Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

DPP C2

Kolej Kemahiran Tinggi MARA


Sri Gading, Johor Darul Takzim

ASSIGNMENT SHEET

PROGRAMME

SESSION JULY–- DECEMBER 2022 SEMESTER 2


DCV 21213 BUILDING
CODE / SUBJECT SHEET NO 1
INFORMATION MODELLING
LECTURER DURATION 3 HOURS

TOPIC 1.0 INTRODUCTION TO BIM

1.1 What is BIM/ tools


1.2 Overview-Malaysia / other countries.
1.3 Maturity
SUB-TOPIC
1.4 Project life cycle
1.5 Collaboration
1.6 Stakeholders

After completing the unit, students should be able to:


TOPIC LEARNING 1. Explain the overview of BIM. (C2)
OUTCOMES 2. Discuss the different of BIM maturity level. (C2)
3. Explain the process of BIM throughout building lifecycle. (C2)
DPP C2

TOOLS /
Jurnals Technical
EQUIPMENTS /
Paper
MATERIALS
DRAWING AND
-
DATA
In a group of maximum 4 - 5 persons, please write a technical paper about
BIM in Malaysia. You will be given 5 journals to be referred and you can refer
to other journals as additional references to your technical paper.

FORMAT OF WRITING:

Title: BIM In Malaysia

Chapter:

Abstract
Abstract is a summary of the entire writing.

1.0 Introduction
An introduction contains a summary of each topic in the study.

2.0 BIM
Write about definition of BIM in a few references.

3.0 BIM Benefits


Explain the benefits of BIM to construction industry in Malaysia.
INSTRUCTION
4.0 BIM Implementation/Adoption
Explain the rate or current BIM implementation/adoption to
construction industry in Malaysia.

5.0 BIM Challenges/Barriers


Explain the challenges or barrier in adopting BIM to construction
industry in Malaysia.

6.0 Conclusion
Conclude your writing.

7.0 References - APA Format

Write your answer and submit as below.


i. NO copying/plagiarism. Use your own words. Cited where
relevant.
ii. Submit your work in form of hardcopy and softcopy.
iii. Please submit in the BOX and don’t forget to back up your work in
email.

You might also like