JOB SAFETY ANALYSIS RECORD SHEET

Project UPGRADE SECURITY FACILITIES EAST WEST PUMP STATIONS Contractor ABC
Plant Location Saudi Aramco Pump Station 11 (PS-11) Project Number 6601000190
BI Number BI-10-00449
Description of Activity JSA for Relocation of Existing Security Facilities
JSA No. SA-ABC-JSA-PS11-01
Prepared By Reviewed By Reviewed By. Reviewed & Approved By.
ABC HSE Supervisor ABC HSE Manager Project Manager SAPMT SAFETY Advisor/Coordinator
Name Name Name Name

Signature Signature Signature Signature

Power Shutdown, Electrical works, Cable Laying and Security devices Relocation Activities: Hand tools, Power Tools ( Grinder, Drill Machine, Heat
Gun), Testing equipment (Multimeter etc.), Power generator and Fusion Splicer
Asphalt Cutting and Manual Excavation Activity: Asphalt cutter, Hand tools ,Power generator Wheel barrow, Hammer
Tools and Equipment used Drill Lifting Activity: Boom Truck,
Mobile crane, Flat and Low / trailer and lifting gears
Installation and Dismantling Security fence Activity: Hand tools, Power Tools, Power generator, Hammer Drill,
Auger Machine Backfilling, Spoil Removal and Compaction Activities:
Hand tools, Wheel barrow, JCB Backhoe, Wheel Loader, Skid Loader, Dump Truck, Water Truck, Plate & Roller Compactor
References GI, RIM, PROCEDURE AND CSM :
SMS No. ARAMCO GI SA- CM, GI No. NOTE
SMS 6.01,6.02, 6.03, 6.05 (Hot work permit, G.I. 2.100 Work Permit Procedures CSM, Vol-II, Part-I, Chapter -1 Saudi Aramco Safety All employees involved in the activity shall
Cold work permit, Confined space entre G.1 6.030 Traffic and Vehicle Safety. Emergency Reporting and Response Hand Book be equiped with all mandatory and hazard
permit & Excavation Permit process) Gl.1781.001 Fire Protection and CSM Vol-II, Part-II, specific PPE's like hard hat,safety
Safety Equipment Inspections Chapter-I Excavation and Shoring shoes,safetyglass, gloves,FRC clothing, etc.
GI.6.012 Isolation, Lockout and use of Hold at all times. Other hazard specific PPE's
Tags shall be worn as per applicable.

SMS 6.12 Job Safety Analyses. Gl.1021.000 • Street and Road Closure: CSM, Vol-II, Part· I, Chapter-3
Excavation, Reinstatement and Traffic Personal Protective Equipment (PPE)
Controls.
GI. 1022.000 Road & Paved Surfaces CSM, vol-II, Part Ill -03 Electrical
Maintenance Services Equipment