GENERAL PLUMBING NOTES:

1. ALL PLUMBING WORKS HEREIN SHALL BE EXECUTED IN ACCORDANCE WITH THE


REQUIREMENTS OF THE NATIONAL PLUMBING CODE AND THE RULES
AND REGULATIONS OF THE LOCAL MUNICIPAL/CITY ORDINANCE.
2. COORDINATE SANITARY AND WATER LAYOUT WITH OTHER RELATED
DRAWINGS
AND SPECIFICATIONS BEFORE PROCEEDING WITH THE WORK. THE ENGINEER
SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND THEREIN.
3. PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR
PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF
THE ENGINEER AND/OR OWNER CONCERNED.
4. SANITARY AND DRAINAGE LINES SHALL HAVE A MINIMUM SLOPE OF (1%).
5. ALL INDIVIDUAL BRANCHES SHALL BE VENTED UNLESS OTHERWISE NOTED.
6. DIMENSIONS ARE IN MILLII’4ETER (MPI) UNLESS OTHERWISE INDICATED.
7. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH
THE APPROVED PLANS.
8. ALL EXISTING UTILITIES AT SITE SHALL BE VERIFIED AND COORDINATE TI-JE
WORKS WITH SEWER EFFLUENT DISPOSAL AND WATERLINE SERVICES
CONNECTING POINT.
9. THE WORK THROUGHOUT SHALL BE EXECUTED IN THE BEST AND MOST
THOROUGH MANNER KNOWN TO SATISFACTION OF THE ENGINEER.
10. PIPES FOR ALL WATER LINES SHALL BE AS OF THE BRAND APPROVED BY
THE ENGINEER AND/OR OWNER CONCERNED AND SHALL BE TESTED AT 150PSI
FOR A PERIOD OF TWO (2) HOURS BEFORE BACKFILLING OR COVERING.
11. PIPES FOR SANITARY LINES SHALL BE "PVC" PIPES SERIES 1000 (HIGH
INPACT). HOWEVER, USED SERIES 800/600 IF SERIES 1000 ARE NOT
AVAILABLE.
12. PIPES FOR AIR VENTILATION LINES SHALL BE "PVC" PIPES SERIES 600. AIR
VENTILATION LINES SHALL BE ROUGHING-IN INSIDE THE "CHB" WALL AND
GOES ABOVE THE REST ROON CEILING TOWARD THE CENTER OF THE STEEL
LOUVER, WITH COWL AT THE END.
f3. GRADES OF HORIZONTAL PIPING :
RUN ALL HORIZONTAL PIPINGS TN PERFECT ALIGNMENT AND AT A FORPI GRADE
OF NOT LESS THAN 2%.
14. CHANGE IN DIRECTION:
ALL CHANGE IN DIRECTION SHALL BE MADE BY THE
APPROPRIATE USE OF 450 WYES, LONG SWEEP QUARTER BEND, SIXTH HEIGHT OR
SIXTEENTH BENDS. WHEN THE CHANGE OF FLOW IS FROPI HORIZONTAL TO
VERTICAL, A SINGLE *t BEND COMBINATION I'4AYBE USED ON VERTICAL STACKs
AND SHORT QUARTER BEND MAYBE USED ON WASTE LINE, TEE AND CROSSES
MAYBE USED IN VENT PIPES.
5. PROHIBITED FITTINGS :
NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL
OR WASTE LINE, THE DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR
VENT PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED.
6. PIPE CLEAN OUT:
CLEAN OUTS ARE REQU1RED FORTHE FOLLOW1NG CONDITION EVERYCHANGE
IN
HORIZONTAL DIRECTION TWENTY TWO AND ONE HALF DEGREES [22 $]
A. ONE AND HALF METER (1.SN) INSIDE THE
PROPERTY LINE BEFORE
B. EVERY 15 m. IN HORIZONTAL RUN OF PIPES.
C. PIT THE END OF ANY HORIZONTAL PIPE LINE.