NCR 1255
NCR 1255
Submission of Compliance
Closing of NCR
Sr. No Close-Out Remarks Re-Inspection Date
3840 0000-00-00
Status Comments
Document Attachment
id Name Date Description Type
3414 Installation of Permanent 2023-04-23 1. It has been observed pdf
rings number-13 to 27 in that the non-
Kaveri TBM greenways conformances of
Composite gasket
damage and / or
dislocation in the corner
position during the next
shove.
NON-CONFORMANCE REPORT
2. Tunnel permanent rings must be watertight, owing to the gasket damage which could leads ingress of
water inside the tunnel.
3. Contractor needs to submit proposals for remedial or other measures to correct the defect or
negate its effects as appropriate. Also, shall undertake precautionary measures to avoid the gasket
damage for achieve the required water tightness and design life as stipulated in Contract.
PR-13,S5 gasket edge mismatch PR-14,S6 gasket edge mismatch PR-15,S1 and S4 gasket edge
ring joint location. ring joint location. mismatch ring joint location.
PR-17,S1 and S6 gasket edge PR-18 S2 gasket edge mismatch PR-22,S1 gasket edge
mismatch ring joint location. ring joint location. mismatch ring joint location.
PR-23, S4 and S5 gasket edge PR-24 ,S2 and S6 gasket edge PR-26, S6 Segment gasket
mismatch ring joint location. mismatch ring joint location. mismatch at the ring joint
Rings summary:
Permanent rings:
PR13,14,15,17,18, 22,
23,24, 26, and 27.
Proposed Corrective
Action(s)
Remarks:
Engineer’s
Originator’s Name Signature Date
Organization Name
Submission of Compliance
Correction & Corrective Action:
Re-Inspection date
Engineer’s Organization
Originator’s Name Signature Date
Name
Annexures: Documentary evidence such as Photographs, revised drawings etc.,