BACK UP DATA MC - 0%

Proyek : REKONSTRUKSI JEMBATAN JENGGU DISTRIK GRESI SELATAN Back Up No : MC 0


Bulan : -
Item Pekerjaan : 7.1.(5a). Beton struktur, fc’20 Mpa Lembar : 2.00
dari : -

TABEL BARBENDING (ABUTMENT)

JARAK PANJANG TOTAL BERAT JUMLAH


BENTANG DIAMETER JUMLAH BERAT TOTAL
NO. SKETSA KODE AS - AS A B C D PANJANG UNIT UNIT
(m) (m) (m) (m) (m) (m) (m) (m) (Batang) (kg) (buah) (kg)
1 A1 8.90 0.15 0.03 3.90 0.90 0.90 0.15 6.00 61.00 3.85 1.00 1,409.61

2 A2 7.90 0.15 0.03 0.98 1.58 1.58 0.15 4.44 54.00 3.85 1.00 923.41

3 A3 7.90 0.15 0.025 4.40 0.50 - 0.15 5.20 54.00 3.85 2.00 2,162.95

4 A4 7.90 0.15 0.025 4.40 - - 0.15 4.70 54.00 3.85 2.00 1,954.97

5 A5 7.90 0.15 0.02 1.97 0.67 1.32 0.11 4.19 54.00 2.22 1.00 503.09

6 A6 7.90 0.15 0.02 1.49 1.08 0.45 0.11 3.25 54.00 2.22 1.00 390.17

7 A7 7.90 0.15 0.02 1.73 0.20 1.24 0.10 3.36 54.00 1.58 1.00 286.40
8 A8 8.90 0.15 0.02 3.90 - - 0.10 4.09 31.00 1.58 1.00 200.11

9 A9 8.90 0.15 0.02 0.97 - - 0.10 1.16 61.00 1.58 1.00 111.82

A9 8.90 0.15 0.02 1.02 - - 0.10 1.21 61.00 1.58 1.00 116.63

A9 8.90 0.15 0.02 1.07 - - 0.10 1.26 61.00 1.58 1.00 121.44

A9 8.90 0.15 0.02 1.12 - - 0.10 1.31 61.00 1.58 1.00 126.25

A9 8.90 0.15 0.02 1.17 - - 0.10 1.36 61.00 1.58 1.00 131.06

A9 8.90 0.15 0.02 1.22 - - 0.10 1.41 61.00 1.58 1.00 135.88

A9 8.90 0.15 0.02 1.27 - - 0.10 1.46 61.00 1.58 1.00 140.69

A9 8.90 0.15 0.02 1.32 - - 0.10 1.51 61.00 1.58 1.00 145.50

A9 8.90 0.15 0.02 1.37 - - 0.10 1.56 61.00 1.58 1.00 150.31

10 A10 7.90 0.15 0.02 0.90 - - 0.11 1.13 54.00 2.22 4.00 542.01
11 A11 7.90 0.15 0.02 1.82 - - 0.11 2.05 54.00 2.22 1.00 246.02

A11 7.90 0.15 0.02 1.61 - - 0.11 1.84 54.00 2.22 1.00 220.79

A11 7.90 0.15 0.02 1.39 - - 0.11 1.62 54.00 2.22 1.00 194.37

A11 7.90 0.15 0.02 1.18 - - 0.11 1.41 54.00 2.22 1.00 169.14

12 A12 7.90 0.15 0.01 0.45 - - 0.08 0.61 54.00 1.04 2.00 68.16

13 A13 7.90 0.15 0.01 0.20 - - 0.08 0.36 54.00 1.04 5.00 100.10

14 A14 3.90 0.15 0.02 8.90 - - 0.11 9.13 27.00 2.22 1.00 548.26

15 A15 4.14 0.15 0.02 8.90 - - 0.11 9.13 29.00 2.22 1.00 588.87

16 A16 0.02 8.90 - - 0.11 9.13 54.00 2.22 1,096.52

17 A17 1.52 0.15 0.02 7.90 - - 0.11 8.13 12.00 2.22 2.00 433.95

18 A18 0.87 0.15 0.019 7.90 - - 0.11 8.13 5.00 2.22 2.00 180.81

19 A19 0.019 7.90 - - 0.11 8.13 11.00 2.22 198.89

20 A20 0.016 7.90 - - 0.10 8.09 6.00 1.58 76.59

21 A21 0.78 0.15 0.013 7.90 - - 0.08 8.06 6.00 1.04 2.00 100.68

22 A22 7.90 0.15 0.019 1.97 - - 0.11 2.20 54.00 2.22 4.00 1,056.16

25 A25 7.90 0.15 0.02 0.90 - - 0.11 1.13 54.00 2.22 3.00 406.51

26 A26 3.90 0.15 0.025 3.27 - - 0.15 3.57 1.00 3.85 2.00 27.50

A26 3.90 0.15 0.025 2.67 - - 0.15 2.97 1.00 3.85 2.00 22.88

A26 3.90 0.15 0.025 2.07 - - 0.15 2.37 1.00 3.85 2.00 18.26

A26 3.90 0.15 0.025 1.47 - - 0.15 1.77 1.00 3.85 2.00 13.63

JUMLAH 15,320.41

TOTAL 2 ABUTMEN 30,640.82

Diketahui Oleh: Diperiksa Oleh: Dihitung Oleh:


PPK BADAN PENGANGGUALANGAN BENCANA DAERAH Konsultan Supervisi Penyedia Jasa
KABUPATEN JAYAPURA CV. ZALIKA ENGINEERING CV. PAPUA BERKAT MANDIRI

GUSTAF WERSAY, ST MUS HAFANUDDIN. F, ST RANDI FABRIAN TANSIL, ST


NIP: 19750814 199603 1 003 Supervision Engineering Site Manager