Professional Documents
Culture Documents
Atimonan Mdrrmo Upgrading Phase 1 Phase 2
Atimonan Mdrrmo Upgrading Phase 1 Phase 2
Atimonan Mdrrmo Upgrading Phase 1 Phase 2
Stranded Wires, Iron Box, Junction Box, Flexible Hose, Tapes, Clamps, SC 1 lot 30,000 30,000
Electrical Materials
Connectors, Cords, Plug, Electrical Sockets, Adaptors, so fort and ETC.
Total Materials 510,000
Labor Cost 200,000
Grand Total 710,000
Best Regards,
MZM IT SOLUTIONS
RECIEVED BY:
ZALDY C.GUANZON
Project Operation Manager