Audit Planning
Working in your assigned breakout room, you are required to plan a third-party initial audit of CZERKA Ltd.
Plan and conduct a Stage I Initial Audit to CZERKA Ltd. in order to prepare and plan the stage 2 of the
initial audit. You have to prepare a stage 1 plan and a short report (1 page), which contains the main
information you plan to collect and verify at stage 1 and which you will use in the audit planning stage 2
(review your work from the case study on desktop audit to get some clues).
Make sure you collect and record information and/ or allocate time for stage 2 to cover the following
aspects of the QMS: Context, Risk and Opportunities, Quality objectives, Responsibilities and authorities,
Resources, Product realization processes, monitoring and measurement requirements, Control of any
externally provided processes, products and services, improvement
Follow the guidance of ISO 19011, ISO 17021 and the relevant sections of the Delegates Manual, and IAF
MD5.
Please consult IAF Mandatory Document IAF MD 5:2009 for more details on proper planning
Session 1 - AUDIT PLAN stage 1
TECHNICAL/LEGAL EXPERT:
AUDITED SCOPE:
TECHNICAL/LEGAL EXPERT: