Special portal required at Ujhani Yard

ITEM NO. DESCRIPTION Part No. Total Required REMARKS

1 PL.25Tkx315x315 CL2 84

2 PL.12Tkx120x150 CL2 168

2A PL.8Tkx150x150 CL2 84

2B PL.8Tkx125x150 CL2 84

3,4,5,6 L150x150x12Thk CL2 21,21,21,21

7 L80x80x6Thk CL2 336

8 L80x80x6Thk CL2 294

9 L80x80x6Thk CL2 42

10 L130x130x12Thk CL2 42

11R,11L L130x130x12Thk CL2 21,21

12 PL.12TKx980x1140 CL2 42

12A L100x100x10Thk CL2 42


Loding under progress from HCP Store to
12B,12C L100x100x10Thk CL2 42,42 Ujhani

13 L60x60x6Thk CL2 336

14 L60x60x6Thk CL2 294

15 L60x60x6Thk CL2 42

16 , 16A L130x130x10Thk CL2 21,21

17 L130x130x10Thk CL2 84

17A L100x100x10Thk CL2 84

18 L130x130x10Thk CL2 21

19,19X L100x100x10Thk CL2 63,21

20 L130x130x10Thk CL2 21

21, 21A L130x130x10Thk CL2 21,21

22 L100x100x10Thk CL2 21
Special portal required at Ujhani Yard
ITEM NO. DESCRIPTION Part No. Total Required REMARKS

23L, 23R L100x100x10Thk CL2 21,21

23 L150x150x12Thk Covering Angle 352 will transfer from HCP to Ujhani by


06.1.2020
10/22 10 Reached Ujhani Balance will Reached by
24 EL1 EL1 04.1.2020
11/22 11 Reached Ujhani Balance will Reached by
25 EL2A EL2A 04.1.2020

09/11
2 Nos. will transfer from HCP to Ujhani by
26 CPL2 CPL2 06.1.2020/09 Nos Reached Ujhani
will transfer from HCP to Ujhani by
27 CPL5 CPL5 11 06.1.2020
BOLTS, NUTS & REQUIREMENTS (5.6 G)
28 M16 BOLT & NUT 45mm 7260
29 M16 BOLT & NUT 50mm 900
30 M16 BOLT & NUT 55mm 2190
31 M16 BOLT & NUT 60mm 480
32 M16 BOLT & NUT 65mm 30 Loding under progress from HCP Store to
33 M20 BOLT & NUT 50mm 2400 Ujhani
34 M16 PACK WASHER 6mm THK 1080
35 M16 PACK WASHER 10mm THK 60
36 M16 PACK WASHER 12mm THK 690
37 M16 SPRING WASHER 3.5mm THK 10620
38 M20 SPRING WASHER 4mm THK 2400

*** All Material will Reach at Ujhani by 07.01.2020