Professional Documents
Culture Documents
Bfji Summary
Bfji Summary
Bfji Summary
: FOCUS (K)-F16
ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (BEPCC) FOR
ED/REV.NO.: 1/00
INSTALLATION OF FLOW CONTROL VALVE SYSTEM AT PLENTONG 2 DATE EFF. : 29.12.2022
PAGE NO : 1 of 1
BOLT FLANGE JOINT INTEGRITY SUMMARY
CLIENT NAME RH
: DATE :
CONTRACTOR AD
SH REPORT NO :
LOCATION OP DISCIPLINE :
Material VISUAL
ISO DRAWING NO/ Flange Joint
No SHEET Remark
LINE NO No. Material Size Type
SCH Rating Flange Type Joint Assembly Date Report No. JIT Tag no.
Spec. (INCH) Lubricant
NA(ASIA PROPEL MECHANICAL AND PIPING INSPECTOR) PD&T JOINT INSPECTOR PD&T JOINT VERIFIER
ME
DA : MOHD DANIAL BIN OMAR NAME : MOHD SAFFRIRIZAL B ABDUL HALIM NAME : M HAFIZ AZMEE
TE : DATE : DATE :