VRW & VBR (PLANT,MACHINERY & SPARES)= AMOUNT TO BE ADDED OR DEDUCTED IPC NO. 02

DONE FOR THE

SCHEDULE H(1)
RW/BR =VALUE

PPM & S % OF

SCOMPONENT
COMPLETION
OF A STAGE

ROAD WORK
FOLLOWING
RESPECTIVE

UNDER THE

(2) OTHER
ITEMS OF
OF WORK
MONTH

WORKS
SR ((A1-

PM &
BILL NO DATE DISCRIPTION A0 AI VRW & VBR (PM&S) REMARKS
NO A0)/A0)

(a) (b) (c) (d) (e) (f) (g) (h) (j) (l) (m) (n)
- 15 76.6 79.40 0.037 - EW/GSB/ Other works

VRW & VBR (PM&S ) = AMOUNT TO - 15 76.6 79.40 0.037 - Bituminous Work
BE ADDED OR DEDUCTED FROM IPC - 15 76.6 79.40 0.037 - Cement Concrete Pavement
1 IPC-1 30-06-2022 Feb-22
DUE TO CHANGE IN COST OF PLANT
Culvert, Minor Bridges And Other
MACHINERY & SPARES - 15 76.6 79.40 0.037 -
Structure
56,59,85,339.00 15 76.6 79.40 0.037 26,70,035.84 Major Bridge And Structures

- 15 76.6 80.50 0.051 - EW/GSB/ Other works

VRW & VBR (PM&S ) = AMOUNT TO - 15 76.6 80.50 0.051 - Bituminous Work
BE ADDED OR DEDUCTED FROM IPC - 15 76.6 80.50 0.051 - Cement Concrete Pavement
2 IPC-2 31-08-2022 Apr-22
DUE TO CHANGE IN COST OF PLANT
Culvert, Minor Bridges And Other
MACHINERY & SPARES 92,36,972.00 15 76.6 80.50 0.051 60,063.41
Structure
19,56,04,115.00 15 76.6 80.50 0.051 12,71,915.76 Major Bridge And Structures