Tonang - Losses

You might also like

Download as rtf, pdf, or txt
Download as rtf, pdf, or txt
You are on page 1of 1

ETAP

Project: Page: 21
12.6.0H
Location: Date: 05-29-2023
Contract:    SN:       
Engineer: Revision: Base
Study Case:      LF
Filename: uas aplikasi Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
%    Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T1  0.085  0.054 -0.085 -0.053  0.3  1.0  100.0  99.2  0.78

T2  0.085  0.054 -0.085 -0.053  0.3  1.0  100.0  99.2  0.78

T3  0.085  0.054 -0.085 -0.053  0.3  1.0  100.0  99.2  0.78

T4  0.085  0.054 -0.085 -0.053  0.3  1.0  100.0  99.2  0.78

T5  0.175 -0.471 -0.167  0.503  8.0  31.7  100.0  95.8  4.16

 9.1  35.9

You might also like