Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

I Gede Karya Yasa

081345080080 - 0817550010
Gede_karya@yahoo.com

TO : PRINCIPAL MANAGER OF HR-DEPARTMENT

Dear Sir / Madam,


I am I Gede Karya Yasa,36 years, and married, with my background is a
Mine Plan from Mining Engineering Department, I would like to get the
opportunity to join with your company.

As you will note in my curriculum vitae that I have enclosed, I have good leadership and ability
to work as team with people in some organization and even
I really appreciate that you give me more chance for personal interview and further test at your
convenience. Thank you in advance for your attention and consideration.

Yours Faithfully ,

I Gede Karya Yasa


0813 4508 0080

CV Gede Karya
I Gede Karya Yasa
081345080080 - 0817550010
Gede_karya@yahoo.com

PERSONAL DETAILS

Full Name : I Gede Karya Yasa


Nick Name : Gede
Place & Date of Birth : Kerta Bhuana, February 08th , 1982
Gender : Male
Marital Status : Married + 2
Religion : Hindu
Nationality & Citizenship : Indonesian
Health : Excellent
Interest : Reading, Traveling, and Sport

FORMAL EDUCATION

2000-2002 Warma Dewa University, Denpasar


1997-2000 SMK 17 , Senior High School, Manunggal Jaya
1994-1997 SMPN 4 , Junior High School, Manunggal Jaya
1988-1994 SDN 27 , Elementary School, Kerta Bhuana.

SKILLS
Computer Microsoft Office
AutoCAD
SURCAD
Surpac 4.0 , 5.0 , 5.1 ( Surveying ) Minescape
Map info
Mapsourch ( For GPS Software )

TRAINING, COURSE, SEMINAR & CERTIFICATES


TRAINING, COURSE, SEMINAR
2006 “Surpac 5.0 (Basic) Surveying” by PT Globecon Indonesia, Balikpapan, East Kalimantan,
Indonesia.

CV Gede Karya
I Gede Karya Yasa
081345080080 - 0817550010
Gede_karya@yahoo.com

INSTRUMENT EXPERIENCES

SOKKIA Power Set ( 2010 , 3030R , 1010 , Set


3X ) Set 2c , 3c
NIKKON DTM 352 , 552 , NPL-632HORRIZON

WORK EXPERIENCES

2015-NOW Mine Plan Engineering CV Multi Karya Tehnindo


Job Site Bumi Mulawarman Persada
Work Responsibility : To prepare short term mine design and
mine planning includes : Daily,Weekly,Monthly Plan &
Controlling,
As guideline for Production Departement to achieve the target
set up by the company and continuity Coal supplay to client,
daily meeting,weekly meeting,monthly meeting for Plan And
Evaluiting Plan of Production.
Joint Survey Calculation - Progress Claim End of Month.

2014-2015 Mine Plan Supervisor PT Surya Tehnik Anugerah


Job Site Trisensa Minera Utama.
Work Responsibility : To prepare short term mine design and
mine planning includes : Daily,Weekly,Monthly Plan &
Controlling,
As guideline for Production Departement to achieve the target
set up by the company and continuity Coal supplay to client,
daily meeting,weekly meeting,monthly meeting for Plan And
Evaluiting Plan of Production.

2011-2013 Mine Plan Engineering Of Engineering Division CV. Multi Karya


Tehnindo, Site ABK ( Anugerah Bara Kaltim )
with responsibility : to prepare short term mine planning,
Long Term Planning includes: daily, weekly,Monthly and
Yearly basis plan as the guideline for Production Department
to achieve the target set up by the company in the line
and to ensure the continuity of coal supply to the client
.Weekly Meeting For Evaluation Plan of production Cost
control Project, Cost Unit Production

CV Gede Karya
I Gede Karya Yasa
081345080080 - 0817550010
Gede_karya@yahoo.com

2010-2011 Supervisor Engineering Of Engineering Control Departement PT


RPP CONTRACTOR INDONESIA ( RCI ) Job Site Jembayan
Muara Bara ( JMB )
with responsibility : to prepare short term mine
planning, includes: daily, weekly, and monthly basis plan as
the guideline for Production Department to achieve the
target set up by the company in the line and to ensure the
continuity of coal supply to the client .
Evaluation Production of Plan ,claim OB & Coal
.
2009- 2011 Senior Surveyor Department of
Engineering PT. RPP Mining Contractors ( RMC ) GDM
Project East Kalimantan with Responsibility for the
Measurement of monitoring according to design , hauling
distance , installation of boundary , monitoring vessel, and
joint calculation of Progress end of month

2008- 2009 Group Leader ( GL ) Engineering


Department of Engineering PT. SAPTA INDRA SEJATI ( SIS )
Indomining Project East Kalimantan with Responsibility for
the Leader Of Survey Team to Measurement of monitoring
according to design , hauling distance , installation of boundary
, monitoring vessel, and joint calculation of Progress end of
month

2007-2008 Sr.Surveyor PT Dwipa Indonesia of engineering Department with


responsibility to prepare short term mine planning,
includes: daily, weekly, and monthly basis plan as the
guideline for Production Department to achieve the
target set up by the company in the line and to ensure the
continuity of coal supply to the client.

2005-2007 Surveyor of Engineering Department PT.LEIGHTON


CONTRACTORS INDONESIA ( GHP Project Sangasanga )
eastli ma nta n
Responsibility And Duty : Monitoring Mine as according to
design equal to department produce to be can reach goal of
target, Installing boundary which have giving by owner,
measurement of situation of Daily , weekly , monthly ,
Hauling Distance , Calculation of Final Joint Survey end of
month.

CV Gede Karya
I Gede Karya Yasa
081345080080 - 0817550010
Gede_karya@yahoo.com

2002 2005
– Asst. Surveyor Of Technical Department PT KITADIN ( BAN PU )
Site Embalut East Kalimantan
Responsibility and duty : Assisting surveyor in work
measurement, Topography , pick up drill hole , monitoring
survey of contractor , Installing boundary , Measurement joint
survey end of month.

CV Gede Karya

You might also like