Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 50

In Partial Fulfillment of

The Requirements for the Course


Quantity Surveying - Drafting (CEQRSV1D)

Presented to the Faculty of the


College of Engineering
National University - Fairview

EIGHTH - STOREY DETAILED


QUANTITY ESTIMATION
OF PDIC RENOVATION

Section:
CE202
Group 3

Submitted by:
Lawrence Ivan Angeles
Christian Kyle Beltran
Jan Mikael Lintag
Joriz Malaluan
Bryon Harvey Salazaar

Submitted to:
Engr. Carl Edgar C. Ambray

Date Submitted:
March 2023
Table of Contents
Chapter 1. Project Background............................................................................................................................2

Project Building.................................................................................................................................................2

Objectives:..........................................................................................................................................................2

Chapter 2. Technical Specifications.....................................................................................................................2

Architectural specifications:.............................................................................................................................2

2.1.1 Floor finishes.........................................................................................................................................2

2.1.2 Wall Finishes.........................................................................................................................................3

2.1.3 Ceiling Finishes.....................................................................................................................................5

Structural specifications:..................................................................................................................................6

2.1 Reinforcing Steel Bars..............................................................................................................................6

2.2 Concrete....................................................................................................................................................6

2.3 Formworks................................................................................................................................................6

2.4 Structural Steel.........................................................................................................................................6

Chapter 3. Building Plans and Details.................................................................................................................7

Architectural Plans:..........................................................................................................................................7

Structural Plans:..............................................................................................................................................32

Chapter 4. Item Breakdowns, Computations, and Analysis............................................................................48

Chapter 5. Final Bill of Quantities......................................................................................................................66

CE202 – GROUP 3 – A.B.L.M.S.


Page |1
Chapter 1. Project Background

Project Building

This project is about the renovation of PDIC building in Chino Roces (Phase 3) at 2228
Chino Roces Avenue, Makati City. Our project is a 5-storey school with an estimated size of
4,990 sq.m. that located in Antipolo City.
The structural engineer of this project is Engineer Efren H. Sison and the architect is Cyrus
Victor S. Centeno. The total height of this project is 33.15 m, the length is 41 m, and the
width is approximately 121.96 m.
Each of the room is designed to have 20 – 30 person per room. This project also has a parking
lot for the staff and students of the said Insurance Corporation. Both Architectural and
Structural plans are detailed on this project and available in this project.

Objectives:

This project aims to estimate what will be the total cost of the building of said renovation
project of PDIC located at Antipolo City.
The estimation intends to:
 Use appropriate design standards and guidelines in designing architectural and
structural plans of the Renovation of PDIC Building in Chino Roces (Phase 3) at
Makati.
 Use of proper estimation by using a software tool, Microsoft Excel for faster
computation of the cost estimated of the said renovation project.

Chapter 2. Technical Specifications

Architectural specifications:

2.1.1 Floor finishes


Item Supplier Unit Cost
Rubberized Paint Boysen 1,011.75 Php/1 gal

Epoxy Coating Boysen 1,821 Php/4 L

CE202 – GROUP 3 – A.B.L.M.S.


Page |2
Carpet Davies’ 1,752 Php/4 L

60 cm x 60 cm Better Living Tile 239 Php/piece


Semi-Polished and Bath Center
Homogenous Tiles
(Class – A)

60 cm x 60 cm Citi Hardware 165 Php/piece


Matte Finish
Homogenous Tiles
(Class – B)

3 mm thick Alibaba 148.72 Php/piece


Homogenous Vinyl
Tiles (Armstrong or
Equivalent)

2.1.2 Wall Finishes


Item Supplier Unit Cost
Plain Cement Plaster Boysen 2,650 Php/16 L
Semi-Gloss Paint

Semi-Gloss Paint Boysen 2,800 Php/16 L

Plain Cement Plaster Rain or Shine 709 Php/4 L


Elastomeric Paint

Tile Brand/s and/or Supplier/s


Item Supplier Unit Cost
60 cm x 60 cm Better Living Tile 239 Php/piece
Semi-Polished and Bath Center

CE202 – GROUP 3 – A.B.L.M.S.


Page |3
Homogenous Tiles
(Class – A)

2-Face Gypsum The Project Estimate 98 Php/piece


Board on Metal Stud
with 50 mm
thickness, Rockwool
Insulation, 40 kg
Density Semi-Gloss
Latex

2-Face Gypsum The Project Estimate 98 Php/piece


Board on Metal Stud
with Semi-Gloss
Latex

9 mm Thick Alibaba 23,136.75 Php/10 pieces (1 set)


Tempered Clear
Glass on Powder
Coated Aluminum
Frame

Double Wall Shopee 405 Php/piece


Gypsum Board on
Metal Stud with 50
mm THK. Rockwool
Insulation, 40 kg
Density Semi-Gloss
Latex

1200 mm x 600 mm Guangdong Color 413 Php/piece


Homogenous Tiles Master Building
(Polished) Materials Co.,Ltd.

CE202 – GROUP 3 – A.B.L.M.S.


Page |4
300 mm x 600 mm Lazada 95 Php/piece
Ceramic Tiles

2.1.3 Ceiling Finishes


Item Supplier cost
600 mm x 600 mm x Ritemore 200 Php/piece
12 mm Thick
Acoustic Board on
Aluminum T-Runner

12 mm Thick Lazada 650 Php/piece


Painted Moisture
Resistance Gypsum
Board on Metal
Furring’s with Fire
Rated

Painted Cement Ramos’ Hardware 220 Php/sq.ft.


Under Slab
12 mm THK. RS Philippines 1,022.82 Php/piece
Painted Gypsum
Board on Metal
Furring’s with Fire
Rated

CE202 – GROUP 3 – A.B.L.M.S.


Page |5
Structural specifications:
2.1 Reinforcing Steel Bars

Item Supplier Unit Cost


Grade 40 stirrups Capitol Steel 10 Php/kg
Grade 60 main bars Capitol Steel 12.76 Php/kg

2.2 Concrete

Item Supplier Unit Cost


4,000 PSI Ramos’ Hardware 230 Php/bag

2.3 Formworks

Item Supplier Unit Cost


¾ thickness Ramos’ Hardware 750 Php/piece

2.4 Structural Steel

Item Supplier Unit Cost


A-36 Capitol Steel Php/kg

CE202 – GROUP 3 – A.B.L.M.S.


Page |6
Chapter 3. Building Plans and Details
Architectural Plans:

Ground Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


Page |7
Ground Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


Page |8
Second Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


Page |9
Second Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 10
Third Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 11
Third Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 12
Fourth Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 13
Fourth Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 14
Fifth to Seventh Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 15
Eighth to Roof Deck Floor Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 16
Front Elevation

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 17
Rear Elevation

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 18
Left Side Elevation

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 19
Left Side Elevation

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 20
Right Side Elevation

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 21
Right Side Elevation

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 22
Cross Sectional - A

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 23
Cross Sectional - A

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 24
Cross Sectional - B

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 25
Door – Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 26
Door – Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 27
Windows – Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 28
Windows – Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 29
Windows – Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 30
Windows – Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 31
Structural Plans:

Foundation Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 32
Second Floor Framing Plan
Foundation Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 33
Third Floor Framing Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 34
Fourth Floor Framing Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 35
Fifth Floor Framing Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 36
Roof Deck Framing Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 37
Roof Framing Plan

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 38
Foundation Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 39
Column Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 40
Column Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 41
Beam Schedule – Second Floor

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 42
Beam Schedule – Third Floor

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 43
Beam Schedule – Fourth Floor

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 44
Beam Schedule – Fifth Floor

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 45
Beam Schedule – Roof Deck

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 46
Slab Schedule

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 47
Chapter 4. Item Breakdowns, Computations, and Analysis

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 48
Chapter 5. Final Bill of Quantities

CE202 – GROUP 3 – A.B.L.M.S.


P a g e | 49