Site Safety

PART VI
Supervisor
Competency Course

1
Introduction

 Excavations were done for preparation of


foundation, sewerage and other underground
utilities.

Nov. 2020
Introduction

 Excavation:

- A man-made cut, cavity, trench, or


depression in the earth’s surface formed
by earth removal

- The width is wider that the depth.

Nov. 2020
Introduction

 Trenches:

- A narrow underground excavation.

- Depth is deeper than the width.

Nov. 2020
Introduction

Typical Plant/Machinery

Excavator
Dumper Truck

Backhoe
5

Nov. 2020
Introduction

 1m 3 of soil is approximately 1.5 tonnes.


 A small fall of earth is capable of causing
serious injury and even worse might result in
fatality.

Nov. 2020
Introduction

Factors Affecting Stability


Rain
Insufficient
Large Load Shoring Vibration

Settlement Cracks High Water


Seepage Table
Broken Pipe Line
7

Nov. 2020
Typical Hazards

 Collapse of side due to lack of or


inadequate or weak shoring.
 Workers falling into excavation due
to lack of barriers or inadequate
fencing.
 Asphyxiation from exhaust gases
from plant, machinery and other
work process which collected at the
bottom of excavation.

Nov. 2020
Typical Hazards

• Falling of soil placed at


edge of excavation.

• Failure to maintain
shoring/support system.

 Workers working too close


together or to machinery.

Nov. 2020
Typical Hazards

 Falls through the unsafe means of access


and egress.

 Vehicles being driven into the excavation due


to driving errors, inadequate barriers, or due
to absence of stop-blocks.

10

Nov. 2020
Typical Hazards

• Striking of underground
services such as gas lines,
water mains and electrical
cables.

 Collapse of adjacent structure due to


disturbance to its foundations.

11

Nov. 2020
General Control Measures

Planning

 Nature and condition of soil – types and failure


mode, and previous use of land.

 Weather condition and ground water level.

 Proximity of adjacent structures and


underground services.

12

Nov. 2020
General Control Measures

Planning

 Size of work and method of excavation.

 Underground services.

 Types of side protection.

13

Nov. 2020
General Control Measures

Sides Protection

Sloping &
Benching
Shoring

Trench Box
14

Nov. 2020
General Control Measures

Prior to Commencement
 Conduct HIRARC or JHA.

 Brief workers on hazards and control measures.

 Equipped with necessary tools and PPE.


 Check soil condition – stability.

15

Nov. 2020
General Control Measures

Prior to Commencement
 Availability and adequacy of support material.

 Machinery and plant in good working condition –


inspected by operators.

16

Nov. 2020
General Control Measures

Prior to Commencement
 Locate and mark underground services.

 Adequately support adjacent structures.

17

Nov. 2020
General Control Measures

Prior to Commencement
 Machinery and plant are sitting on firm ground or
base.

 Post warning and directional signs at


conspicuous locations.

 Installed and operate deep well for lowering


underground water level.
18

Nov. 2020
General Control Measures

Prior to Commencement
 Provide water pumps, if needed.

 Install stop blocks for reversing dumping


vehicles.

19

Nov. 2020
General Control Measures

During Excavation
 Supervise by competent designated person.

 Workers are wearing the necessary PPE.

 Segregate work area and pedestrian route.

20

Nov. 2020
General Control Measures

During Excavation
 Ensure safe working distance between workers
and machinery.

 Non-operators kept away from machinery.

21

Nov. 2020
General Control Measures
During Excavation
 Provide safe mean of access and egress –at
every 30m.

 Excavated soil (spoil) deposited at a distance of


610mm from edge of excavation.

22

Nov. 2020
General Control Measures
During Excavation
 Sides are protected as work progressing.
 Continuously check stability or adjacent
structures.

 Keep water pumps running in watery areas.

23

Nov. 2020
General Control Measures

During Excavation
 Conduct gas test where appropriate.

 Provide adequate warning lights for work in


dark hours.

24

Nov. 2020
General Control Measures
Safe Digging Practices
 Consult service provider and get service plan
from them.

 Hand dig trial pits – confirm position of services.

25

Nov. 2020
General Control Measures

Safe Digging Practices


 Continuously hand dig until all services are
covered.

 Notify superior and service provider for


damaged services, and keep away from it.

 Notify service provider if position of services


differ from service plan.

26

Nov. 2020
General Control Measures

Upon Completion
 Clear off all debris, spoils, signs – return back
the workplace to normal condition.

27

Nov. 2020
Discussion

1. What is excavation?

2. Factor to be consider before execute excavation?

3. Type of machinery use for excavation?

28

Nov. 2020
30

Nov. 2020