PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of Septic Tank for Albatross villa/ Lancelot Villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Design flow rate 200 L/capita/day Design flow rate = (200 /1000) *8 1.6m3/day
2 No. of personnel 8 Volume of septic tank = 1.6 * 2 3.2m3
3 Liquid retention time 2 days Volume of sludge in 3 years = (30/100) * 3.2 0.96m3
4 Liquid depth 1.2 m Volume of tank = 3.2+0.96 4.16m3
5 Free board 0.5 m Surface area = Total volume / Liquid depth = 4.16 / 1.2 3.47m2
Cleaning frequency Width = 1.07m
2 2
6 ( every 3 years) 1 Surface area = 3 W , 3.47= 3 W , L = 3W Length = 3.22m
30% of total vol of
7 Volume of sludge deposited tank Height of septic tank = 1.2 + 0.5 1.7m
8 Ratio of Length (L) : Width (W) 3:1 Total volume of septic tank = 3.22 m* 1.1m *1.7m 6m3
Design of septic tank
1. Dimension of septic tank: 3.5m x 1.5m x 1.7m
2. Minimum no. of compartments = 3
3. Minimum diameter of vent pipe = 75mm
4. To provide a water seal system
References
1. Ministry of Housingn and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd
PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of leaching field for albatross villa/ Lancelot villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Average percolation rate 335.5 mm/hr Total flow rate =1.6m3/day 1600L/day
2 2
2 Infiltration rate 50 L/m /day Surface area = (1600 L/day) / (50 L/m /day) 32
3 Let Width of one trench 0.6 m Surface area = Length x width
Distance between
4 consecutive pipeline 1.5 m Length = (32/0.6) 53.3m
No. of trenches 6 Length of 1 trench = 53.3/6 8.9m
Width = (6 x 0.6) + ((1.5-0.6) *5)) 8.1m
Total surface area = 8.1 x 8.9 72 m2
PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of Septic Tank for Eagle villa / Merlin villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Design flow rate 200 L/capita/day Design flow rate = (200 /1000) *6 1.2m3/day
2 No. of personnel 6 Volume of septic tank = 1.2 *2 2.4m3
3 Liquid retention time 2 days Volume of sludge in 3 years = (30/100) * 2.4 0.72m3
4 Liquid depth 1.2 m Volume of tank = 0.72+2.4 3.12m3
5 Free board 0.5 m Surface area = Total volume / Liquid depth = 3.12 / 1.2 2.6m2
Cleaning frequency Width = 0.9m
6 ( every 3 years) 1 Surface area = 3 W2, 2.6= 3 W2 , L = 3W Length = 2.8m
30% of total vol of
7 Volume of sludge deposited tank Height of septic tank = 1.2 + 0.5 1.7m
8 Ratio of Length (L) : Width (W) 3:1 Total volume of septic tank = 2.8 m* 0.9m *1.7m 4.2m3
Design of septic tank
Dimension of septic tank: 3m x 1m x 1.7m
Minimum no. of compartments = 3
Minimum diameter of vent pipe = 75mm
Proposed volume of septic tank = 5.1m3
References
1. Ministry of Housingn and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd
PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of leaching field for Eagle villa/ Merlin villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Average percolation rate 335.5 mm/hr Total flow rate =1.2m3/day 1200L/day
2 2
2 Infiltration rate 50 L/m /day Surface area = (1200 L/day) / (50 L/m /day) 24
3 Let Width of one trench 0.6 m Surface area = Length x width
Distance between
4 consecutive pipeline 1.5 m Length = (24/0.6) 40m
No. of trenches 5 Length of 1 trench = 40/5 8m
Width = (5x 0.6) + ((1.5-0.6) *4)) 6.6m
Total surface area = 8 x6.6 52.8 m2
PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of Septic Tank for Birdie villa / Galahad villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Design flow rate 200 L/capita/day Design flow rate = (200 /1000) *4 0.8m3/day
2 No. of personnel 4 Volume of septic tank = 0.8*2 1.6m3
3 Liquid retention time 2 days Volume of sludge in 3 years = (30/100) * 1.6 0.48m3
4 Liquid depth 1.2 m Volume of tank = 1.6+0.48 2.08m3
5 Free board 0.5 m Surface area = Total volume / Liquid depth = 2.08 / 1.2 1.73m2
Cleaning frequency Width = 0.76m
2 2
6 ( every 3 years) 1 Surface area = 3 W , 1.73= 3 W , L = 3W Length = 2.28m
30% of total vol of
7 Volume of sludge deposited tank Height of septic tank = 1.2 + 0.5 1.7m
8 Ratio of Length (L) : Width (W) 3:1 Total volume of septic tank = 2.3 *0.76 *1.7 3m3
Design of septic tank
Dimension of septic tank: 2.5m x 1m x 1.7m
Minimum no. of compartments = 3
Minimum diameter of vent pipe = 75mm
Proposed volume of septic tank = 4.25m3
References
1. Ministry of Housingn and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd
PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of leaching field for Birdie villa/ Galahad villa
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 10-Feb-14 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Average percolation rate 335.5 mm/hr Total flow rate =0.8m3/day 800L/day
2 2
2 Infiltration rate 50 L/m /day Surface area = (800 L/day) / (50 L/m /day) 16
3 Let Width of one trench 0.6 m Surface area = Length x width
Distance between
4 consecutive pipeline 1.5 m Length = (16/0.6) 26.6m
No. of trenches 4 Length of 1 trench = 26.6/4 6.7m
Width = (4x 0.6) + ((1.5-0.6) *3)) 5.1m
Total surface area = 6.7 x5.1 34.2 m2
PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of Septic Tank for construction phase
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 12-Dec-13 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Design flow rate 100 L/capita/day Design flow rate = (100 /1000) *100 10m3/day
2 No. of personnel 100 Volume of septic tank = 10 * 1 10m3
3 Liquid retention time 1 days Volume of sludge in 6 months = (5/100) * 10 0.5m3
4 Liquid depth 1.2 m Volume of tank = 10+0.5 10.5m3
5 Free board 0.5 m Surface area = Total volume / Liquid depth = 10.5 / 1.2 8.75m2
Cleaning frequency Width = 1.70m
2 2
6 ( every 3 years) 1 Surface area = 3 W , 8.75= 3 W , L = 3W Length = 5.12m
7 Volume of sludge deposited 5% of total vol of tank Height of septic tank = 1.2 + 0.5 1.7m
8 Ratio of Length (L) : Width (W) 3:1 Total volume of septic tank = 5.12 * 1.7 *1.7 14.8m3
Design of septic tank
1. Dimension of septic tank: 5.1m x 1.7m x 1.7m
2. Minimum no. of compartments = 3
3. Minimum diameter of vent pipe = 75mm
4. To provide a water seal system
References
1. Ministry of Housingn and Lands, 2004. On Plot Sewage Disposal
VYYAASS Consulting Engineer Ltd
PROJECT: Proposed Real Estate Scheme Development on “Plot Q” of Avalon Golf Estate at Bois Sec
ELEMENT Design of absorption pit for the construction phase
DONE BY: JOB NO.
APPROVED BY: SHEET NO.
DATE: 12-Dec-13 REVISION NO.
No. ASSUMPTIONS CALCULATIONS OUTPUTS
Value Unit
1 Infiltration rate 50 L/m2/day Total flow rate =10m3/day (3 septic tanks) 10000L/day
2 Depth, H 2 m Design flow from one septic tank 3333L/day
3 Let Width, W 4 m Required absorption area= (3333L/day) /50 66.7m2
4 Length, L L m Absorption Area = 2HW+2HL+LW
66.7 = (2x2x4) +(2x2xL)+(Lx4)
L=6.4 m
G.T
MH PROPOSED REAL ESTATE
SCHEME DEVELOPMENT ON
PLOT Q OF AVALON GOLF
ESTATE AT BOIS SEC
1700
12th FLOOR, TOWER 1
NeXTeracom
G.T Cycbercity Ebene
Tel: +230 404 5800
MH
SEPTIC TANKS & LEACHING
FIELDS DETAILS
(ALBATROSS & LANCELOT)
GR.T 3500
BOIS SEC
MH
MH
GR.T 14.02.14 YR KB
14/bs/avpq/03 A3 : As Shown
G.T G.T
MH
MH
MH MH
A A
SEPTIC
MH TANK MH
Client
Arch.
M&E
Contractor
Other
8000
LEGEND
LEACHING FIELD
MH MANHOLE
B B GULLY
GT
TRAP
GREASE
GR.T TRAP
26 Brabant Street, 2nd Floor,
Diva Building,Port Louis.
Tel : + (230) 212 1757
Fax : +(230) 208 4551
E-mail :vyyaassconsultingengineer @intnet.mu
BRN : C07073722 VAT No. VAT20385911
1700
SCHEME DEVELOPMENT ON
PLOT Q OF AVALON GOLF
ESTATE AT BOIS SEC
14.02.14 YR KB
14/bs/avpq/04 A3 : As Shown
MH
MH
MH D
C C
LEACHING MH
FIELD Client
Arch.
6600
D LEGEND
MH MANHOLE
GULLY
GT
TRAP
GREASE
GR.T TRAP
26 Brabant Street, 2nd Floor,
Diva Building,Port Louis.
Tel : + (230) 212 1757
Fax : +(230) 208 4551
E-mail :vyyaassconsultingengineer @intnet.mu
BRN : C07073722 VAT No. VAT20385911
14/bs/avpq/05 A3 : As Shown
GR.T
MH MH
SEPTIC
TANK 150
MH MH
1500
Client
LEACHING Arch.
M&E
FIELD Contractor
Other
600 900 600 900 600 900 600
5100
LEGEND
MH MANHOLE
GULLY
GT
TRAP
GREASE
GR.T TRAP
26 Brabant Street, 2nd Floor,
Diva Building,Port Louis .
Tel : + (230) 212 1757
Fax : +(230) 208 4551
E-mail :vyyaassconsultingengineer @intnet.mu
BRN : C07073722 VAT No. VAT20385911
STANDARD DETAILS
FOR MANHOLE,GREASE TRAP
& GULLY TRAP
BOIS SEC
14.02.14 YR KB
14/bs/avpq/06 A3 : As Shown
Client
Arch.
M&E
Contractor
Other
Q7 Q8
P24 Q6 1,844m² 2,089m²
,850m² Q5 1,975m²
1,780m² G .T
MH
MH
G .T
MH
G .T
MH
Q4
MH
G R.T
G .T
MH
MH
S EP TICK
1000
G R.T
E
G .T
MH TAN 2500 MH
E
MH
G
CHIN
LEA F IELD
Q3 6700 Diva Building,Port Louis.
B
150
0
F
0
350
TANK
Q9
TIC
CH
1,693m²
MH
B
ING
A
MH
800
G R.T
G .T
900
0
MH
1,904m²
B
Q2 A
MH
00
ING
00
39
CH ELD
Q31
20
1,882m²
A
00
LE FI
H
M C
10
00
MH
N H
TA M
G .T
C
TI 00
MH
D EP 30 C
S
2,042m²
MH
00
PLOT Q OF AVALON GOLF
80
00
H
10
D M
G .T
EL C
MH
FI
G
IN
G R.T
Q30 E
00 H
G .T
20 C
00
EA
A
20
MH
00
D
ESTATE AT BOIS SEC
66
H
M
H
)
M
MH
E de
H
1,754m²
M
A
wi
MH
150
0
0
MH
350
S EP NK
LEA F IEL
TA
TIC
CH D
D
0m
66
MH
20
ING
00
Q11
0
00
800
IN G
block Q
MH
A
MH
AVALON GOLF ESTATE
20
A CHFIE LD
6.0
00
.T LE
MH
G .T
G R.T
G C
900
10
0
00
MH
B
80
MH
00
ad
C
12th FLOOR, TOWER 1
30
NK
E 2,064m²
00
TA D
MH
Ro
MH
IC
PT
SE
MH
s
.T
GR P TIC E
ces
25
G .T SE NK
00
00
m NeXTeracom
TA
MH
10
.7 3
MH
E
00
Ac
80,958m²
51
F IN G
LD
A CH FIE
19
MH MH LE
00
67
Cycbercity Ebene
m
. 64 B
F
Q29
E 25 A Tel: +230 404 5800
Q28 1,781m² E
1,872m² Future RQ33
ES Q32
NK
MH
00TA
30C
C
TI
S EP
vehicular 1,911m²
MH
D
10
C
80
E
D
1,975m²
EL
G FI
TA NK
IN
00
D
MH
20
TIC3 00 0
CH
MH
S EP
bridge (G) BETWEEN SEPTIC TANK AND
00
E
D
LEA
0
20
8 00 C 00
66
B
FIELD
A
0
MH
NG
1 00
C HI
0 C
2 00
L EA
MH
MH
T
G.
FEEDER BEAU-BOIS
MH
0
6m
6 60
0
2 00
D
Q34 Q12
e)
MH
.0
MH
id
MH
20
T PTIC
MH
25
E
00
NK
Q27 1,920m²
w
E
A
00
.T
S
00
GR
10
2,076m²
51
MH
IE LD G
IN
T
0m
G.
B
C
MH
F
EA
F
63m
L
MH
MH
67
MH
00
ay
8 00
.0
FIE AC H
2,046m² 34 .
LE
LD ING
MH
G .T
BOIS SEC
Halfw e
(6
F
MH
B
ad
A
H
MH
M
0 0
TA PTIC
B
9 00 1 50
SE 0
H
3 50
G R.T
M
Green
NK
Ro
hous
H
G .T M
MH
G .T
66
00
A
20
LD
H
MH
D
00
E
s
FIE
20
00
es
IN
CH
Space
L EA
cc
10
80
C
MH
00
Q13
00
A
G .T
E
A
11.03.14 YR KB
MH
NK
30
m
m 00
TA
B
C
MH
.0 8
C
TI
H
MH
S EP
M
.3 2
G .T
Acc
0
1,960m²
8 00
Q26
FIE AC H
G.T
LE
44
MH
LD ING
618m²
MH
14/bs/avpq/02 A3 : As Shown
16
0
3 50
MH
ess
A
TA PTIC
0
SE
GR
B
0 1 50
9 00
NK
1,882m²
.T
m
MH
G.T
MH
G.T
. 11
Roa
MH
A
6m
E Q14
24
MH
2
d
G.T
10.
(6.0
MH
B 2,065m²
MH
GR
6 70
0
.T
F
5 10
LE
A CH
MH
0
FE
I LD ING
MH
0m
2 50
0
ES EP F
E
T AN TIC
E
1 00
K
36m
MH
wid
0
Q25 MH
G.T
MH
e)
GR
.T
20.
1,805m²
MH
Q35 A
MH
B
MH
G.T
MH
200
0
8 00
0
FIE AC H
G.T
LE
LD ING
MH
E 1,915m²
0
660
L EA
F EF EEE
MH
800
MH
0
0
3 50
CH
A
Q36
D
MH
IN
TA PTIC
0
SE
GR
0
MH
1 50
B
G FIE
9 00
NK
.T
LD
G.T
MH
G.T
D
S E 300
Q24
D
MH
P TIC
A
C
0
200 0
D
100
TA
1,881m²
0
NK
E
E
MH
C
MH
G.T
2,004m² RR
MH
MH
GR
MH
Q15
.T MH
MH
MH
B
B
9 00
0
MH
MH
E
L EA
G.T
8 00
GR
1,918m²
MH
.T
CH
A
200
EBE
IN
0
T AN TIC
MH
S EP
GFIE
K
LD
0
0
660
3 50
MH
L EA
1 50
800
0
AA
B
Q23
A
0
A
C HI
MH
D
NG
FIEL
D
U
S EP
U
C
0
TIC 0
MH
200 0
2,016m²
300
100
TA NK
G.T
-- B
GR
MH
.T
MH
C
Q16
BOOI S
G.T
MH
A
MH
MH
B
MH
MH
380
MH
G.T
0
1,884m²
I
MH
8 00
FIE AC H
G.T
LE
LD ING
E
S
MH
0
3 50
MH
A
TA PTIC
0
SE
0 1 50
9 00
NK
GR
MH
.T
MH
G.T
2000
G.T
MH
A
MH
6600
LEA C H
MH
Q22
8000
IN GFIELD
MH
D
G.T
Q17
MH
S EP TIC
2000
C
1,935m²
GR
1000
.T
3000
Client
TA NK
MH
E 1,893m²
MH
C
MH
Arch.
MH
M&E
Contractor
Other
MH
G .T
G R.T
G .T MH
Q18
MH MH
S EP TIC 1,896m²
1000
TANK
E E2500
MH
MH
F
5100
LEA CH ING
F IELD
6700
B F
Q19
B 1,538m²
9
4°
17
Q20
2,724m² A
370
2
E
0
YP