Professional Documents
Culture Documents
NHM-ETC-051200-DG-00-0A5101-009-PDF (A1) Code B
NHM-ETC-051200-DG-00-0A5101-009-PDF (A1) Code B
MECCA
01 02 03
04 05 06
07 08 09
RESULT STATUS:
A Approved
B Approved with Comments
C Revise & Resubmit
IMPORTANT: Corrections or comments made to the drawings during the
review do not relieve the contractor from compliance with the requirements of
drawing and specifications. The review is only for the general conformance
with design concept and general compliance with the information in the
contract documents. Contractor responsible for confirming and correlating all
quantities and dimensions; selecting fabricating process and techniques of
WME Comments: construction; coordinating his works with that of all trades; and performing his
work in a safe and satisfactory manner. This approval represents our review
2 nos of stiffener in Idea of the submitted document only for those modifications requested herein or in
Statica is not matching. previous submissions or as specifically noted by Contractor in this
submission. Any other modification to this drawing by the Contractor of
Update the detail previously reviewed submittal is specifically disapproved. It is understood that
Engineer s notation on submittal is not to be construed as authorization for
additional work cost.
VIDYA VENKATESH
28-03-23
Vy
Vx EYAS MOHAMMED
.....................................................................................................................................................
NAME SIGNATURE
EMPLOYER:
Miral Asset Management LLC
PO BOX 147774,Miral HQ,
MAIN CONTRACTOR:
ALEC Engineering and Contracting
L.L.C.
P.O.Box 27639
Dubai U.A.E
Tel: 04-429 0599
Fax: 04-429 0216
SUB CONTRACTOR:
HEAD OFFICE
PO.BOX : 21391,RAS AL KHAIMAH,UAE
TEL. : +971-(7)-2584218 / 2584220
FAX : +971-(7)-2584393 / 2584296
BRANCH OFFICE
PO.Box 48582, Dubai, U.A.E.
TEL. : +971-4-2674707
www.extracoindusties.com
FAX : +971-4-2675072
metalworks@extracoindustries.com
PROJECT NAME :
ZONE :
SAADIYAT CULTURAL WATERFRONT
SECTOR NO : PLOT NO :
Sector PLOT SC11-012
Vy PROJECT DESCRIPTION :
Vx
WME Comments: Code B: Approved with comments
1. It is contractor's responsibility to ensure that, all details in calculations are matching
DIA OF LEG
with drawings MIN LEGS
2. It is Contractor’s responsibility to coordinate the connection detailing with all other trades to avoid conflicts, respecting the constraints of
the IFC drawings and ensure that the Architectural intent shall TENSION
not be compromised. NIL NIL
3. It is Contractor’s responsibility to ensure that considered design
SHEAR T20
forces are as per the 5(Vx or
Contract Documents & alternative
Vy) values verified and
agreed with the Consultant as extracted from the latest shared ETABS model.
4. The erection engineering/ sequence analysis is part of contractor scope of work. Contractor should ensure that connection design forces will A1 ISSUED FOR APPROVAL SBN 15-MAR-23
not exceed the IFC forces (or) analysis model forces due to locked in stress during erection. A0 ISSUED FOR APPROVAL SBN 31-DEC-22
5. Shop drawing comments to be read in conjunction with calculation comments REV NO DESCRIPTION DRAWN DATE
DRAWING REVISIONS
6. This approval does not relieve the contractor from full compliance with comments, contractual obligations, responsibilities and local
PROJECT ID : DRAWN BY: DRAWING SIZE :
authorities requirements.
B1N-2021-007568 SBN A0
SUBMISSION DATE : CHECKED BY : APPROVED BY : SCALE :
15-MAR-23 RJS IPC As Indicated
DRAWING TITLE :
PHASE- 1
LEVEL-1 GALLERY AREA UHPC
WALL EMBED DETAIL (SHEET-03)
DISCIPLINE :
STRUCTURAL
DRAWING NO : REV NO:
NHM-ETC-051200-DG-00-0A5101-009