VRW & VBR (STEEL)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO. 02

COMPLETION OF
A STAGE UNDER
OF WORK DONE

ROAD WORK (2)


SCHEDULE H(1)
RW/BR =VALUE

PL % OF STEEL
OTHER WORKS

COMPONENT
FOLLOWING
RESPECTIVE

ITEMS OF
FOR THE
MONTH
SR (S1-

THE
BILL NO DATE DISCRIPTION SO S1 VRW & VBR (STEEL) REMARKS
NO SO)/S0)

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l)

- 0 131.4 144.80 0.102 - EW/GSB/ Other works

VRW & VBR (STEEL ) = - 0 131.4 144.80 0.102 - Bituminous Work


AMOUNT TO BE ADDED OR
1 IPC-1 30-06-2022 Feb-22 - 0 131.4 144.80 0.102 - Concrete Cement Pavement
DEDUCTED FROM IPC DUE TO
Culvert, Minor Bridges And Other
CHANGE IN COST OF STEEL - 15 131.4 144.80 0.102 -
Structure
56,59,85,339.00 20 131.4 144.80 0.102 98,14,185.78 Major Bridge And Structures

- 0 131.4 158.60 0.207 - EW/GSB/ Other works

VRW & VBR (STEEL ) = - 0 131.4 158.60 0.207 - Bituminous Work


AMOUNT TO BE ADDED OR
2 IPC-2 31-08-2022 Apr-22 - 0 131.4 158.60 0.207 - Concrete Cement Pavement
DEDUCTED FROM IPC DUE TO
Culvert, Minor Bridges And Other
CHANGE IN COST OF STEEL 92,36,972.00 15 131.4 158.60 0.207 2,43,786.78
Structure
19,56,04,115.00 20 131.4 158.60 0.207 68,83,308.81 Major Bridge And Structures

Page 1 of 1