SPML MBMC Hyd Calculations Zone1 r0
SPML MBMC Hyd Calculations Zone1 r0
CALCULATIONS - ZONE-1,
14 MLD STP,PHASE-I
Contractor
THERMAX LTD
Water & Waste solutions
Pune
3 TUBE SETTLER
4 FLOCULATION TANK
5 FLASH MIXER
DOC. No. ISSUED FOR REV NO. DATE PREPARED CHECKED APPROVED
6.6 Max. Sewage Level in Upstream of MBBR Level Controlling Weir 4.750
7 MBBR - 2
7.1 Provision of Losses Through Bottom Screens & Pipe from Bottom duct to O/L Box 0.050
8 MBBR 1
8.2 Provision of Losses Through Bottom Screens & Pipe from Bottom duct to O/L Channel 0.050
9.3 Max. Sewage Level in channel after grit seperator to MBBR 5.300
9.4 Free fall from grit seperator outlet wall to common channel 0.050
10.5 Max. Sewage Level of Bar-Screen channel Upstream / Stilling Chamber 5.875
11 STILLING CHAMBER
9.72 m3/min.
21.88 m3/min. =
2 MAIN LAUNDER (CHANNEL TO CCT)
Frictional Losses
3
Qpeak = 0.365 m /sec.
Size of Channel = 0.800 m ,Width
SWD = 0.400 m
R = A/P = 0.200
⅔
R = 0.342
N 0.014
⅔ ² = 0.002
S= ( V X N) / R
Estimated Max. length of Channel = 15.00 m
No. of bends 1
3 TUBE SETTLER
3.090
Qpeak /Tube Settler = 1313 m3/hr.
No of troughs / Tube Settler = 16
Q/ Trough = 82.03 m3/hr.
DOC. No. ISSUED FOR REV NO. DATE PREPARED CHECKED APPROVED
= 0.275 Height
No of V notches = 48 nos/TROUGH
120mm
80mm 3.960
60 mm
40mm
Q 82.03 m3/hr.
0.0228 m3/sec. 0.275
4 FLOCCULATION TANK
b = 1.6 m width
Q = 1.84 bh3/2
2/3
h = {Q/(1.84 x b)} 0.248 m
DOC. No. ISSUED FOR REV NO. DATE PREPARED CHECKED APPROVED
0.500 m SWD
R = A/P = 0.188
⅔
R = 0.327
N 0.014
⅔ ² = 0.003
S= ( V X N) / R
Estimated Max. length of Channel = 11.6 m
Losses = 0.03132 m
b Entry loss
No. of bends 1
DOC. No. ISSUED FOR REV NO. DATE PREPARED CHECKED APPROVED
2
Loss , H =2 X 1/2 V /2g = 0.038 m
losses 0.019 m
Q = 0.365 m3/sec.
Q = 1.84 bh3/2
2/3
h = {Q/(1.84 x b)} = 0.105166765 METER
0.800 m,Height
0.700 m SWD
DOC. No. ISSUED FOR REV NO. DATE PREPARED CHECKED APPROVED
R = A/P = 0.384
R⅔ = 0.528
N 0.014
⅔ ²
S= ( V X N) / R = 0.0001 negligible
No. of screens = 1
DOC. No. ISSUED FOR REV NO. DATE PREPARED CHECKED APPROVED
No. of screens = 1
For 50% clogged condition .the head loss through Manaul Screen is higher i.e. 257mm
PROVISION OF HEAD LOSS MADE FOR 0.300 meter………………Sr. No.10.3