MEETING NO: MIN 05 DATE: 12/01/2023 TIME : 0600Hrs VENUE : Mining offices
Apologies –
Opening remarks were rendered and personnel attendance was greatly appreciated. All those present were encouraged to continue doing well by attending the
meetings and to encourage other employees to attend and also be on time and safety meetings are not for morning crews only.
MINUTES
Minutes of the previous meeting were not available on the time of the meeting, the Mine Captain emphasised on the
importance and availing previous minutes on every meeting
RESPONSIBILIT BY WHEN
No ITEM COMMENT ACTION Y INITIAL NEW
1 30.5L Water spray is needed at 30.5L -To install valve and a water connection at 30.5 Shaft Ongoing
Timberman
level.
2 Safety in - Ensure to do detailed pre-task risk -Practice safety measures always where safety All workers On
work areas assessment for every new task. Use chains, respirators, ear plugs and goggles should going
provided PPE/C at all times. always be used.
3 24-10 Level - The issue of the fan is still open. -The ventilation officer to conduct a vent survey to Supervisors, Open
correct the air flow direction. Timberman
4 31L Loading - The issue of bulkhead at station is still -To use red wood planks to construct bulkhead. Shaft
station open (Protective head cover for Bellman) Timberman, Open
Supervisors
OTHERS
MATTERS ARISING
4) Issue of rain coats. Rain coats are provided once in two/three years and only when the need arises.
5) 26 level toilet is required and the fan after grizzly is not working. Foul air is flowing to the station.
CORRECTIVE ACTION
1) The Shaft Timberman responsible with the crusher and loading stations was encouraged to do an examination and then take note on the
areas and rectify.
_____________________ _____________________________
E. Ndimande/S.Mangena S. Chisale T. Mudenda