2UEB000135 ACS2000 4kV Maintenance Schedule
2UEB000135 ACS2000 4kV Maintenance Schedule
Reproduction, use or disclosure to third parties without express authority is strictly forbidden. ABB Inc.
ACS2000 4 kV
Maintenance Schedule
1. Typical needed working time on the converter (does not include preparation, closing, waiting or traveling time).
2. The air filters can be replaced or cleaned. The action should be made based on the actual condition of the filter.
3. The cooling fans can be serviced by an authorized service representative or replaced.
4. The printed circuit boards in the converter and the spare ones can be replaced by new ones or by refurbished ones.
5. Converter improvements based on development, software modifications etc.
6. According to preventive maintenance manual
7. Only the printed circuit boards need to be replaced. For the other spare parts no actions are needed.
8. Spare printed circuit boards can be protected against aging by powering up the boards with an external voltage supply every 2
years.
Note! Recommended service intervals and component replacements are based on the ambient conditions specified by ABB.
Please refer to the service instructions and product manuals for more information.
No. of p.
Prep. Michael Basler 06/21/2011 Maintenance Schedule
Appr. Rick Hoadley 06/28/2011 ACS 2000 4 kV 1
Resp.
dept. MV Drives
Document number Lang. Rev. ind. Page