Kick Off Meeting Agenda
1. Introduction
1.1. Project team list, identify authorized representative and contact directory
1.2. Contactors team list and contact directory
1.3. Contractors’ organization structure (off-site & on-site)
2. Project Insurances& Bonds Requirement (Needs to be listed specifically and reiterated with
details)
2.1. Contractors’ insurances (written confirmation in place prior to start on site, copy of
policies and receipt of premium within days prescribed in the Contract)
2.1.1. Third Party Liability Insurance
2.1.2. All Risk Policies
2.1.3. Workmen’s Compensation Insurance (Plant & Machinery Insurance)
2.1.4. Others as per contract
2.2. Bonds
2.2.1. Performance Bond
2.2.2. Retention Bond
2.2.3. Advance Payment Bond
2.2.4. Others as per contract
2.3. Contract requirements (i.e., Sign off document, BOQ, etc.)
3. Building Permit
3.1. Design NOC’s (The Engineer to handover copies of valid NOCs to the Contractor)
3.2. Construction NOC’s and Building Permit (requirements and discussion)
3.2.1. Update by the Contractor and explanation of plans
3.2.2. Permits Fees Payment
4. Working Hours
Page 1 of 3
Consultant Contractor
4.1. Contractors’ hours of work Logo Logo
4.2. Project teams hours of works
4.3. The Engineers Overtime
6. Quality
6.1. Employer’s Basic QA/QC Requirements for Construction Projects)
6.2. Contractor’s Quality Plan (Project Specific).
6.3. Document management system.
6.4. Quality Resources.
6.5. Quality Meeting.
6.6. Quality Reporting and KPIs.
8. Communication Protocol
Page 2 of 3
Consultant Contractor
8.1. Systems Logo Logo
8.2. Procedures & Protocols
8.3. Responsibility/ Authority Matrix
9. Programme
9.1. Baseline Programme – (Resource Loaded). Major milestones to be identified.
9.2. Schedule of all submissions
9.2.1. Shop Drawing submittals
9.2.2. Material submittals
9.2.3. Specific Method Statements
9.2.4. Sub-Contractors
9.3. Resource histogram- Machinery and Manpower
9.4. look ahead programme
9.5. Testing and commissioning
9.6. As-built drawings
9.7. O&M Manuals
9.8. Warranties & Guarantees
9.9. Spares
9.10. Office Relocation and Demobilization
11. Commercial
11.1. Breakdown of Preliminaries
11.2. Cash flow
11.3. Invoicing
11.4. Monthly Statement Format
11.5. Change Control Process
11.6. Nominated sub-contractor as applicable
11.7. Provisional sums and PC rates
Distribution:
SEHA / SSMC PMC The Engineer Contractor