Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

RE-IMA GINE A IR CANADA P AR K

In Fall 2022, the City of Winnipeg, in collaboration with the Downtown


Winnipeg BIZ and Scatliff + Miller + Murray, engaged park users to gather
input about the future redevelopment of the park.

From the feedback gathered, the project team developed a set of


8 Community-Informed Design Directions:
Celebrate Indigenous culture
Add colour, art, and plant
through art, plants, language,
material to enliven the space.
Culture and ceremony. Beauty

Create comfortable and durable


Provide infrastructure and
seating with a variety of options
services that support a more
for people to visit and gather in
Cleanliness livable and cleaner park. Gathering small groups.

Consider safety for all current and


future park users in all elements: Consider a water feature to create a
open sight lines, improved circulation, playful and auditory experience.
Safety Water
and barrier-free design.

Accommodate an open space for


Create opportunities for play. large gatherings of 50 -75 people
for programming and performance
Play Events opportunities.
CONCEPT PLAN
SITE WILL BE CLOSED
FOR DEMOLITION +
T.
NS CONSTRUCTION
LTO
CAR
Late Summer -
Fall 2023

AIR
CA
N AD
A
PO
RT
AG
EA
VE
.

is tic A p p r o a
ol c

h
H
Programming
The stories of turtle
island have inspired the
design of the park. Social
Design
Supports
The creation of the
spaces evolves from the Operations +
turtle form. Indigenous N
APT Maintenance
teachings tell us that the
turtle represents truth.

Questions? Contact the project


team at (204) 927-3444

You might also like