Daily Report Dry Dock 055705

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 9

ADNOC Classification: Internal #

ADNOC 227 DRY DOCK

Deck SOW
carpenter
1 ECR: to manufacture cabinet for Folders (drawings, manuals).
2 CE Cabin: small table is to be repaired (crushed during rolling).
3 Workshop table is to be reinforced with steel plates (wises are not able to maintain applied forces).
4 Locks under the bed drawer and cabinets.
5 Fabricate Table on the bridge for inspectors and paperwork
7 fabricate desk on bridge for computer work.
8 Fabricate service doors for bridge AC maintenance
9 maintenance and adjust for doors self-closing devices.
10 install missing locks for cabins lockers & drawers
11 fabricate and install new stainless boxes on deck for elect plugs instead of damaged boxes
12 install new hinges for damage control box & SOPEP box .
13 hange internal steel plate with the gasket on (B) DECK Accommodation ( fwd. & aft ) entrance .
14 Need to change internal steel plate with the gasket on ( A )DECK Accommodation
15 need to change side gasket funnel trunk Door on ( A) DECK .
16 need to change side gasket co2 room on ( A) DECK
17 carpenter to work in team for install smoke detectors . (open and close ceiling covers for wiring )
18 carpenter to work in team for wiring for Dp upgrade . (open and close ceiling covers for wiring )
19 fabricate & install name plate for all anntenna
20 install galley drawer lock
21 fixing galley lockers
22 fabricate 1 step on B deck to forcastle
23 fabricate garbage bins cover
24 change deck wooden plate
25
Service Engineer attendance
1 kongsberg install 2 MRU
2 kongsberg install SPOT TRACK & RADIUS
3 Zener tech for upgrading & maintanance radar & ECDIS
4 MASTER SYSTEM FIRE SENSORS
5 MASTER SYSTEM anntena insp
6 MASTER SYSTEM FIRE VDR
7 MASTER SYSTEM GYRO SERVICE
piping
1 Deck crash rail pipe installation on port & stbd side
2 Drip tray drain line renewal on main deck and pipe supports renewal
3 Crash rail pipe C clamp support & Fire line support to be pack with teflon sheet
4 Deck wash line High pressure valves installation
5
6
7
ADNOC Classification: Internal #

8
9
10
Cleaning
1 CARGO TANK NO 5 PORT
2 CARGO TANK NO 5 ST-BD
3 CARGO TANK NO 5A PORT
4 CARGO TANK NO 5 ST-BD
5 CARGO TANK NO 6 PORT
6 CARGO TANK NO 6 ST-BD
7 F.WATER TANK NO 2 PORT
8 F.WATER TANK NO 2 ST-BD
9 F.WATER TANK NO 3 PORT
10 F.WATER TANK NO 3 ST-BD
11 chain locker port
12 chain locker port
Steel work
1 guard with chanin in monkey island
2 guard with chanin in A DECK ENGINE ROOM escape hatch
3 free 20 nos (D) ring on deck
4 welding 2 steps for stern navigation light
5 remove oxy-astyline old line
6 repair steel locker in B DECK
7 install stell plate for ch,store with 2 air vent
8 Remove fenders P & st-bd side (30 nos)
9 Disconnected & removing Anchor chain P/S & St-bd/S
10 cutting 8 meter gangway
11 Sea Chest Grating Modficaiton,
12 Bottom Plugs
13 Ships Name removal_ Fwd port stbd and Aft area.
14 Vent Head Bolts Renewal (Ballast and Fresh water tanks)
15 Bow Thruster Hatch Modification
16 Addn'L Ramp Fabrication Iwo Rescue Zone Entrance Port & Stbd
17 Assistance To Konsberg , Supports for Radius unit at Wheelhouse Top
18 Capstans Control Handles Foundation To Remove Both Sides
19 Rescue Zone Door P&S Fasteners Renewal
20 New Drip Tray Fabrication and Installation for Filling line iwo Bridge Deck (P) near Funnel Trunk
21 Monkey Island Antenna (P) Bracing Bolts Steel Washers Renewal
22 Fire sensor supports fabrication and installation at various locations_Assistance to Electrical subcon
23 Anchor Fluke Free Up - Port/Stbd
24 Vacuum Test After Echo Sounder Installation.
25 Deck wood Retainer Bar Remove/Refit for wood removal
26 Hatch cutting for bow thruster motor no: 5 Removal & Overhauling
27 Manhole Opening And Closing
28
29
30
31
ADNOC Classification: Internal #

32
33
34
35
ADNOC Classification: Internal #

DRY DOCK

Progress
Planned

SOW
carpenter
100%
100%
not able to maintain applied forces). 100%
100%
100%
100%
100%
100%
100%
instead of damaged boxes 100%
100%
modation ( fwd. & aft ) entrance . 100%
CK Accommodation 100%
100%
100%
d close ceiling covers for wiring ) ass team
close ceiling covers for wiring ) ass team
100%
100%
100%
100%
100%
100%

eer attendance
100%
100%
100%
100%
100%
100%
100%
ping 100%
100%
ewal 100%
with teflon sheet 100%
100%
100%
100%
100%
ADNOC Classification: Internal #

100%
100%
100%
aning
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
Steel work
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
bd 100%
use Top 100%
100%
100%
dge Deck (P) near Funnel Trunk 100%
wal 100%
ions_Assistance to Electrical subcon Master system 100%
100%
100%
100%
ng
ADNOC Classification: Internal #
ADNOC Classification: Internal #

Progress
Actual

100%
100%
0%
0%
100%
100%
100%
0%
0%
50%
0%
90%
90%
0%
0%
as req
as req
70%
0%
0%
100%
0%
20%

100%
100%
100%
80%
100%
100%
100%

60%
80%
10%
0%
100%
100%
100%
ADNOC Classification: Internal #

100%
100%
100%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
0%
100%
100%
0%
50%
90%
100%
100%
50%
100%
100%
100%
30%
60%
100%
100%
20%
10%
10%
5%
50%
80%
100%
100%
ADNOC Classification: Internal #

You might also like