Professional Documents
Culture Documents
Naukri AyyappanS (6y 0m)
Naukri AyyappanS (6y 0m)
EMAIL: ayyappanbala02@gmail.com
OBJECTIVE
To work in high engineering & skilled environment with positive attitude, seeking assignments in Project management / Networking /
Telecom with an organization of repute in the Telecom sector, to hold a position of responsibility in an organization with an opportunity of
growth of the organization
PROFILE SYNOPSIS
Telecom professional having 6 Years of experience in the field of RF Optimization, Integration L3 Msg Analysis & Web Development.
Good knowledge of Optimization & Integration LTE network by Monitoring KPI’s like Accessibility, Retainability, Mobility & Site
Integration.
Preparing XML for sector addition and deletion for TDD & FDD Greenfield sites and swap sites.
Parameter audit for Both 3G & 4G with using RADAR Tool Check with MO wise and Neighbor Parameter audit and optimize that
parameter as per customer point.
Neighbor addition and deletion and with detailed Dump and need to any modification create XML Plan for any ADD or DLT,
Create an XML Plan for Parameter Audit discrepancies and execute with NetAct tool Pre and Post Activation also clear the discrepancy
until receive post dump
PROFESSIONAL EXPERIENCE
Orcapod Consultants Pvt Ltd, Ericsson (MBNL 3UK)
UST Global Tech, Chennai
Indosat Indonesia & H3I Indonesia, Nokia, Chennai (2021 to Till Date)
Altran Tech Pvt India Ltd,
DTAC Thailand, Nokia, Chennai,
T Mobile, Nokia, Chennai,
U-Mobile Malaysia, Nokia, Chennai
GDC Sprint LTE, Chennai, India USA Project-Aricent Tech Pvt Ltd, Client Nokia
Vodafone 4G Huawei Telecommunications, Chennai, India, KPI Monitoring RF Engineer
TECHNICAL DETAILS
Technologies 5G,4G
Other skills MS Office, Excel Expert, Keyboard Typing skill
Tools & Utilities SAMSUNG TOOLS-LSMR, Actix Server, Site Forge,
ACADEMIC QUALIFICATION
B.E Electronics & Communication Engineering at M.I.E.T Engineering college Trichy in 2014 with 6.9/10 CGPA
PROJECT DETAILS
Project#1:
Client NOKIA
Role NPO specialist
Duration 2021 to Till Date
Team Size 15
Technologies 4G
Project Description:
LTE Sites giving Parameter Audit, NBR Audit, NBR creation and deletion with Post check.
Responsibilities:
Acceptance Report Preparation and Analysis for Cluster level and Optimization, recommendation
TA Analysis if site came Overshoot or undershoot given tilt recommendations
KPI analysis for counter level which is more degradation
Parameter audit for network level with RADAR tool
golden parameter audit and golden parameter audit If any discrepancy found create xml plan and execute with netact tool pre
activation
After received post dump check and revert national region team
NBR audit, NBR creation and deletion
post dump check and create a error plan
Project#2:
Project Description:
LTE Sites giving Parameter Audit, NBR Audit, NBR creation and deletion with Post check.
Project#3:
Client NOKIA
Role NPO specialist
Duration 2018
Team Size 15
Technologies 4G
Project Description:
Optimization of BBU Swap ALU to Nokia LTE sites with Pre and Post checks.
Responsibilities:
Responsible for KPI improvement in 4G for Major KPI’s CS/PS-Drops, RRC Signaling, CS/PS, Soft/Hard HO & IRAT KPI’s.
4G OSS KPI Post Optimization and Monitoring and Counter wise analysis, Parameter auditing
HOSR Analysis and resolution given, Handovers KPI checking Preparations and Execution fails for major Degradation for S1 and X2,
inter_intra KPI counter wise analysis
OSS KPI Counter wise analysis and parameter audit post optimization for Worst cell analysis and MO wise parameter audit to clear the
issue with counter wise analysis for all KPI’s
First Cut Migration Report Day Report post verification,48 hours report Then Find Any RET Mismatch Found and Clear the Issue
CFR and CDR Pegging, RRC Attempts and fails need to check which KPI pegging and any PRB Utilization and throughput tonnage
degradation for post optimization KPI improvement
Project#5:
Responsibilities:
Cluster drive analysis for RF Condition issue with help of Nemo tool and VIP customer complaint
Handling on Customer complaints resolving on time.
L3 Message analysis for cluster wise like SIB1,2,3,4,5 Messages, MIB, Error finding,
With respective failures VOLTE MOS, MTC, Application THPT (DL & UL) PDCP for 5G, RSRP,RSRQ,RS SNR,CQI clear the issue and
if there is any issue with respective sites will optimize physically Like Tilt changes and Power changer and OSS KPI also we are looking
and analysis the sites .
If site having VOLTE MOS or MTC issue means will check the customer latched mother site and Call fails or call drops need to check
respective sites or Application THPT issue or RF issue 5G am checking and given recommendations as per customer and client strategy.
PERSONAL DETAILS
Gender Male
DOB 11-Jul-1993
Languages English, Tamil
Marital Status Unmarried
Nationality Indian
Passport Number S7506111
Address 2/35 Middle street
Sengalipuram
Kodavasal
Thiruvarur District
612604