Professional Documents
Culture Documents
Sample
Sample
I,NUP WILSON L DOCTORA, ADA-5 ,of the TSS-OMD of CIDG commit to deliver and agree to be rated on the attainment of the following targets in accordance with the indicated
measures for the period July 1, 2016 to December 30, 2016.
Ratee:
Date: Approved by: Date:
Wilson L. Doctora January 3, 2017______________ PCI JESUS S HULIGANGA___ January 3, 2017________
Print Name and Signature Rater/Immediate Supervisor
Legend:
Q – Quality
T: Timeliness
E – Efficiency
Notes/Legend:
1. Core functions should indicated outputs/activity prescribed in the individual plantilla positions.
2. Success indicators/Measures –quantifiable means of achieving one’s activity.
3. Actual accomplishments relate to the set targets in every activity; may be defined numerically or qualitatively
4. Rating should indicate the overall rating (using the scale below) of the immediate supervisor taking into consideration;
Quality (Q) – whether the individual is doing the right things based on his mandated tasks/expectations/requirements of the client
Efficiency (E) – whether the individual is doing the things/mandated tasks/expectations right
Timeliness (T) – whether the deliverable was done on time based on the requirements of the law and/or clients/stakeholders.
QUANTITY OF WORK % EFFICIENCY TIMELINESS OF WORK
4.50-5.00 –ALWAYS performs each work exceptionally accurate, no
4.50-5.00 Exceed Output by 30% 4.50-5.00 – Always ahead of schedule
wastage, work is met & complete in all detail, no errors committed
3.50-4.49 –ALMOST always performs each work accurately, wastage is
3.50-4.49 Exceed Output by 15 to 29% 3.50-4.49 –Almost always ahead of schedule
minimum, work is neat and complete in all details, with minimum errors
2.50-3.49 - Performs each work in the correct manner with occasional 2.50-3.49 -Meet the schedule occasionally (2
2.50-3.49 Met target by up to 100 to 114% wastage in some aspects, work is neat but frequently commit errors days delay)
1.50-2.49 –Performs each work in the correct manner and wastage occur in 1.50-2.49– Meet the schedule often late (3 to 5
1.50-2.49 Met target 51-99% all aspects, work is untidy and repeatedly commit errors days delay)
1.00-1.49 – Never meets the schedule always
1.00-1.49 Met target 50% and below 1.00-1.49 – Performs each work in an untidy and erroneous manner,.
late.