TRAINER’S METHODOLOGY LEVEL 1 (TM1) TESDA RTC 10

TRAINING PLAN

Qualification: COMPUTER SYSTEMS SERVICING (NC II)

Trainees’ Facilities/
Training Mode of Assessment Date and
Training Staff Tools and Venue
Activity/Task Training Method Time
Requirements Equipment
Hand Tools: July 22-23,
1. Install and 1.1. Assemble Jovenal 2023
computer Learnership 1. Protectiv
configure Malonh
hardware program e eyewear
computer ao ▪ Direct 8:00 – 12:00
2. Digital
systems observation 1:00 – 5:00
multi-
of July 24-25,
1.2. Prepare Jovenal meter
Learnership application 2023
installer Malonh 3. Wire Iligan
program to tasks. 8:00 – 12:00
ao stripper Comp ▪ Questions 1:00 – 5:00
with bolt uter
1.3. Install cutter related to July 26-27,
operating Instit underpinni 2023
Jovenal 4. Pliers(ass ute-
system and Learnership orted) ng
drivers for program Malonh (ICI) knowledge 8:00 – 12:00
ao 5. Screw
peripherals/dev drivers ▪ Demonstrati 1:00 – 5:00
ices (assorted on
) ▪ Written test
1.4. Install July 27,
Jovenal 6. Soldering
application Learnership 2023
Malonh iron
software program 8:00 – 12:00
ao
1:00 – 5:00

Date Developed: Date Revised:


CBLMs on Computer Issued by:
May 27,2023
Systems Servicing NC II
Developed by:
MSU-Iligan Institute of Technology
Install and configure computer
systems GLAY VHINCENT SUMAYLO Revision #
TRAINER’S METHODOLOGY LEVEL 1 (TM1) TESDA RTC 10

1.5. Conduct testing 7. Desolderi July 28-29,


Jovenal
and Learnership ng tool 2023
Malonh
documentation program ao
8. Allen 8:00 – 12:00
wrench 1:00 – 5:00
(0.05-
0.25
9. Flashligh
t
10. IC
insertion
/extracti
on tool
11. Mirror
12. RS
232 pin
13. Sharp
pointed
tweezers
14. Antist
atic wrist
wrap
15. Lan
Tester
16. Crimp
ing tools

Date Developed: Date Revised:


CBLMs on Computer Issued by:
May 27,2023
Systems Servicing NC II
Developed by:
MSU-Iligan Institute of Technology
Install and configure computer
systems GLAY VHINCENT SUMAYLO Revision #
TRAINER’S METHODOLOGY LEVEL 1 (TM1) TESDA RTC 10

Hand Tools: August 1,


2.1. Install Learnership Aljade 1. Protectiv 2023
2. Set-up network cables program Capa e eyewear 8:00 – 12:00
computer 2. Digital 1:00 – 5:00
networks multi- August 2-3,
▪ Direct
2.2. Set network Learnership Aljade meter 2023
observation
configuration program Capa 3. Wire 8:00 – 12:00
of
stripper 1:00 – 5:00
application
2.3. Set router/Wi- with bolt Iligan to tasks. August 4-5,
Fi/ wireless cutter Comp
Learnership Aljade ▪ Questions 2023
access 4. Pliers uter
program Capa related to 8:00 – 12:00
point/repeater (assorted Instit underpinni 1:00 – 5:00
configuration ) ute ng
5. Screw (ICI) knowledge
driver
▪ Demonstrati
2.4. Inspect and (assorted
on August 6,
test the )
Learnership Aljade ▪ Written test 2023
configured 6. Lan
program Capa Tester 8:00 – 12:00
computer
7. Crimping 1:00 – 5:00
networks
Tools

________________________________ _________________________________
Trainer Trainee

Date Developed: Date Revised:


CBLMs on Computer Issued by:
May 27,2023
Systems Servicing NC II
Developed by:
MSU-Iligan Institute of Technology
Install and configure computer
systems GLAY VHINCENT SUMAYLO Revision #

You might also like