Date: 23.04.

22
MAY MONTH PLAN
Carry New Total Material 100% Marketing Packing Packing Packing PQ
S. No Job no. Customer Over (MT) Plan Recd (MT) Matched Dispatch RM Indent Raw Material Cutting Plan Budget Outsourcing Drawing ERP Release material Material - Material - Document Prod Start RFD LEAD TIME
(MT) (MT) DU (MT) Plan (MT) indent Steel Wood
Plan C 28.04.22 25.04.22 30.04.22 C C 28.04.22 20.05.22 20.05.22 30-Apr 25.05.22 LS STIFF TRAIL HYDRO PAINT
01 RIB-563 HITACHI-FEED HOPPER 47.4 0.0 47.4 47.4 47.0 47.4 20
Actual 10-May12-May 22-May 23-May 25-May
Plan C C 25.04.22 30.04.22 C C 28.04.22 20.05.22 20.05.22 30-Apr 25.05.22 LS CS STIFF TRAIL PAINT
02 RIB-564 HITACHI-SILOS 31.1 0.0 31.1 31.1 31.1 31.1 20
Actual 7-May 12-May 20-May 23-May 25-May
Plan C C 25.04.22 30.04.22 C C 28.04.22 20.05.22 20.05.22 30-Apr 25.05.22 LS CS STIFF TRAIL PAINT
03 RIB-565 HITACHI-EVA COOLER 25.0 0.0 25.0 25.0 25.0 25.0 20
Actual 9-May 14-May 20-May 23-May 25-May
Plan C 28.04.22 30.04.22 28.04.22 C 27.04.22 25.04.22 25.05.22 25.05.22 28.04.22 25.04.22 30.05.22 BEND DRILL BUTT JT HYDRO PAINT
04 RIB-566 U-NEEK 0.0 23.0 23.0 4.0 0.0 23.0 30
Actual 10-May 30-Apr 29-May 30-May
Plan 30.05.22
05 RIB-574 THERMAL SYS 50.0
Actual
PL 26.04.22 ST 26.04.22
Plan C TU 05.05.22 BAL 05.05.22 27.04.22 10.05.22 26.04.22 26.04.22 04.05.22 15.05.22 15.05.22 25.04.22 28.04.22 28.05.22
06 RIB-576 RUNGTA MINES 0.0 56.6 56.6 51.0 0.0 56.6 30 BEND PWHT BUTT JT ATTACH HYDRO
Actual 10-May 20-May 22-May 24-May 26-May
Total 103.4 79.6 183.0 158.4 103.0 233.0
57% 43% 87% 56%