Professional Documents
Culture Documents
Accomplishment Ojt
Accomplishment Ojt
Accomplishment Ojt
ACCOMPLISHMENT
REPORT
Diasanta, Angel Kryshna
Diata, Alvin Louie D.
Dineros, Alysa Marie
Dineros, Maidene S.
Diolata, Arven
Diolata, Vincent Paul
Doloiras, Jan Paolo D.
Dolot, Michelle Ann
Dondonilla, Chelsea Ann
Dones, Ian Nicole
Ebio, Aristotle D.
Ehia, John Carlo F.
Floralde, Jerome
INTRODUCTION
In our modern world we live in, it's hard to imagine a life without
power or should I say electricity. Our world develops and continues to
develop things because of electricity. Technologies that are powered by
electricity may serve as a useful device or a dangerous threat to
humankind and it's nature. It may help our world prosper or crumble
because of destruction.
ACKNOWLEDGEMENT
ORIENT
ATION
MECHANICAL BUILDING
SSC DORMITORY
GENERATOR
ARCHITECTURE BUILDING
SCHEDULING OF LOADS
The electrical load scheduling is the process of estimating the
instantaneous loads operating in an installation. The load
schedule provides the load for the particular installation in terms of
apparent, reactive and active power (kVA, kVAR and kW) and usually
carried out at the sub facility area or at the switchboard.
REFERENCE:
http://engineering.electrical-equipment.org/electrical-distribution/preparation-benefits-
electrical-load-schedule.html
ARCHITECTURE
BUILDING LOA D
SCHEDULE