Professional Documents
Culture Documents
Salenga Residence Working Drawings
Salenga Residence Working Drawings
PROVINCE OF PAMPANGA
ROOF LINE
N
MUNICIPALITY OF BACOLOR
PROPERTY LINE OFFICE OF THE BUILDING OFFICIAL
3.00
3.00
_____________________________
LAND USE AND ZONING
3.90
SLOPE SLOPE
_____________________________
4.23
LINE AND GRADE
PERSPECTIVE
19.52
27.52
27.52
SCALE NTS
ROAD
_____________________________
E ARCHITECTURAL
AV
OS
A NT
9.44
4.00 METERS
S
AS
AB
SE SLOPE SLOPE
JO
_____________________________
STRUCTURAL
E
AV
TOS
N
SA
2.00
A S
AB
6.95
_____________________________
E
JOS SANITARY
SITE
3.00
EXISTING PARKING
4 3
_____________________________
ELECTRICAL
8.00 METERS R R O W
REDENTOR L. MIRANO JR. PTR. NO. 5645984c MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON: JANUARY, 2022
A/1
A RMIRANO ARCHITECT ISSUED AT: PAMP. CAPITOL STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHITECTS & ASSOCI ATES
1 2 3 4 1 2 3 4
B 10.50
0.86
0.86
1.55 0.75
A A
2.06
3.00
BEDROOM 3
4.43
4.32
0.94
BEDROOM 2
A B C D E
WM
SLOPE SLOPE
LAUNDRY
B B
AREA
3.13
3.13
KITCHEN RINDGE LINE
1.70
T&B
1.90
C C
0.87
15.10
TOP OF ROOF BEAM
0.30
5.38
15.00
15.00
16.60
FIN. CEILING LINE
A
3.63
DINING AREA
6.80
2.70
3.00
BEDROOM 1
5.53
I
A
1.60
SLOPE SLOPE
A
LIVING AREA
3.70
3.75
5.20
L
1.70
WALK-IN-CLOSET
E E
LEFT ELEVATION
0.85
1.65
1.50
T&B
SCALE
0.85
1:100
2.30 4.40 5.80
12.50
2.30 4.30 3.90
10.50
1 2 3 4 E D C B A 4 3 2 1
RINDGE LINE RINDGE LINE RINDGE LINE
1.90
1.90
1.90
TOP OF ROOF BEAM TOP OF ROOF BEAM TOP OF ROOF BEAM
0.30
0.30
0.30
FIN. CEILING LINE FIN. CEILING LINE FIN. CEILING LINE
6.80
6.80
6.80
3.00
3.00
3.00
GROUND FLOOR PLAN GROUND FLOOR PLAN GROUND FLOOR PLAN
1.60
1.60
1.60
FIN ROAD LINE FIN ROAD LINE FIN ROAD LINE
REDENTOR L. MIRANO JR. PTR. NO. 5645984c MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON: JANUARY, 2022
A/2
A RMIRANO ARCHITECT ISSUED AT: PAMP. CAPITOL STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHITECTS & ASSOCI ATES
1 2 3 4 E D C B A 0.70 1.20 0.70 1.20 0.70 1.20 2.30
1.20 0.40
RINDGE LINE RINDGE LINE
W-2 W-2 W-2
W-2
1.90
1.90
0.20 D-3
1.35
TOP OF ROOF BEAM TOP OF ROOF BEAM 0.80 0.70 0.60 3.03
0.30
0.30
FIN. CEILING LINE FIN. CEILING LINE
D-3
DINING AREA W-2
1.56
1.70
WM W-4 2.70
6.80
6.80
BEDROOM 1 KITCHEN BEDROOM 3 D-4
3.00
3.00
LIVING AREA DINING AREA
D-5
1.20
1.20
W-3 W-5
0.70
GROUND FLOOR PLAN GROUND FLOOR PLAN
D-4
0.49
0.20
1.50
1.60
1.60
W-1 2.70
3.00
1.20
D-1 W-2
1.60
SECTION THRU A SECTION THRU B
0.98
1.20
SCALE 1:100 W-2
SCALE 1:100 W-2
1.53
D-2
0.35 1.20
W-2 0.70 2.70
3.65
1 2 3 W-1 W-1
D-5
0.90 1.50 0.80 0.90
10.50
2.30 8.20
A
DOORS & WINDOWS ELEVATIONS SCHEDULE OF DOORS & WINDOWS
2.20
±3000 FCL
4.43
B
4.85
±2700 FCL
0.50
1.70
±3000 FCL
0.90
1.10
1.20
C
1.60
15.10
2.10
2.10
2.10
2.10
2.10
1.60
15.00
1.20
1.00
0.90
±3000 FCL
0.50
FIN. LOOR LINE
5.53
±3000 FCL ALUMINUM FRAMED ALUMINUM FRAMED ALUMINUM FRAMED ALUMINUM FRAMED ALUMINUM FRAMED
D 3 PANEL
AWNING WINDOW
2 PANEL
SLIDING WINDOW
2 PANEL
SLIDING WINDOW
3 PANEL
AWNING WINDOW
2 PANEL
SLIDING WINDOW
7.25
±2700 FCL
E 1.85 1.85 0.90 0.80 0.70 0.70
1.65
±2700 FCL
2.10
2.10
2.10
2.10
2.10
4.20 5.60
9.80
0.05
REDENTOR L. MIRANO JR. PTR. NO. 5645984c MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON: JANUARY, 2022
A/3
A RMIRANO ARCHITECT ISSUED AT: PAMP. CAPITOL STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHITECTS & ASSOCI ATES
1 2 3 4 1 2 3 4 1 2 3 4
11.30 10.50
A TB-1 TB-1
A RB-1 RB-1
A RB-1 RB-1
C1-F1 C1-F1 C1-F1
2.20
2.20
RB-1
RB-1
3.00
TB-1
4.43
4.43
4.43
RB-1
RB-1
RB-1
RB-1
TB-1
TB-1
SLAB ON FILL SLAB ON FILL
TB-1 RB-1 RB-1
C1-F1 C1-F1
TB-1 RB-1 RB-1
B B B
3.13
RB-1
RB-1
TB-1
4.85
4.85
RB-1
RB-1
TB-1
SLAB ON FILL
C1-F1 C1-F1
1.70
1.70
1.70
RB-1
RB-1
RB-1
RB-1
TB-1
TB-1
C TB-1 TB-1
C RB-1 RB-1
C RB-1 RB-1
15.10
15.10
C1-F1
15.00
15.00
15.00
15.00
3.63
3.63
RB-1
RB-1
TB-1
TB-1
1.50
5.53
5.53
TB-1
E X I S T I N G E X I S T I N G
D D D
1.50
C1-F1 C1-F1
7.25
7.25
SLAB ON FILL
1.50
3.60
RB-1
RB-1
TB-1
3.75
TB-1
1.70
1.70
1.50
3" thk SLAB ON FILL W/ 10mmØ
BARS @ 0.50M.O.C. BOTHWAYS
0.68
TB-1
1.65
1.65
1.65
1.50
SLAB ON FILL
TB-1 TB-1
C1-F1 2.30 4.20 4.00 2.30 4.20 4.00 0.60 0.60 0.60 0.60 0.60 0.60 0.60
9.80
SCHEDULE OF FOOTINGS
THCKNESS (MM.) SIZE (MM.) REINFORCEMENT DEPTH(MM.)
MARK REMARKS
T WIDTH LENGHT BAR'S' BAR'L' VERIFY
F-1 300 1000 1000 8-16 MMØ 8-16 MMØ 1500 SQ. FOOTING
TIN
PTR. NO. MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON:
S/1
A RMIRANO CIVIL ENGINEER ISSUED AT: PAMPANGA CAPITOL STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHITECTS & ASSOCI ATES
.5mm PRE PAINTED GUTTER
12mmØ SAG ROD
0.86
0.86
A DS
RB-1
2.06
4.32
DS
RB-1
RB-1
0.94
DS
SLOPE RB-1
B
3.13
RB-1
RB-1
C DS
0.87
15.10
R O O F B E A M
5.38
16.60
2.70
TRUSS DETAIL
SCALE 1:30
D DS
12 mm SAGROD
0.5mm PRE-PAINTED GUTTER
5.20
E DS
0.85
SPOT DETAILS
SCALE 1:10
12mm. VERTICAL
0.60 0.60 DOWELS @ 0.60 m.
NATURAL ON CENTER
GRADE LINE #5 CHB FOR
EXTERIOR WALLS 9mmØ STIRRUPS
LENGTH #4 CHB FOR L/4
INTERIOR WALLS L/4
(DEPTH OF EXCATION)
DEPTH
BAR 'L'
0.60
10mm. HORIZONTAL
DOWELS @ 0.60 m.
WIDTH
OR EVERY
NATURAL 3 LAYER COURSE
BASE GRADE LINE
D
L/5 L/5
L
DEPTH
0.60
T
SECTION
COMPACTED
GRAVEL BED TYPICAL BEAM DETAIL
TIE BEAM SECTION CHB WALL DET. SCALE NTS
SCALE NTS
DETAIL OF COLUMN/FOOTING SCALE 1:20
NOT TO SCALE
TIN
PTR. NO. MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON:
S/2
A RMIRANO CIVIL ENGINEER ISSUED AT: PAMPANGA CAPITOL STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHI TECTS & ASSOCIATES
GENERAL NOTES: DS
DS
1. ALL PLUMBING WORKS INDICATED HEREIN SHALL MEET THE PROVISION DS
OF THE PLUMBING CODE OF THE PHILIPPINES,THE NATIONAL PLUMBING
CODE. A 1 DS SV
TR A 1
2. PLUMBING CONTRACTOR TO COORDINATE WITH OTHER RELATED SV
4 "Ø
PV
C WM
mm
20
4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL SITE .00 E KF .00 CB
3.9 4 D DS 15
3.6
3
CO
KS 3.9 4
PP mm E DS
RP 20 0 PIP SV 0
STRUCTURES AS VERIFIED BY THE CONTRACTOR. IPE
2 "Ø
PV
C
TR
4.3
0
E
E H
B
4.3 Ø
PV
C
PIP
E
CB
0 4"
10 0 10 0
.5 0 1.7 .50 5.2
COLD WATER LINE/ SHALL BE HIGH DENSITY POLYPROPYLENE (PP-R) PIPES PN-20
5 SE EX PIP
E
HOT WATER LINE CONFORMING TO DIN STANDARDS, "UNITEC-BELDEN" BRAND 1.6 PT IST C
PV
3.9 3.9 IC IN 4"
Ø CB
0 0 TA G
NK
OU
VENT PIPES SHALL BE POLYVINYL (PVC) PIPE, SERIES "CROWN PIPES" BRAND TF
LO
OR APPROVED EQUAL. FITTINGS SHALL BE PVC WITH SOLVENT W
CEMENT JOINTTO ASTM D2564.
SEWER PIPES SHALL BE POLYVINYL (PVC) PIPE, SERIES "CROWN PIPES" BRAND WATER SUPPLY ISOMETRIC LAY-OUT SEWAGE LINE ISOMETRIC LAY-OUT
OR APPROVED EQUAL. FITTINGS SHALL BE PVC WITH SOLVENT SCALE 1:100 SCALE 1:100
CEMENT JOINTTO ASTM D2564.
0.50
FCUD/WACUD LINE SHALL BE POLYVINYL (PVC) PIPE, SERIES "CROWN PIPES" BRAND 0.50
0.30
OR APPROVED EQUAL. FITTINGS SHALL BE PVC WITH SOLVENT
0.10
CEMENT JOINTTO ASTM D2564.
10mm Ø BAR
FLOOR DRAIN SHALL BE POLYVINYL (PVC) PIPE, SERIES "CROWN PIPES"
0.50
0.60
0.40
10mm Ø VERT. BAR
BRAND OR APPROVED EQUAL. FITTINGS SHALL BE PVC @ 0.40MOC
0.10
PLAN
FLOOR CLEAN-OUTS SHALL BE CAST IRON BODY W/ BRONZE OR 10mm Ø BARS SCALE 1:20
GREASE TRAP STAINLESS COVER STRAINER "JPI" MODEL SECTION
JPI-100-13,JPI-100-1 OR APPROVED EQUAL.
COLD WATER
SEWAGE LINE
REDENTOR L. MIRANO JR. PTR. NO. 5645983c MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON: JANUARY, 2022
P/1
A RMIRANO MASTER PLUMBER ISSUED AT: PAMP. CAPITOL STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHI TECT S & ASSOCI AT ES
1 2 3 4 1 2 3 4 1 2 3 4
10.50
0.86
0.86
A CB CB
A A DS DS
2.06
4.43
4.43
4.32
CB DS
0.94
HB
CB SVTR SVTR
DS
CO FD
KS KF
SVTR SVTR DS
3.13
3.13
CB
3.13
1.70
KS
LF
LAV WC SD
FD CO LAV WC SHO
C CB
C C DS
0.87
4" Ø PVC PIPE 4" Ø PVC PIPE SVTR 20mm Ø PPR PIPE 20mm Ø PPR PIPE 20mm Ø PPR PIPE SVTR
15.10
CO
5.38
4" Ø PVC PIPE
5.33
14.95
15.00
15.00
16.60
15.00
3.63
3.63
2.70
5.53
20mm Ø PPR PIPE
D CB CB
D D DS DS
4" Ø PVC PIPE
SLOPE SLOPE
3.70
3.75
3.75
5.20
5.20
1.70
E CB
E E DS
0.85
1.65
1.50
1.50
4" Ø PVC PIPE
0.85
GV HB HB
M
EXISTING OUTFLOW 2.30 4.40 5.80
CV
OUTFLOW SEPTIC TANK FROM WATER SUPPLY LINE
12.50
2.30 4.30 3.90
2.30 4.30 3.90
10.50
10.50
GROUND FLOOR SEWAGE LINE LAY-OUT GROUND FLOOR WATER SUPPLY LAY-OUT ROOF DRAINAGE LAY-OUT
SCALE 1:100 SCALE 1:100 SCALE 1:100
TIN 339-338-917-000
PTR. NO. 5645983c MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON: JANUARY 2022
P/2
A RMIRANO MASTER PLUMBER ISSUED AT: PAMPANGA CAPITOL STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHITECTS & ASSOCI ATES
GENERAL NOTES:
1. ALL ELECTRICAL WORKS SHALL BE DONE IN ACCORDANCE
WITH THE RULES
AND REGULATIONS OF THE PHILIPPINE ELECTRICAL CODE,
230 VOLTS, 60 HZ, SINGLE PHASE
THE CITY FIREDEPARTMENT AND THE LOCAL POWER COMPANY.
2. ALL ELECTRICAL WIRING SHALL BE INSTALLED IN RIGID CONDUIT 2-30 sqmm THHN Cu WIRE + 8 sqmm
SERVICE ENTRANE TW GROUND IN 32 mm Ø RSC
IF RUN IS
EMBEDDED IN CONCRETE AND HOLLOW BLOCKS.
3. WHENEVER REQUIRED AND NECESSARY PULL BOXES AND M KWhr METER
20MMØ RESPECTIVELY. LIGHTS 1 2 LIGHTS 3 2 20 50 10 9 CONVENIENCE OUTLET 1620 230 7.04 3-3.5 mm² THHN Cu 15mm Ø PVC
5. ALL WIRING MATERIALS AND DEVICES TO BE USED SHALL BE 20 20 4 2 20 50 10 8 CONVENIENCE OUTLET 1440 230 6.26 3-3.5 mm² THHN Cu 15mm Ø PVC
NEW AND THE C.O. 4 C.O.
3 RANGE (3KW) 2-5.5 mm² THHN + 3.5 sqmm TW cu
5 2 20 50 10 1 3000 230 13.04 20mm Ø PVC
APPROVED TYPE FOR BOTH PURPOSES AND LOCATION.
20 20
6. THE MOUNTING HEIGHT OF WIRING DEVICES SHALL BE AS FOLLOWS. 6 2 20 50 10 1 WASHING MACHINE 1500 230 6.52 3-3.5 mm² THHN Cu 15mm Ø PVC
RANGE 5 6 WM
A.SWITCHES 1.40M. ABOVE FLOOR LEVEL 7 2 20 50 10 1 APPLIANCE OUTLET 1000 230 4.35 3-3.5 mm² THHN Cu 20mm Ø PVC
B.CONV. OUTLET 0.30M. ABOVE FLOOR LEVEL 20 20
8 2 20 50 10 1 REFRIGERATOR 800 230 3.48 3-3.5 mm² THHN Cu 20mm Ø PVC
C.PANEL BOARD 1.80M. ABOVE FLOOR LEVEL APPLIANCE 7 8 REF
D.SERVICE METER 1.80M. ABOVE FLOOR LEVEL 9 2 30 50 10 1 ACU (1.0 HP) 1840 230 8.00 2-5.5 mm² THHN + 3.5 sqmm TW cu 20mm Ø PVC
30 30
7. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT 10 2 30 50 10 1 ACU (1.0 HP) 1840 230 8.00 2-5.5 mm² THHN + 3.5 sqmm TW cu 20mm Ø PVC
ACU 9 10 ACU
SUPERVISION OF A DULY LICENSED ELECTRICAL ENGINEER
11 2 30 50 10 1 ACU (1.0 HP) 1840 230 8.00 2-5.5 mm² THHN + 3.5 sqmm TW cu 20mm Ø PVC
OR MASTER ELECTRICIAN. 20 20
ACU 12 SPARE 12 2 20 50 10 SPARE 1000 230 4.35 STUB UP IN 15mm Ø PVC
11
13 2 20 50 10 SPARE 1000 230 4.35 STUB UP IN 15mm Ø PVC
20 20
SPARE 13 14 SPARE 14 2 20 50 10 SPARE 1000 230 4.35 STUB UP IN 20mm Ø PVC
CHANDELIER
3WS2 3WAY 2 GANG SWITCH
COVE LIGHTS
D3WS1 3WAY 1 GANG SWITCH WITH DIMMER
GARDEN LIGHT
WALL LAMP
DS1 1 GANG SWITCH WITH DIMMER
PANEL BOARD
2 GANG 220V RANGE OUTLET
220
INTERNET OUTLET/CONNECTION
CCTV
TIN
PTR. NO. MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON:
E/1
A RMIRANO PROFESSIONAL ELECTRICAL ENGINEER ISSUED AT: STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHI TECTS & ASSOCIATES
1 2 3 4 1 2 3 4
10.50 10.50
10 9
3.00
4.43
4.43
2 x
7 8
t
6 S2 b1b2 S2 za1
AO REF
WM WM w
5
S3 wxy
B B
3.13
3.13
RANGE r p q
1.70
1.70
S3 rst
S2 uv
4 1
C C o
S2 pq S3 ijk
WP ACU s
m j
3 11
15.00
15.00
15.00
15.00
k
3.63
3.63
l
5.53
5.53
i
S2 no
D D S2 lm
CTV
3.75
3.75
b
S1 h
1.70
1.70
a h
CTV S2 ab
E E c
S3cde
d
S2 fg
1.65
1.65
1.50
1.50
f
e g
10.50 10.50
TIN
PTR. NO. MR. JORDAN SALENGA 3 BEDROOM 1 STOREY RESIDENTIAL BUILDING AS SHOWN
ISSUED ON:
E/2
A RMIRANO PROFESSIONAL ELECTRICAL ENGINEER ISSUED AT: STA. BARBARA, BACOLOR PAMPANGA ADDRESS: STA. BARBARA, BACOLOR PAMPANGA SCALE: AS INDICATED
ARCHI TECTS & ASSOCIATES