PERHITUNGAN BEBAN TERBAGI RATA PELAT BETON

BEBAN TERBAGI RATA = 5,00 ton/m2

Weight of Concrete Floor = 0,20 x 2,40 t/m3 = 0,48 t/m2


Weight of Sand Gravel = 0,20 x 2,20 t/m3 = 0,44 t/m2
Weight of Gravel = 0,30 x 2,20 t/m3 = 0,66 t/m2

CHECKING STRESS AT Sand Gravel LAYER


Weight of Concrete Floor = 1,00 x 0,48 t/m2 = 0,48 ton
Total weight = 5,00 + 0,48 ton = 5,48 ton
C.B.R. of Sand Gravel = 60 %
σ = 0,80 x 60,00 t/m2 = 48,00 t/m2
Beban yang dapat dipikul = 1,00 x 48,00 t/m2 = 48,00 ton
OK > 5,48 ton
CHECKING STRESS AT Gravel LAYER
Weight of Sand Gravel = 1,00 x 0,44 t/m2 = 0,44 ton
Total weight = 5,48 + 0,44 ton = 5,92 ton
C.B.R. of Lime Stone = 30 %
σ = 0,80 x 30,00 t/m2 = 24,00 t/m2
Beban yang dapat dipikul = 1,00 x 24,00 t/m2 = 24,00 ton
OK > 5,92 ton
CHECKING STRESS AT Compacted Soil LAYER
Weight of Gravel = 1,00 x 0,66 t/m2 = 0,66 ton
Total weight = 5,92 + 0,66 ton = 6,58 ton
C.B.R. Of Compacted Soil = 8,5 %
σ = 0,80 x 8,50 t/m2 = 6,80 t/m2
Beban yang dapat dipikul = 1,00 x 6,80 t/m2 = 6,80 ton
OK > 6,58 ton

Note : Daya dukung masing-masing lapisan perkuatan dihitung per satuan m2.

Minimum CBR of Soil = 8,5 %