Professional Documents
Culture Documents
Tonang - Losses
Tonang - Losses
Tonang - Losses
Project: Page: 21
12.6.0H
Location: Date: 05-29-2023
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: uas aplikasi Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
9.1 35.9