 38.118
Final Hydro test pressure(Kg/cm2) at shop 35.00