Preliminary Study: Bowstring

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

4

Observing the chart that displays the 4.1. GRAPHIC STUDY


2
ratio of the total among of steel used by m of
deck slab (Figure 3.2), the quantities of steel At the beginning of the Preliminary
used in a Bowstring solution grows Study, some sketches were drawn to image
approximately in a linear way with the span, some of the possible ways to raise a Bowstring
but it is not independent of the bridge use, tied-arch deck. After analyzing which ones
since highway decks have, in general, less were viable and physically possible, there was
steel than railway and road/railway decks with one which imposed itself for its innovation and
the same span. challenging design (Figure 4.1).

4. PRELIMINARY STUDY

The Preliminary Study was based on a


constructed continuous pre-stressed concrete
box-girder deck solution with variable height,
named Bridge over the Sorraia River, in
Portugal, which is part of the A13 highway.
Figure 4.1 – Sketches for the proposed solution
This bridge consists in two separate decks,
with three spans (75 m + 120 m + 75 m) and a Having the layout defined, it was
total length of 270 m. decided to choose a composite steel-concrete
All the studies are planned to substitute deck, with a reinforced concrete deck slab,
the main span of 120 m, with a Bowstring with crosswise steel girder attached on a central
a single deck solution, extending the deck of longitudinal steel tube and lateral box-girder
the side viaducts to the transition piers. beams, and a steel arch made of a tube with
The deck’s cross section is composed high diameter and thickness, with interior
by four traffic lanes with 3.75 m each; 3.0 m diaphragms.
and 1.0 m for the roadsides, right and left
respectively; sidewalks 1.05 m wide; curbs;
safety guards; fascia beams and drainage 4.2. PRE-DESIGN
system.
Some of these elements were modified Before performing the safety standard
by the 3D geometry of the hangers in order to verifications (Serviceability Limit State and
accomplish some regulations, and adopting Ultimate Limit State), it was necessary to admit
one deck instead of two, like adopting a New dimensions for the deck elements (deck slab,
Jersey traffic separator for the central longitudinal and transversal beams, arch and
reservation. hangers).
The deck slab 30 cm thick was defined
according to the structural behaviour, use of
the bridge, deck materials and deck width.