Professional Documents
Culture Documents
H8 Operation Flow Chart
H8 Operation Flow Chart
Prepare Calibrator:
Prepare QC sample: 1. Take out calibrator from refrigerator, wait
1. Take out QC from refrigerator, wait it Start manually Start automatically it until room temperature.
until room temperature. 2. Use pipette inject 100ul distilled water
2. Use pipette inject 100ul distilled or de-ionized water into calibrator bottle.
water or de-ionized water into QC 3. Wait 30 minutes until it fully re-dissolve.
bottle. 4. Aliquot the re-dissolve sample, 10ul in
3. Wait 30 minutes until it fully re- each EP tube, 1 bottle can aliquot in 10 EP
dissolve. tubes.
Confirm machine statement
4. Aliquot the re-dissolve sample, 10ul in
each EP tube, 1 bottle can aliquot in 10 Doing Calibration:
EP tube.
1. Use pipette inject 1,500ul L eluent into
EP tube, mixed it well;
Doing QC: 2. Input calibration information in
1. Use pipette inject 1,500ul L eluent calibration interface;
into EP tube, mixed it well; 3. Place the samples inside sample rack, the
Doing calibration
2. Input QC information in QC interface; sequence is: WB, C1, WB and C2.
3. Place the samples inside sample rack, 4. Doing the calibration in Cal. interface.
the sequence is: WB, QC1, WB and QC2. TIPS:
4. Doing the Auto QC in QC interface. 1. The aliquot sample needs to storage in -
TIPS: 20℃, it can storage for 14 days;
1. The aliquot sample needs to storage in 2. Calibrator bottle need to storage at
-20℃, it can storage for 14 days; Doing daily QC 2~8℃.
2. QC bottle need to storage at 2~8℃.
: Necessary steps
: Optional steps