1
LOW POINT MANIFOLD Liti
L SPA 01
P°8 0ti Y 19D
HIGH POINT MANIFOLD . 5UPPL
I/2
5
4 rt.-,
3 rt.' I 4
2 re • 3 IN,
1 rij
rt" : : 1
I
#4#
4.#
NOTES :
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE NOTED.
2. RESERVE APPROX. 2076 OF TOTAL NUMBER OF TRACERS FOR FUTURE USE.
(MINIMUM 2 NOS. OR AS DEFINED IN DESIGN BASIS)
3. SIZE OF STEAM SUPPLY LEAD LINES SHALL BE 1/2" & SUPPLY SUB HEADERS SHALL BE 1-1/2".
5. FOR HORIZONTAL OFFTAKES, SUFFICIENT OPERATING SPACE SHALL BE GIVEN FOR OPERATION
OF VALVES
6. SCRAP PIPE TO BE PROVIDED FOR OFFSMES FOR LOCATIONS WITH NO DITCHES NEARBY &
AREAS WHICH ARE NOT PAVED. FOR UNITS & OTHER PAVED AREAS, PROVIDE DRAIN UNES
TO CRWS / AG HEADER COLLECTING FUNNEL LOCATED NEAREST TO MANIFOLD.
7. MAXIMUM 12 NOS. OF SUPPLY LEAD UNES(INCLUDING SPARES) ARE PERMITTED PER
SUPPLY MANIFOLD.
8. SITE FABRICATED MANIFOLD MAY BE SUBSTITUTED BY STANDARD BOUGHT OUT MANIFOLDS WITH GLANDLESS
PISTON VALVES. MANIFOLDS CAN BE LOCATED IN HORIZONTAL ORIENTATION ALSO.
10. WHEN 1-1/2" STANDARD BOUGHT OUT MANIFOLD IS USED, SUBSTITUTE CAP AND HALF COUPUNG WITH
1 - 1/2" X 3/4' CONC. SWAGE AND 3/4' FULL COUPUNG.
11. MANIFOLD ISOLATION VALVE SHALL BE GLOBE VALVE. ALL OTHER VALVES SHALL BE GLANDLESS PISTON VALVES.
12. MISSING DIMENSONS TO BE FINALIZED DURING DETAILED ENGINEERING.
LOW POINT MANIFOLD
Avoi
4 12.06.18 REAFFIRMED & ISSUED AS STANDARD SPECIFICATION aSm, RKT
ANNEXURE-1
SPECIFICATION No.
#81111adak- MINERS 3 28.03.13 REVISED & ISSUED AS STANDARD SPECIFICATION UK SH RN ATD DM
No. by Page 1 of 8
by Approved by
Format No. 8-00-0001-F5 Rev. 0 Copyright EIL - All rights reserved
MANIFOLD WITH CONDENSATE RECOVERY MANIFOLD WITHOUT CONDENSATE RECOVERY NOTES :
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE NOTED.
6 CONDENSATE RECOVERY MANIFOLDS
5 e 2. RESERVE APPROX. 20R OF TOTAL NUMBER OF TRACERS FOR FUTURE USE
(MINIMUM 2 NOS. OR AS DEFINED IN DESIGN BASIS)
sT) 3. SIZE OF RETURN UNES SHALL BE 1/2" & CONDENSATE SUB HEADERS SHALL BE 13
ii t .1 4. CONDENSATE RETURN MANIFOLDS ARE TO BE NUMBERED. FOR DETAILS REFER
PAGE 3 OF 8 OF THIS ANNEXURE.
i-, I
i
zoo I SIZE 5. FOR HORIZONTAL OFFTAKES, SUFFICIENT OPERATING SPACE
SHALL BE GIVEN FOR OPERATION OF VALVES
6. SCRAP PIPE TO BE PROVIDED FOR OFFSITES FOR LOCATIONS WITH NO DITCHES
NEARBY & AREAS WHICH ARE NOT PAVED. FOR UNITS & OTHER PAVED AREAS,
3
PROVIDE DRAIN UNES TO CRWS COLLECTING FUNNEL LOCATED NEAREST TO MANIFOLD.
2 7. MAXIMUM 12 NOS. OF RETURN UNES(INCLUDING SPARES) ARE PERMITTED PER
CONDENSATE RETURN MANIFOLD.
8, SITE FABRICATED MANIFOLD MAY BE SUBSTITUTED BY STD. BOUGHT OUT MANIFOLDS
00 WITH GLANDLESS PISTON VALVES.
MANIFOLDS CAN BE LOCATED IN HORIZONTAL ORIENTATION ALSO.
00 9. WHEN 11/2" STD. BOUGHT OUT MANIFOLD IS USED, REDUCER SHALL NOT BE REQD.
10,WHEN STANDARD 1W MANIFOLD IS USED, SUBSTITUTE CAP AND
200 HALF COUPUNG WITH 1W' X 3/4" CONC. SWAGE.
14096R
rr 5.19
200
rie
00
200
.
offu
,
00
00
200
3 /4" 00
00
1'
of
iA Ir4
490
04)
3/4 "
TY
SIN
0
2:
.44.4.444
...
,r.:%I.:4.
. . ....., ••...••.. PER
..•
•...... `4„,..... ••.„,....
z401
.....
RElv
PN
SIJP
4%
so°
( 1)
4,44
CONDENSATE MANIFOLD NUMBERING SYSTEM
41116•. .44
.44 ( CR — 28 )
SYMBOL FOR CONDENSATE I SERIAL NO OF CONDENSATE
MANIFOLD OR DRAIN POINT MANIFOLD OR DRAIN POINT
ALTERNATE STEAM
SUPPLY LEAD 1/2" NB STEAM
SUPPLY LEADS
TRACED PIPE+
TRACER DIA TRACED PIPE+ 1 2" NB STEAM
ALTERNATE STEAM TRACER DIA 1
SUPPLY LEADS
SUPPLY LEADS
III 1/2" NB TRACERS 1 2"NB TRACERS
. ,
I z
1/2" NB TRACERS
1i 7-
i ---- ----- ----, 1
1/2" NB TRACERS
z 1 ".
Ir
I TRACERS
45 4 45" (TYP)
HEAT TRANSFER CEMENT (TYP.) HEAT TRANSFER CEMENT (TYP. HEAT TRANSFER CEM.(TYP)
HEAT TRANSFER CEMENT (TYP.) TO BE USED ONLY IN CASE OF TO BE USED ONLY IN CASE OF TO BE USED ONLY IN CASE OF
TO BE USED ONLY IN CASE OF TRACING BY MP/HP STEAM TRACING BY MP/HP STEAM / TRACING BY MP/HP STEAM
TRACING BY MP/HP STEAM
TRACERS "----4
OF BOLT
T_
PROCESS PIPE
•
TRACER TRACERS
t
...._U
1150(1 rP
HORIZONTAL PIPING
VERTICAL PIPING
NOTE 2
PROCESS
NOTES :
, /
PIE NOTE 1
1. BREAK—UP FLANGE SHALL BE USED ONLY WHEN FREQUENT
STEAM TRACE R DISMANTLING OF VALVE IS ENVISAGED AS IN CASE OF
CONTROL VALVES AND PSVs.
POSITION OF TRACERS ALONG PIPES AND 2. WHEN TRACING AROUND FLANGES, TRACER SHALL
STEAM TRACING AROUND FLANGES REMAIN IN HORIZONTAL PLANE.
TRACER ARRANGEMENT AROUND VALVES AND FLANGES
4 12.06.18 REAFFIRMED & ISSUED AS STANDARD SPECIFICATION —\\"/ PK ,ASH MI 3-,/ SPECIFICATION No.
ANNEXURE-1
ENGINIEERS 3 28.03.13 REVISED & ISSUED AS STANDARD SPECIFICATION UK SH RN ATD DM
STEAM TRACING 6-44-0007-A1 Rev. 4
Pow enowerwo
INDIA LIMITED Rev.
Date
Prepared Checked Stds. Committee Stds. Bureau
Convenor Chairman (TYPICAL DIAGRAMS)
(A Govt. of India Undertaking) Purpose Page 5 of 8
No. by by Approved by
Format No. 8-00-0001-F5 Rev. 0 Copyright EIL - All rights reserved
STEAM SUPPLY HEADER TRACED PIPES TRACING ARRANGEMENT IN OFFSITES - PLAN
1000
0
0
tr)
SUPPLY LEADS
100 EL. ♦
101300
100
1 I
•1
1!
:
100
100
61:,c 3 3
ii!i
..
!i! !I.
100 0470 I Iii ill
100
3
I III
APPROACH PATH WAY 100 it)41:1:0
I II
100
100
► •
A I I
100
SLEEPER
.,. EC MGM MG
MII•MMMI•M•IMIWMMPIO ■
1000 200 200 200 400 a,
II • PAVED AREA 1000 1
MIIN ■romisumiammirs
COEUEL•111NIM )1500
STEAM SUPPLY
EL ♦ 101100 CONDENSATE RETURN SUB HEADER
SUB HEADER
=1Wri -;-.-- 2
STREAM TRAP C)
STRAINER (TyP)
III MS I ► •
IgI
HEE
STEAM
11 110- • IH=H1
EL. OF UN ES 100 MM
BELOW SLEEPER ELEV
0
ALTERNATIVE ARRANGEMENT OF DRAINAGE FOR CONDENSATE 0
tn
RETURN SUB HEADER SCRAP PIPE WITH GRAVEL
j.
STEAM SUPPLY MANIFOLD
SEE NOTE-1
♦ 101650 me-
SUPPLY LEADS
.4F-Z-V—+N NOTES: -
TO TRACERS
N STEAM SUPPLY HEADER
TO MANIFOLD 1. IN CASE OF SEVERAL TRACERS RUNNING
TOGETHER BOX TYPE INSULATION IS PERMISSIBLE
0I
Oi SUPPLY LEADS LINES TRACERS
2. VALVES & STEAM TRAPS SHALL BE STAGGERED
WHENEVER TWO OR MORE TRACERS RUN
TOGETHER AT THE MANIFOLDS
J1
♦ 101300
EL 100300
(MAX.)
SLEEPER
V100000 PAVED AREA SUPPORT
FINISHED GRAdE
•
•
/ 1000 1000
LIMIT FOR PAVINNG
GENERAL ARRANGEMENT FOR SUPPLY
INSULATION
UMIT
350 200 200 I 200
♦ EL.101100
I—I ST H 0
TRACERS
•
CONDENSATE
• 0
0
INSULATION RECOVER
MANIFOLD CONDENSATE RETURN
SEE NOTE-1 SUB HEADER
RETU RN
EL. 100450
• AR
SURFACE DRAIN
(SEE NOTE 6 ON
EL 100300 PAGE 3 OF 8 )
(MAX.)
SLEEPER EL 100200
SUPPORT
500 500
1000
LIMIT FOR PAVING
LIMIT FOR PAVING
GENERAL ARRANGEMENT FOR RECOVERY
4 12.06.18 REAFFIRMED & ISSUED AS STANDARD SPECIFICATION •"PK 2?cASH MI SPECIFICATION No.
ANNEXURE-1
#51RaddlikENIGINEERS 3 28.03.13 REVISED & ISSUED AS STANDARD SPECIFICATION UK SH RN ATD DM
blig7 WelreUlar LIMTE) Stds. Committee Stds. Bureau STEAM TRACING 6-44-0007-A1 Rev. 4
Rev. Prepared Checked
(A Govt. of India Undertaking) Date Purpose Convenor Chairman (TYPICAL DIAGRAMS)
Page 7 of 8
No. by by Approved by
Format No. 8-00-0001-F5 Rev. 0 Copyright EIL - All rights reserved
TYPICAL TRACING ARRANGEMENTS IN UNITS
FEED FROM SUPPLY
LEADS
TO STEAM TRAP
INSTRUMENT TRACING
INSTRUMENT TRACING
NOTES :
1. BRANCHING OF SUPPLY LEAD UNE IS
PERMITTED PROVIDED THE TOTAL LENGTH
OF TRACED LINES DOES NOT EXCEED
THE USEFUL LENGTH OF TRACERS AS
SPECIFIED IN CLAUSE NO. 4.6.4.2 OF
SPECIFICATION 6-44-0007.
2. REFER CLAUSE NO. 4.6.4.3(d) OF
SPECIFICATION 6-44-0007.
TO STEAM TRAPS
No. by by Page 8 of 8