1. ALL PLUMBING WORKS HEREIN SHALL BE EXECUTED IN ACCORDANCE WITH THE
REQUIREMENTS OF THE NATIONAL PLUMBING CODE AND THE RULES AND REGULATIONS OF THE LOCAL MUNICIPAL/CITY ORDINANCE. 2. COORDINATE SANITARY AND WATER LAYOUT WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS BEFORE PROCEEDING WITH THE WORK. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCY FOUND THEREIN. 3. PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE ENGINEER AND/OR OWNER CONCERNED. 4. SANITARY AND DRAINAGE LINES SHALL HAVE A MINIMUM SLOPE OF (1%). 5. ALL INDIVIDUAL BRANCHES SHALL BE VENTED UNLESS OTHERWISE NOTED. 6. DIMENSIONS ARE IN MILLII’4ETER (MPI) UNLESS OTHERWISE INDICATED. 7. SIZES OF WATER SUPPLY PIPES TO FIXTURES SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS. 8. ALL EXISTING UTILITIES AT SITE SHALL BE VERIFIED AND COORDINATE TI-JE WORKS WITH SEWER EFFLUENT DISPOSAL AND WATERLINE SERVICES CONNECTING POINT. 9. THE WORK THROUGHOUT SHALL BE EXECUTED IN THE BEST AND MOST THOROUGH MANNER KNOWN TO SATISFACTION OF THE ENGINEER. 10. PIPES FOR ALL WATER LINES SHALL BE AS OF THE BRAND APPROVED BY THE ENGINEER AND/OR OWNER CONCERNED AND SHALL BE TESTED AT 150PSI FOR A PERIOD OF TWO (2) HOURS BEFORE BACKFILLING OR COVERING. 11. PIPES FOR SANITARY LINES SHALL BE "PVC" PIPES SERIES 1000 (HIGH INPACT). HOWEVER, USED SERIES 800/600 IF SERIES 1000 ARE NOT AVAILABLE. 12. PIPES FOR AIR VENTILATION LINES SHALL BE "PVC" PIPES SERIES 600. AIR VENTILATION LINES SHALL BE ROUGHING-IN INSIDE THE "CHB" WALL AND GOES ABOVE THE REST ROON CEILING TOWARD THE CENTER OF THE STEEL LOUVER, WITH COWL AT THE END. f3. GRADES OF HORIZONTAL PIPING : RUN ALL HORIZONTAL PIPINGS TN PERFECT ALIGNMENT AND AT A FORPI GRADE OF NOT LESS THAN 2%. 14. CHANGE IN DIRECTION: ALL CHANGE IN DIRECTION SHALL BE MADE BY THE APPROPRIATE USE OF 450 WYES, LONG SWEEP QUARTER BEND, SIXTH HEIGHT OR SIXTEENTH BENDS. WHEN THE CHANGE OF FLOW IS FROPI HORIZONTAL TO VERTICAL, A SINGLE *t BEND COMBINATION I'4AYBE USED ON VERTICAL STACKs AND SHORT QUARTER BEND MAYBE USED ON WASTE LINE, TEE AND CROSSES MAYBE USED IN VENT PIPES. 5. PROHIBITED FITTINGS : NO DOUBLE HUB OR TEE BRANCH SHALL BE USED ON HORIZONTAL SOIL OR WASTE LINE, THE DRILLINGS AND TAPPING OF HOUSE DRAIN, WASTE OR VENT PIPES AND USE OF SADDLE HUB AND BEND ARE PROHIBITED. 6. PIPE CLEAN OUT: CLEAN OUTS ARE REQU1RED FORTHE FOLLOW1NG CONDITION EVERYCHANGE IN HORIZONTAL DIRECTION TWENTY TWO AND ONE HALF DEGREES [22 $] A. ONE AND HALF METER (1.SN) INSIDE THE PROPERTY LINE BEFORE B. EVERY 15 m. IN HORIZONTAL RUN OF PIPES. C. PIT THE END OF ANY HORIZONTAL PIPE LINE.