Design Data
Design Data
1 in 25.4 mm . . . Appendix GG
1 m = 1000 mm . . . Appendix GG
1 ft = 0.3048 m . . . Appendix GG
= 0.3048 x 1000 mm
= 304.8 mm
1 cm = 10 mm
MAWP. ( INTERNAL ) : 26.00 kg/cm² g 2.55 MPa 27.00 kg/cm² g 2.65 MPa
MAX. ALL. WORKING PRESS. ( EXTERNAL ) : 0.52 kg/cm² g 0.05 MPa 0.52 kg/cm² g 0.05 MPa
GOV. ELEMENT FOR MAP ( INTERNAL ): Shell Flange Right Channel Flange Left
HYDRO TEST PRESS. AT SHOP (At Top) : 35.69 kg/cm² g 3.50 MPa 37.19 kg/cm² g 3.65 MPa
MAX. HYDRO TEST PRESS. AT SHOP (At Top) : 37.00 kg/cm² g 3.63 MPa 216.00 kg/cm² g 21.18 MPa
Position: Horizontal
HYDRO TEST PRESS. AT SITE (At Top) : 30.59 kg/cm² g 3.00 MPa 203.94 kg/cm² g 20.00 MPa
Position: Horizontal
MINIMUM HYDROTEST TEMPERATURE > 17 / < 40 ⁰C > 17 / < 40 ⁰C
APPLIES
YES NO ITEM
INTERNAL PRESSURE
EXTERNAL PRESSURE
WIND REACTIONS
SNOW REACTIONS
SEISMIC REACTIONS
TEMPERATURE GRADIENT
TEST PRESSURE AND COINCIDENT STATIC HEAD ACTING DURING THE TEST (SEE UG-99)
Check for service requirement (As per UW-2)
Shell side
(a) Does the vessel contain lethal fluid No
(b) Does the vessel operate below certain temperature designated by UCS-68, UHA-51(d)1 & UHA-51(e) No
(c) Is the vessel unfired steam boiler with design pressure exceeding 50 ksi No
Since answer to points (a) to (d) are 'No', there are NO additional requirements on account of service restrictions.
Tube side
(a) Does the vessel contain lethal fluid No
(b) Does the vessel operate below certain temperature designated by UCS-68, UHA-51(d)1 & UHA-51(e) No
(c) Is the vessel unfired steam boiler with design pressure exceeding 50 ksi No
Since answer to points (a) to (d) are 'No', there are NO additional requirements on account of service restrictions.
Check for Post Weld Heat Treatment Requirement
Shell side
Material Classification P. No. 1
G. No. 1, 2
Post Weld Heat Treatment is required when any of the following condition exists:
Applicable Applicable /
Sr. No. Description Remark
clause Not Applicable
1 UW-2(a) Lethal service Not Applicable
2 UW-2(b) Operate below certain temperatures designated by Part UCS Not Applicable
Unfired Steam Boiler with Design Pressure
3 UW-2(c) Not Applicable
exceeding 50 psi (343 kPa)
Postweld heat treatment is mandatory if welded joints over 38 mm nominal Refer below component
4 UCS-56-1 Not Applicable
thickness thickness.
Post weld heat treatment is not required As per CODE
Proposed PWHT on Shell Side - NO
Following are the thickness of the components:
Dishend (Nominal thickness) = 16 mm
Main shell = 14 mm
Cover shell = 14 mm
S1, S2 Nozzle on Main shell = 10.97 mm (Thinner of nozzle neck and shell)
V, D Nozzle on cover shell = 10.97 mm (Thinner of nozzle neck and shell)
Maximum thickness = 16 mm < 38 mm
Tube side
Material Classification P. No. 1
G. No. 1, 2
Post Weld Heat Treatment is required when any of the following condition exists:
Applicable Applicable /
Sr. No. Description Remark
clause Not Applicable
1 UW-2(a) Lethal service Not Applicable
2 UW-2(b) Operate below certain temperatures designated by Part UCS Not Applicable
Unfired Steam Boiler with Design Pressure
3 UW-2(c) Not Applicable
exceeding 50 psi (343 kPa)
Postweld heat treatment is mandatory if welded joints over 38 mm nominal Refer below component
4 UCS-56-1 Not Applicable
thickness thickness.
Post weld heat treatment is not required As per CODE
Proposed PWHT on Tube Side - NO
Following are the thickness of the components:
Channel = 14 mm
T1, T2 Nozzle on Channel = 11.13 mm (Thinner of nozzle neck and channel)
Maximum thickness = 14 mm < 38
Check for Radiography Requirement (As per UW-11 , UCS 57)
Shell side
Material Classification P. No. 1
G. No. 1, 2
Since the fluid handled is non-lethal, the reference thickness above which full radiography is mandatory is calculated as below :
so tref = 32.0 mm
= 14.00 mm
Since t < tref
Full radiography is not mandatary as per Code
Tube side
Material Classification P. No. 1
G. No. 1, 2
Since the fluid handled is non-lethal, the reference thickness above which full radiography is mandatory is calculated as below :
so tref = 32.0 mm
= 14.00 mm
Since t < tref
Full radiography is not mandatary as per Code
εf % Allow. Strain
Component Mark No. ID R tnom Rf r Ro Remarks
Strain %
900 - 16 458 - ∞ 1.750 5 PFHT Not
Cylinderical Shell Shell
50*t/Rf*(1-Rf/Ro) εf = 50*16/458*(1-458/∞) Required
157 - 10.97 83.985 - ∞ 6.530 5 PFHT
Cylinderical Shell S1, S2 Neck
50*t/Rf*(1-Rf/Ro) εf = 50*10.97/83.985*(1-83.985/∞) Required
900 - 16 458 - ∞ 1.750 5 PFHT Not
Cylinderical Shell Channel
50*t/Rf*(1-Rf/Ro) εf = 50*16/458*(1-458/∞) Required
1006 - 16 179.02 - ∞ 6.703 5 PFHT
2:1 Dished Head Dishend
75*t/Rf*(1-Rf/Ro) εf = 75*16/179.02*(1-179.02/-) Required
Nomenclature
εf = Calculated forming strain or extreme fiber elongation
R = Nominal bending radius to centerline of pipe or tube
r = Nominal outside radius of pipe or tube
ID = Inside diameter of cylinderical shell / head
Rf = Mean radius after forming
Ro = Original mean radius
tnom = Nominal thickness of the plate before forming
PFHT = Post forming heat treatment
Since the fiber elongation is almost 5% but less than post forming
heat treatment requirement to be further verified as per UCS-79 (d)
clauses a to e
UCS-79 d (2-a) --> Equipment is not in lethal service hence heat treatment is exempted
UCS-79 d (2-b) -->Impact testing is neither required by ASME Sec. VIII Div 1 nor the Material specification Sec. II Part A, hence heat treatment is exempted
UCS-79 d (2-c) --> Thickness of Head is 14 mm which is less than 16 mm. Hence Heat treatment is not required after forming.
UCS-79 d (2-d) --> Since the reduction in head thickness is more than 10%, post forming heat treatment is mandatory
UCS-79 d (2-e) --> Since the temperature of the material during forming is less than 480°C hence post forming heat treatment is mandatory.
As evident from the above, post forming heat treatment is mandatory for dishend as per para UCS-79 d (2-d & e).
Check for Impact Test Requirement
Ellipsoidal dishend
Outside diameter Do = 1022 mm
Provided thickness minus corrosion allowance t = 13 mm
Do / t = 78.62
L / Do = 0.5
Channel
Outside diameter Do = 928 mm
Provided thickness minus corrosion allowance t = 11 mm
Design length L = 645 mm
Do / t = 84.36
L / Do = 0.70
Nozzle mark S3 & D is located at the lowest portion of the shell side which can be used for draining purpose as per clause UG-25(f) of
ASME Sec. VIII Div.1.
Nozzle mark T1 is located at the lowest portion of the channel side which can be used for draining purpose as per clause UG-25(f) of
ASME Sec. VIII Div.1.
The installation of pressure relief devices is not in M/s TEMA's scope. The same shall be done by the user at site.
Title Pulling Eye Bolt Thread calculation