25FEB1092
25FEB1092
00 30-Jun-17
SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
SAIC-H-
1.2 Coating Equipment Inspection SAIC-H-2026
2026 RH RH
CPP-NGCP-H-29051
Review of Coating Personnel SAIC-H-
1.3
Qualification and Certification
SAIC-H-2010
2010 RH RH
RECEIVING
2.0
INSPECTION
3.0 INSTALLATION
Concrete Coatings and Pre-Installation SAIC-H-
3.1
Inspection
SAIC-H-1003
1003 H H SATR-H-1003
SAIC-H-
3.2 Coating and Final Installation Inspection SAIC-H-1004
1004 I W
4.0 PRE-COMMISSIONING
EPM-
4.1 Not Applicable
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
4
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection/Test
SAUDI ARAMCO ID/PIEU-30-Oct-2017- REV. 2017.06.00 (Standards Cutoff -June 30, 2017) Rev. 2017.06.00 30-Jun-17
CPP-NGCP-H-29051
Concrete Coatings Pre-Installation Inspection SAIC-H-1003 30-Oct-17
EPM-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
The coating shall be applied after the full curing time of concrete in SAES-H-003
A1
accordance to SAES-Q-001. Sec. 8.1.4
Remove any protrusions and sharp edges with an abrasive carborundum SAES-H-003
A4
brick, power grinding, or power brushing prior to coating concrete. Sec. 7.2.1.1
Surfaces shall be sound such that a metal object run over the concrete SAES-H-003
A5
shall not loosen any particles. Sec. 7.2.1.1
New concrete shall be roughened to the texture of medium grit sandpaper SAES-H-003
A8
by grit blasting when it has a troweled or "formed" smooth surface. Sec. 7.2.1.4
The tensile strength of heavy duty surface concrete by ASTM D4541 shall
SAES-H-003
A9 meet or exceed 175psi for immersion service and 260 psi for industrial
Sec. 7.2.2
floors.
CPP-NGCP-H-29051
Concrete Coatings Pre-Installation Inspection SAIC-H-1003 30-Oct-17
EPM-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
NORTH GAS COMPRESSION PLANTS PIPELINE PROJET 10-02029-0003 CPP
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Concrete surfaces (such as acid waste neutralizing tanks) that have been
SAES-H-003
A12 in prolonged contact with acids require a minimum soak of 24 hours at a
Sec. 7.3.2b
pH of 7-8, agitating the solution during soaking.
After rinsing, force air dry surfaces for at least 24 hours prior to making SAES-H-003
A13
any repairs to the concrete. Sec. 7.3.2b
Neutralize alkaline surfaces by steam cleaning. ASTM D4262 ---
SAES-H-003
A14 "Standard Test Method for Determining pH of Chemically Cleaned or
Sec. 7.3.2c
Etched Concrete Surfaces" shall be performed.
All voids shall be prepared, primed and filled using suitable and
SAES-H-003
B3 compatible epoxy filler prior to coating. The epoxy filler materials shall be
Sec. 7.4.4
approved by the Civil and/ or the Coating engineers of the CSD.
SAES-H-001
B6 Paints shall not be used from a container showing a sign of leakage.
Sec. 6.2.4
REMARKS: surface prepration inspection prior to application of ( APCS - 1B ) has been done and found
acceptable on foundations type Guard rail-01nos, Ps02A-01nos, Ps02-01nos, Ps06A-01nos
Ps06-01nos , Ps01-01nos, Ps05-01nos , Ps04-01nos , Ps03-01nos , Skid foundation-06nos
Stair foundation-02nos, H2S-01nos @ HWYH-OPTF-1092
REFERENCE DOCUMENTS:
1- SAES-H-003 -- Coating Requirements for Concrete Surfaces, 25 September 2012
2- SAES-H-001 - Coating Selection and Application Requirements for Industrial Plants and Equipment, 5 April 2016
3- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 07 January 2016
CPP-NGCP-H-29051
Concrete Moisture Field Test (For Coating Purposes) SATR-H-1003 30-Oct-17
EPM-
Note : SATR-H-1003 forms part of SAIC-H-1003 (Concrete Coatings Pre-Installation Inspection)& other related coating
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
Test Procedures shall be in accordance with (SAES-H-003 Sec. 9.6.9/ ASTM D4263) OR
1- Tape a 4 mil thick (0.1mm), 18"x 18" (450mm x 450mm) of clear plastic sheet to the surface to be coated; tape all around with duct tape.
2- Sheet shall remain in place for a minimum of 16 hours. Indicate number of hours sheet has been in place:_____ hrs.
REMARKS: Field moisture test was done as per ASTM-D 4263 and Found acceptable on foundation type
Guard rail-01nos, Ps02A-01nos, Ps02-01nos, Ps06A-01nos , Ps06-01nos , Ps01-01nos, Ps05-01nos , Ps04-01nos ,
Ps03-01nos , Skid foundation-06nos , Stair foundation-02nos, H2S-01nos @ HWYH-OPTF-1092
REFERENCE DOCUMENTS:
1- SAES-H-003 -- Protective Coatings for Industrial Concrete Structures, 25 September 2012
2- SAES-H-001 - Coating Selection and Application Requirements for Industrial Plants and Equipment, 5 April 2016
3- SAES-Q-001 -- Criteria for Design and Construction of Concrete Structures, 07 January 2016