Check List
Check List
Check List
2
Ensure drawings used for installation are latest and approved.
3 Verify the pumps and accessories ,flow and head are as per
approved submittals.
8 Check the control panel are installed as per the approved shop
drawing.
9
Check all the cabling and wiring are completed and terminated.
REMARKS:
TESTED BY WITNESSED BY APPROVED BY
MEP CONTRACTOR ( AIRTECHNIC ) MAIN CONTRACTOR ( ARABTECH ) CONSULTANT ( ECG )
Name : Name : Name :
Designation : Designation : Designation :