Professional Documents
Culture Documents
IH-10 at SH6 Pedestrian /bicyclist Improvements - Final Report
IH-10 at SH6 Pedestrian /bicyclist Improvements - Final Report
Houston, Texas
Septem ber 2 0 1 1
IH10 / SH 6
I EXISTING CONDITION
Houston, TX
IH10 / SH 6
I PRECEDENT IMAGES
Houston, TX
IH10 / SH 6
I CATALYST PLAN
Houston, TX
ENLARGEMENT A
ENLARGEMENT B
CONCRETE PAVERS CONCRETE SEAT WALL (2) 9 HIGH LIGHT COLUMN SHADE TREE
CONCRETE PAVERS CONCRETE SEAT WALL 12 HIGH TRELLIS (2) 9 HIGH LIGHT COLUMN SHADE TREE
IH10 / SH 6
I CATALYST ENLARGEMENT
Houston, TX
ENLARGEMENT D
ENLARGEMENT C
CONCRETE PAVERS CONCRETE SEAT WALL 12 HIGH TRELLIS (2) 9 HIGH LIGHT COLUMN SHADE TREE
12 HIGH TRELLIS CONCRETE SEAT WALL CONCRETE PAVERS SHADE TREE (2) 9 HIGH LIGHT COLUMN
IH10 / SH 6
I CATALYST ENLARGEMENT
Houston, TX
IH10 / SH 6
I MEDIAN ENLARGEMENT
Houston, TX
IH10 / SH 6
I VIEWS
Houston, TX
IH10 / SH 6
I VIEWS
Houston, TX
IH10 / SH 6
I VIEWS
Houston, TX
IH10 / SH 6
I TRELLIS CONCEPT
Houston, TX
CONCEPT ENLARGEMENT
DESCRIPTION IH 10 (TYPICAL CORNER INTERSECTION ) PAVING SEAT WALLS COLUMN LIGHTS - 9 HT POWER SERVICE FOR LIGHTING SOD IRRIGATION PLANT MATERIAL (45 GAL)(TREE) SUBTOTAL Contingency (25%) * TOTAL *Mobilization, General Conditions, & Builders Fee ** Design Fee & Survey Fee not Included 900 1 2.0 1 650 650 3 SF EA EA LS SF SF EA $12.00 $5,000.00 $4,500.00 $1,000.00 $0.50 $1.00 $500.00 $10,800.00 $5,000.00 $9,000.00 $1,000.00 $325.00 $650.00 $1,500.00 $28,275.00 $12,600.00 $40,875.00 QTY UNIT UNIT COST SUBTOTAL
IH 10 AT PARK 10 BLVD
$82,000.00 TOTAL COST (TWO CORNERS)
IH10
Houston, TX
IH 10 AT BARKER CYPRESS
$164,000.00 TOTAL COST (FOUR CORNERS)
IH 10 AT DAIRY ASHFORD
$164,000.00 TOTAL COST (FOUR CORNERS)
IH10
I INTERSECTIONS
Houston, TX
IH 10 AT ELDRIDGE PARKWAY
$122,700.00 (THREE CORNERS) $144,800.00 (ONE CORNERS) $265,500.00 TOTAL COST
IH 10 AT KIRKWOOD
$164,000.00 TOTAL COST (FOUR CORNERS)
IH10
I INTERSECTIONS
Houston, TX
DESCRIPTION IH 10 / SH 6 INTERSECTION (POCKET PARK) PAVING TRELLIS SEAT WALLS COLUMN LIGHTS - 9 HT POWER SERVICE FOR LIGHTING SOD IRRIGATION PLANT MATERIAL (45 GAL)(TREE) SUBTOTAL Contingency (25%) * TOTAL *Mobilization, General Conditions, & Builders Fee ** Design Fee & Survey Fee not Included
UNIT SF EA CY EA LS SF SF EA
UNIT COST $12.00 $35,000.00 $600.00 $4,500.00 $1,000.00 $0.50 $1.00 $500.00
SUBTOTAL $33,600.00 $35,000.00 $26,400.00 $9,000.00 $1,000.00 $600.00 $1,200.00 $3,500.00 $110,300.00 $34,500.00 $144,800.00
DESCRIPTION IH 10 / SH 6 INTERSECTION (TOTAL INTERSECTION) POCKET PARK TURN MEDIANS MEDIAN END GRAND TOTAL
QTY
UNIT
UNIT COST
SUBTOTAL
4 1 2
EA EA EA
DESCRIPTION IH 10 / SH 6 INTERSECTION (MEDIAN) SEAT WALLS COLUMN LIGHTS - 9 HT POWER SERVICE FOR LIGHTING SUBTOTAL Contingency (25%) * TOTAL *Mobilization, General Conditions, & Builders Fee ** Design Fee & Survey Fee not Included
QTY 16 16.0 1
UNIT EA EA LS
DESCRIPTION IH 10 / SH 6 INTERSECTION (MEDIAN END) SEAT WALLS COLUMN LIGHTS - 9 HT SCULPTURE BASE POWER SERVICE FOR LIGHTING SUBTOTAL Contingency (25%) * TOTAL *Mobilization, General Conditions, & Builders Fee ** Design Fee & Survey Fee not Included
QTY 2 2.0 1 1
UNIT EA EA EA LS
IH10 / SH 6
I COST ESTIMATE
Houston, TX