Escalation
Escalation
Name Of Work : Construction of Six Lane Link Road (NH-166S) with Paved Shoulder configuration to Mopa Airport in the state of Goa on EPC Mode
Name Of Client : Chief Engineer (NH)Government of Goa on behalf of Ministry of Road Transport & Highways (MoRT & H)
Name Of Auth. Engineer : M/s TPF Engineering Private Limited
Name Of Contractor : M/s Ashoka Buildcon Limited
ESCALATION SUMMARY
WORK DONE FOR THE COMPLETION OF A STAGE UNDER
DATES
THE FOLLOWING ITEMS OF SCHEDULE-H
RA Bill 3 MONTHS WORK DONE
IPC NO BASE DATE Culverts, Minor REMARKS
DATE PRIOR TO AMOUNT Earthwork, Granular Cement Concrete Major Bridges and
IPC BILL Bituminous Work Bridges and other
Work and Other Works Pavement Structures
Structures
1 W.E.F Interchange Foundations,Viaduct foundations
Jun-22 Feb-22 56,59,85,339.00 - 56,59,85,339.00
31-07-2021 & Girders casting
Interchange Foundations &
2 W.E.F Substructures,Viaduct -1 & 2 foundations &
Aug-22 Apr-22 20,48,41,087.00 - 92,36,972.00 19,56,04,115.00
31-07-2021 Girders/Segment casting,Box culverts,ROB
fabrication
TOTAL = 77,08,26,426 - - - - 76,15,89,454.00
Team Leader
Project Head Authority Engineer Assistant Engineer VII
M/s Ashoka Buildcon Limited M/s TPF Engineering Private Limited National Highway Sub-Div II.
EPC Contractor
Page 1 of 1
VRW & VBR (LABOUR)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO.02
RW/BR =VALUE OF
THE COMPLETION
WORK DONE FOR
PL % OF LABOUR
ROAD WORK (2)
SCHEDULE H(1)
OTHER WORKS
COMPONENT
OF A STAGE
FOLLOWING
RESPECTIVE
UNDER THE
ITEMS OF
MONTH
SR
BILL NO DATE DISCRIPTION L0 L1 (L1-L0)/L0 VRW & VBR (LABOUR) REMARKS
NO
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l)
- 20 121.1 122.20 0.009 - EW/GSB/ Other works.
V1= VRW & VBR (LABOUR) = - 20 121.1 122.20 0.009 - Bituminous Work.
AMOUNT TO BE ADDED OR - 20 121.1 122.20 0.009 - Cement Concrete Pavement.
1 IPC-1 30-06-2022 Feb-22
DEDUCTED FROM IPC DUE TO
- 15 121.1 122.20 0.009 - Culvert, Minor Bridges And Other Structure.
CHANGE IN COST OF LABOUR
V1= VRW & VBR (LABOUR) = - 20 121.1 125.10 0.033 - Bituminous Work.
AMOUNT TO BE ADDED OR - 20 121.1 125.10 0.033 - Cement Concrete Pavement.
1 IPC-2 31-08-2022 Apr-22
DEDUCTED FROM IPC DUE TO
92,36,972.00 15 121.1 125.10 0.033 38,864.56 Culvert, Minor Bridges And Other Structure.
CHANGE IN COST OF LABOUR
Page 1 of 1
Page 1
VRW & VBR (CEMENT)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO. 02
RW/BR =VALUE OF
THE COMPLETION
WORK DONE FOR
PL % OF CEMENT
ROAD WORK (2)
SCHEDULE H(1)
OTHER WORKS
COMPONENT
OF A STAGE
FOLLOWING
RESPECTIVE
UNDER THE
ITEMS OF
MONTH
Sr.
BILL NO DATE DISCRIPTION C0 C1 (C1-C0)/C0 VRW & VBR (CEMENT) REMARKS
No.
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l)
- 5 124.7 127.90 0.026 - EW/GSB/ Other works
Page 1 of 1
Page 1
VRW & VBR (STEEL)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO. 02
COMPLETION OF
A STAGE UNDER
OF WORK DONE
PL % OF STEEL
OTHER WORKS
COMPONENT
FOLLOWING
RESPECTIVE
ITEMS OF
FOR THE
MONTH
SR (S1-
THE
BILL NO DATE DISCRIPTION SO S1 VRW & VBR (STEEL) REMARKS
NO SO)/S0)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l)
Page 1 of 1
Page 1
VRW & VBR (FUEL)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO. 02
COMPLETION
PF % OFFUEL
COMPONENT
WORK DONE
OF A STAGE
FOLLOWING
RESPECTIVE
UNDER THE
=VALUE OF
H(1) ROAD
SCHEDULE
ITEMS OF
WORK (2)
FOR THE
MONTH
WORKS
OTHER
RW/BR
SR (FI-
BILL NO DATE DISCRIPTION FO FI VRW & VBR (FUEL) REMARKS
NO FO)/FO)
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l)
Page 1 of 1
Page 1
VRW & VBR (OTHER MATERIALS)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO. 02
THE FOLLOWING
COMPLETION OF
A STAGE UNDER
OF WORK DONE
OTHER WORKS
COMPONENT
PL % OF OM
RESPECTIVE
ITEMS OF
FOR THE
MONTH
SR (M1-
BILL NO DATE DISCRIPTION MO M1 VRW & VBR (OM) REMARKS
NO MO)/M0)
(a) (b) (c) (d) (e) (f) (g) (h) (j) (l) (m) (n)
- 50 135.0 145.30 0.076 - EW/GSB/ Other works
VRW & VBR (OM ) = AMOUNT TO BE - 40 135.0 145.30 0.076 - Bituminous Work
ADDED OR DEDUCTED FROM IPC DUE - 35 135.0 145.30 0.076 - Cement Concrete Pavement
1 IPC-1 30-06-2022 Feb-22
TO CHANGE IN COST OF OTHER
Culvert, Minor Bridges And Other
MATERIALS - 30 135.0 145.30 0.076 -
Structure
56,59,85,339.00 25 135.0 145.30 0.076 91,40,663.22 Major Bridge And Structures
VRW & VBR (OM ) = AMOUNT TO BE - 40 135.0 151.90 0.125 - Bituminous Work
ADDED OR DEDUCTED FROM IPC DUE - 35 135.0 151.90 0.125 - Cement Concrete Pavement
2 IPC-2 31-08-2022 Apr-22
TO CHANGE IN COST OF OTHER
Culvert, Minor Bridges And Other
MATERIALS 92,36,972.00 30 135.0 151.90 0.125 2,94,428.48
Structure
19,56,04,115.00 25 135.0 151.90 0.125 51,95,734.30 Major Bridge And Structures
Page 1 of 1
Page 1
VRW & VBR (PLANT,MACHINERY & SPARES)= AMOUNT TO BE ADDED OR DEDUCTED IPC NO. 02
SCHEDULE H(1)
RW/BR =VALUE
PPM & S % OF
SCOMPONENT
COMPLETION
OF A STAGE
ROAD WORK
FOLLOWING
RESPECTIVE
UNDER THE
(2) OTHER
ITEMS OF
OF WORK
MONTH
WORKS
SR ((A1-
PM &
BILL NO DATE DISCRIPTION A0 AI VRW & VBR (PM&S) REMARKS
NO A0)/A0)
(a) (b) (c) (d) (e) (f) (g) (h) (j) (l) (m) (n)
- 15 76.6 79.40 0.037 - EW/GSB/ Other works
VRW & VBR (PM&S ) = AMOUNT TO - 15 76.6 79.40 0.037 - Bituminous Work
BE ADDED OR DEDUCTED FROM IPC - 15 76.6 79.40 0.037 - Cement Concrete Pavement
1 IPC-1 30-06-2022 Feb-22
DUE TO CHANGE IN COST OF PLANT
Culvert, Minor Bridges And Other
MACHINERY & SPARES - 15 76.6 79.40 0.037 -
Structure
56,59,85,339.00 15 76.6 79.40 0.037 26,70,035.84 Major Bridge And Structures
VRW & VBR (PM&S ) = AMOUNT TO - 15 76.6 80.50 0.051 - Bituminous Work
BE ADDED OR DEDUCTED FROM IPC - 15 76.6 80.50 0.051 - Cement Concrete Pavement
2 IPC-2 31-08-2022 Apr-22
DUE TO CHANGE IN COST OF PLANT
Culvert, Minor Bridges And Other
MACHINERY & SPARES 92,36,972.00 15 76.6 80.50 0.051 60,063.41
Structure
19,56,04,115.00 15 76.6 80.50 0.051 12,71,915.76 Major Bridge And Structures
Page 1 of 1